HomeMy WebLinkAbout2000 09 11 Regular G Scheduling Workshop
COMMISSION AGENDA
ITEM G
Consent
][nformational
Public Hearing
Regular X
September 11. 2000
Meeting
r2---F
.
Mgr. / .
Authorizatio
REQUEST:
The Community Development Department, Planning Division, requests the City Commission
schedule a workshop to discuss a proposal to refine the S.R. 434 Village Walk Concept plan and
to evaluate the traffic circulation in the area.
PURPOSE:
The purpose of this agenda item is to ask the Commission to schedule a workshop on October
2nd or October 16th to refine the Village Walk concept plan and to evaluate traffic circulation in
the area.
APPLICABLE LAW AND PUBLIC POLICY:
The provisions of 163.3167(11) F.S. which states: Each local government is encouraged to
articulate a vision of the future physical appearance and qualities of its community as a
component of its local comprehensive plan. The vision should be developed through a
collaborative planning process with meaningful public participation and shall be adopted by
the governing body of the jurisdiction.
COD/September 5, 2000/4:38 PM
September 11, 2000
REGULAR AGENDA ITEM G
Page 2
CONSIDERATIONS:
. The City has entered into a contract with Marion I. Skilling & Assoc. in association with
Harlan Hanson Inc. and Traffic Planning & Design Inc. to refine the S.R. 434 Village Walk
concept and to evaluate traffic circulation in the area.
STAFF RECOMMENDATION:
Staff suggests that the Commission schedule a workshop with Michael Wadley of Marion I.
Skilling & Assoc. in association with Harlan Hanson, Harlan Hanson Inc. andTurgut Dervish,
Traffic Planning & Design Inc. to consider preliminary concepts for the S.R. 434 Village Walk
and to evaluate traffic circulation in the area.
ATTACHMENTS:
A. Information Agenda Item B outlining the status of the S.R. 434 Access Management
Program.
B. August 22, 2000 letter from Seminole County explaining a two month delay in the
program schedule.
COMMISSION ACTION:
CDD/September 5, 2000/4:39 PM
ATTACHMENT A
. .
COMMISSION AGENDA
ITEM B
Consent
Informational X
Public Hearing
Regular
July 24. 2000
Meeting
Mgr. /
Authoriza IOn
REQUEST:
The Community Development Department requests the City Commission receive information on
the current status of the City's S.R. 434 Transportation Improvement Program and the Winter
Springs Village Walk project.
PURPOSE:
The purpose of this Board item is to inform the Commission of the current status ofS.R. 434
Corridor Redevelopment Program between U.S. 17/92 and S.R. 419 and the Winter Springs
Village Walk project
APPLICABLE LAW AND PUBLIC POLICY:
The provisions of subsections (h)(2) and (1)(4) of Section 134 of Title 23, United States Code (as
amended by the Intermodal Surface Transportation Efficiency Act of 1991) which requires a
Transportation Improvement Program be prepared and approved by a designated metropolitan
transportation organization (MPO). The TIP has been prepared in accordance with Title 23
eFR Part 450 and Title 23 eFR Part 450 and Title 49 eFT Part 613.
CONSIDERA TIONS:
On September 9, 1998, the Metro Plan Governing Board approved their Transportation
Improvement Five-Year Work Plan. Approval included $4,274,000 to study, redesign, and
CDD/July 1,1, 2()()(J/11 :1,1 AM
_ A ...
JULY 24, 2000
INFORMATIONAL AGENDA ITEM B
Page 2
construct raised landscape medians and resurface S.R. 434 from U.S. 17/92 to S.R. 419.
Intersection improvements are also proposed to include street lights, crosswalks with specialty
pavers and signal lights mounted on mast arm poles. The project is expected to increase safety
and capacity along the corridor.
The City's Comprehensive Plan addresses transportation efficiency along its corridors and has,
as part of its Comprehensive Plan, approved a State Road 434 Corridor Vision Plan th;y
addresses safety, convenience, aesthetics and ease of traffic movement.
