Loading...
HomeMy WebLinkAbout2007 12 10 Consent 207 Contract J Raymond ConstructionCOMMISSION AGENDA ITEM 207 ADD-ON December 10, 2007 Meeting Consent X Information Public Hearin Re ular MGR. /De t. ;~ REQUEST: Community Development Department, Urban Beautification Division, requesting permission from the City Commission for the City Manager to enter into a contract with J. Raymond Construction for the construction of sidewalk improvements in front of Building 4 in the Town Center at a cost of $73,552. PURPOSE: This agenda item is needed for the City to enter into a contract agreement for public sidewalk improvements in front of Building 4 of the Town Center to coincide with the completion of building construction. CONSIDERATIONS: • Town Center Building 4 is currently under construction at Tuskawilla Road, north of Tree Swallow Drive, directly adjacent to Building 3. Construction of Building 4 is expected to be complete within the next 45 to 65 days. The original design plans for Building 4 maintained the existing angled on-street parking in front of the building along Tuskawilla Road. The City desires to have the on-street parking in front of Building 4 converted to parallel parking to create wider sidewalks along Tuskawilla Road, similar to the existing sidewalks in front of Buildings 1, 2 and 3. In addition, the Building 4 finished floor elevation has been set based on the planned conversion to parallel parking; therefore, it would be difficult to maintain the existing diagonal parking and still meet sidewalk design standards. • The sidewalk in front of Building 4 must be complete before a certificate of occupancy can be granted and tenants can occupy the building. 121007 COMM Consent 207_Building_4_Sidewalk Add-On 121007_COMM_Consent_207_Building_4_Sidewalk_Add-On Page 2 of 2 The City solicited proposals from the following companies pursuant to construction of this project with the following results. Construction Firm Result Southland Construction, Inc. Declined bid R.A. Rogers Construction Company Declined bid J. Raymond Construction $73,552 Southeast Enviroscape, Inc. Declined bid JDC/Isis Construction Declined bid FUNDING: Funding for this project will come from the Road Improvements Fund Line Code (11 S- 65000-3011A) in the amount of $73,552, payable to J. Raymond Construction, as outlined in the construction cost estimate provided to the City on October 15, 2007. RECOMMENDATIONS: It is recommended the Commission authorize the City Manager to enter into a contract agreement with J. Raymond Construction for the construction of sidewalk improvements in front of Building 4, as per plans provided by Starmer Ranaldi Architecture, Inc., in the amount of $73,552. ATTACHMENTS: A) J. Raymond Construction Cost Estimate (October 15, 2007) B) Building 4 Sidewalk Project Design - Starmer Ranaldi Architecture, Inc. (August 21, 2006) COMMISSION ACTION: Town Center Building 4 Sidewalk Redesign J Raymond Construction Construction cost estimate 465 West Warren Avenue Longwood Florida 32750 15-Oct-07 Contact: Scott Bryan Plan Sheet Al & A2 dated 6/1/06 407-948-3384 J. R A Y M Q N Architect: Starmer Ranaldi ecMSYwucT~oN Demolition and rework of all pavers along Tuskawilla Rd. at Bldg. 4 Descri tion Quantit unit cost Subtotal Total Demolition remove curb 150 If $10.00 $1,500.00 Repair/compactsubgrade 1 EA $1,500.00 $1,500.00 Remove existing planter & structure 1 ea $1,500.00 $1,500.00 remove pavers 1750 sf $1.50 $2,625.00 dumpsters for debris 5 ea $500.00 $2,500.00 remove striping 1 ea $750.00 $750.00 Relay existing Pavers 1100 sf $2.00 $2,200.00 Concrete surveying 1 EA $1,000.00 $1,000.00 new curb and gutter 140 If $23.00 $3,220.00 planter foundations 3 cy $500.00 $1,500.00 ribbon cuffing 250 If $22.00 $5,500.00 Handicap Ramp (block out for ADA pavers) 1 EA $1,000.00 $1,000.00 Masonry 8" CMU 180 blk $12.00 $2,160.00 filled cells 10 cy $150.00 $1,500.00 precast wall cap 72 If $30.00 $2,160.00 New pedestrian concrete pavers 3000 sf $6.00 $18,000.00 Seal new pavers 3000 sf $0.50 $1,500.00 ADA Handicap Pavers 50 sf $10.00 $500.00 Miscellaneous Trash Receptacle 1 EA $500.00 $500.00 Keystone Ridge Benches (2) 2 EA $750.00 $1,500.00 Arcustone on Planter walls 150 sf $10.00 $1,500.00 Stucco inside of planter walls 150 sf $7.00 $1,050.00 Landscaping by city $0.00 Irrigation 1 Is $1,200.00 $1,200.00 Empty Conduit for speakers 1 Is $1,000.00 $1,000.00 Light Pole relocate by City $0.00 Electric in planters 1 Is $2,000.00 $2,000.00 Tree grates by City $0.00 General Contractor supervision 3wks $1,500.00 $4,500.00 General Contractor general conditions 3wks $1,000.00 $3,000.00 Construction subtotal $66,865 Overhead and profit 10 % $6,687 Project total x73,552 A+}~~~M~+ ~~~ ~~ ~~~~r~a ~~~~~~ ~~~~~~~ IaQ~~~ 9 ~ Q6~9 ~~ ~; ~fda 404 ~~ .~ A 4 a ~ ~~~ ~° a,b~ ~ '~ ~~ # ~.... ~ ~ W.S. Town Center [ ~ F a a ~ ~ &~, 3 nd 4 8Ma-Waft Re-0eelyn 'r whtar SprYgs, FlorWa ~ Plan ~~ ~ ~~ .~ ~g I I 1 A~~~~ ~~~~ ~~ R ~#; ~ ~ 5~i ~~~~ ~~ ~~ a ~~ ~;; ~~ ~~ ~~~ ~_~~ ~~~ ~~~~ ~~ i~ r ~~€~ • = ~ a$~ ~~ ~~ ~~ ~ ~ ~~ ~ ~_~ ~t~ ~~ ~ ~ ~~ g~~ ~ ~ ~~ ~~~ ~~~ f $I ~~ ~~ ~ _~_ . g ~z ~r ~ c 4 I I ~,1~ ' C E~ ~ o o C~J c`~--" -1R ~,1 E~ ~ ~ o o a o -1rc ~f, ~f~~ ~f ~ ~ ~ ~ ~~ ~ a~ ~€a 5~~ ~~ ~ ~~ ~ ~~ ~ ~~g~e ' ~~~ t~~~ I 9 '~ ~r aka g~.a ~~ ~3 ~ ~ f ~,_L ~3~;?~ s , ~ I r, ~ ~ ~ ~t ~ ~ ~~`~~~ ~ ~~ ~~~~ ~~~ ~~~~ ~ ~!~ ~~~~ # ~i I o~. ~ ~~# ., .~_ ~ ~ W.S. Town Center i ~ s • ~ r BWId~4sS aW 4 &d~-Wrc RrD~elpn Sprtp~, F7orid~ ~ Plan and Details a w ~~ ~~ ~~ !~ °~~~ #~~ ~ a~~ ~iS~ltr\~ .~ ~~~ E ~{ ~ g~ ~a ~~ €S ~~ e ~~~~; ~~~~ ~~ i R ~~; ~ ~ 4~i ~ i