Loading...
HomeMy WebLinkAbout2007 10 22 Consent 202 Blumberg Blvd/Town Center Trail project COMMISSION AGENDA ITEM 202 CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR October 22, 2007 Meeting MGR~ /Y' Authorization REQUEST: Public Works Department requesting approval for an increase in the authorization of an additional $14,890 for the Blumberg Boulevard/Town Center Trail project. PURPOSE: The purpose of this agenda item is to request approval to increase the authorization for t,ite Blumberg Boulevard construction an additional $14,890 for completion of the original construction contract to cover cost overruns primarily associated with the electrical service location and paver quantities. CONSIDERATIONS: On January 8, 2007, the Commission approved funding and authorized construction of the Town Center Trail by Southeastern Enviroscape, Inc. Value of the approved contract with Southeast Enviroscape was $1,400,928.45 with a 5% contingency, for a total approval of $1,470,975. Funding was approved from the following line codes as: Town Center Trail & Infrastructure Transfer from Town Center Improvements Transfer from Doran Phase IIA Transfer from Town Center Streetscape (305-65000-30045) (305-65000) (115-65000-30101) (115-65000-30011) $800,000 $278,000 $310,000 $140.000 TOTAL $1,528,000 This funding was inclusive of City purchased Pavers, Sylvester palm trees, Design costs and the contract with Southeast Enviroscape. Construction cost for the contract with Southeast Enviroscape has exceeded the original authorization by $14,890, bringing the total contract cost with Southeast Enviroscape to $1,485,865. There were two primary change orders required that caused the contract to exceed authorized funding. A change in the location of electrical panels at cost of $29,940 and an overage in the estimated quantity of pavers required to be installed at a cost $23,965. 102207 _ COMM _Consent _202_ Town _ Center_Trail Consent Agenda Item 202 October 22, 2007 Page 2 Costs to date are: SRI Design Cost CPR Design Cost Paver Cost Palm Tree Cost Construction Cost $ 33,000 $ 42,875 $ 53,275 $ 36,830 $1.485.865 Total $1,651,845 There are additional features Staff believes will enhance the project are: adding additional benches to the pavilions, bicycle racks, low voltage up lighting for the trees, drinking water fountains, large decorative pots with flowers, sculptures and upgraded decorative street signs along Blumberg Boulevard. The cost for these additional items is estimated at $80,000 which will be brought back to the Commission in the future for consideration. FUNDING Line Code (305-65000-30045) has adequate fund balance for the required changes of $14,890 in cost over runs on the construction contract with Southeast Enviroscape. STAFF RECOMMENDATION: Staff recommends the City Commission approve the expenditure of additional funds in the amount of$14,890 for cost overruns related to the construction contract with Southeast Enviroscape. ATTACHMENTS: None COMMISSION ACTION: 102207 _ COMM _Consent _202_ Town _ Center_Trail