The consultants selected include TEl Engineers and Planners, Lake Mary, Florida (lead
consultant) with assistance from Herbert-Halback, Inc.; PEC; and Ardaman & Associates.
The following schedule is provided to inform the Commission of the current status of the
project:
Scope of Services
Advertise for consultant
Select consultant
Hire consultant/start design
1 st Public Meeting
2nd Public Meeting
Public Hearing
Drawings 30/60% complete
Release drawings for bid
Start construction
Project complete
Complete
Complete
Complete
September 1, 2000
October 1, 2000
November 15,2000
January 2001
May 2001
October 2001
January 2002
October 2002
In addition to the above schedule, the consultant will be available to conduct up to four (4)
meetings with organizations and groups interested in the project. These meetings may be made
to informal homeowners groups, formal homeowners associations, or other formal organizations
like citizen advisory committees, etc.
The public meetings and Public Hearing will be scheduled at the Winter Springs Elementary
SchooL The consultant will handle notice requirements. The City will be responsible for setting
up and coordinating the meetings for the consultant.
During August 2000, the City will interview and select a consultant to provide assistance in
structuring a preliminary design for the Winter Springs Village Walk project and the landscaped
raised medians along S.R. 434. The consultant will assist in obtaining a consensus of opinion
that is consistent with community needs/desires that can be presented to TEl Engineers and
Planners, the lead consultant for the County.
COMMISSION ACTION:
ATTACHMENT B
, r
ENGINEERING DIVISION
1'1.01110,\'5 N-\lUIIAL CHOICE
PUBLIC WORKS DEPARTMENT
August 22, 2000
~~~
~8V
,<: ,', ~Jr...
VI< I) ~
C, I..... < -:. _,
I'"\-- /"
Co 0;:-,. . &(!,'
0"/V ',Vltvr <-
"Ily 0 f2F? Sf:>
eVe FYI
lop ^'G
0ef)/ .s
Mr. Charles C. Carrington, AlCP
Community Development Director
City of Winter Springs
1126 East SR 434
Winter Springs, FL 32708
RE: State Road 434 Access Management and Roadway Resurfacing
(u. S. Highway 17/92 to State Road 419)
Dear Mr, Carrington:
The purpose of this letter is to inform you of the changes in the schedule for the referenced
project.
Ms. Karen Pinell of FDOT advised me last week that the Federal Highway Administration has
just implemented a new policy on the way the funding is set up in the LAP Agreements. The
policy requires that the funding be broken down by design and construction and separate FIN
numbers be set up for each of the two phases in the LAP. Please note that the total funding for
this project still remains the same as previously budgeted.
Ms, Pinell also indicated that the FDOT Planning staff would need to submit a TIP Amendment
for this change to MetroPlan Orlando for approval. FDOT staff expects that, at the earliest, the
change could be approved at the Board meeting on October 11, 2000. After FDOT's execution
of the LAP Agreement, it will take about two weeks for the County to execute a contract with the
consultant and encumber the contract. Based on this schedule, I expect the Notice-to-Proceed
date to be November I, 2000.
520 West lake Mary Boulevard Suite 200 Sanford Fl 32773-7424 Telephone (407) 323-2500 Extension .'>674 Fax (407) 330-9515
Mr. Charles C. Carrington, AlCP
State Road 434 Access Management and Roadway Resurfacing
(u. S. Highway 17/92 to State Road 419)
August 22, 2000
Page 2
This new NTP date will push the first public meeting into December if we follow the original
time line. Our consultant suggests that this meeting be held after the holidays in order to have a
higher attendance at the public meeting. Please let me know your view on this issue.
If you have any questions, please call me at 665-5702.
Sincerely,
SEMlNOLE COUNTY
/7 --~7 /'.~
ut7 W l/[,. /~
Co-Co Wu, P.E.
Principal Engineer
CCW/dr
Attachments
c: Jerry McCollum, P.E., County Engineer
Betsy Cohen, Purchasing
Fred Ferrell, FDOT
Karen Pinell, FDOT
File