Loading...
HomeMy WebLinkAbout2007 10 08 Regular 604 Trotwood Park Project COMMISSION AGENDA October 8, 2007 Regular Meeting Consent Informational Public Hearing Regular X r- ITEM 604 Mgr. / Dept. Authorization REQUEST: The Parks and Recreation Department is requesting the City Commission consider phasing the Trotwood Park Project or provide other direction. PURPOSE: This agenda item is needed for the City Commission to determine if it desires to phase the Trotwood Park Project or provide other direction because of escalating project costs and the shortfall in Park Impact Fees. CONSIDERATIONS: · On July 24, 2006 the City Commission approved the execution of a FRDAP Grant for Trotwood Park for $ 200,000. The project budget estimated to be $ 500,000 was done in 2005. · CPH has done several current cost estimates of the proposed project and staff has reviewed ways to reduce current costs and phase the project. · There is currently $ 446,160 available for the project however; $ 232,700 is pledged from Park Impact Fees which is not yet received. In fact no impact fees have been received since May, 2007. · The project needs to go out to bid this fall and be awarded in early 2008 in order to have the Splash Playground open by the summer of 2008. Also these improvements in phase I will insure that the city will receive the $ 200,000 matching FRDAP Grant prior to the 2009 grant deadline. Phase I Splash Playground Pump House Restroom/Storage Renovation Pavilion Total $ 198,655 $ 35,035 $ 74,965 $ 55.600 $ 364,255 Agenda Item Regular 604 Page -2- Phase II Parking Lot, Drainage, Demo Total $ 322,491 Phase III 4 New Tennis Courts 2 Playground Resurfacing 2 Playground Shade Structure Total $ 205,903 $ 85,450 $ 52,544 $ 343,897 Estimated Project Total $ 1.030.643 . Staff and CPH are ready to prepare Phase I to go out for bid and will bring back to the City Commission the bids, recommendation and firm construction costs. . Phase II is still being permitted with St. John's Water Management. . Phase II and Phase III may be budgeted in future FY's. FUNDING: No additional funding authority is needed at this time. RECOMMENDATIONS: The Parks and Recreation Department recommends that the City Commission decide if it desires to phase the Trotwood Park Project or provide other direction. ATTACHMENTS: Attachment # 1 CPH and staff current cost estimates. COMMISSION ACTION: PHASE 1 Trotwood Park Improvements Date: 10/2/2007 Winter Springs, FL By: ACL CPH Project number W04132 Checked by: ACL Opinion of Probable Cost Phase I - Splash pad and appurtenances Construction Quantity Unit Unit Cost Current Total Sitework Mobilization (10% of sub-total) LS $15,299.55 Clearing and Grubbing 1 LS $5,000.00 $5,000.00 Silt Fence, Staked (Type Ill) 405 LF $2.00 $3,616.00 Sod Distrubed Areas 45 SY $2.00 $90.00 Sub-total $8,706.00 Flatwork Remove sidewalk 40 LF $10.00 $400.00 4" Thick Concrete Sidewalk 40 LF $20.00 $800.00 Sub-total $1,200.00 Splash pad Concrete pad (6" thick) 315 SY $40.00 $12,600.00 Piping, pumps, appurtenances * 1 LS $60,032.00 $60,032.00 Fog Feature · 1 LS $31,120.00 $31,120.00 Hose bib 1 EA $750.00 $750.00 6 inch Gravity Sewer Line 100 LF $20.00 $2,000.00 Connection to existing on-site lift station 1 EA $2,000.00 $2,000.00 Gravity Sewer Clean Outs 2 EA $250.00 $500.00 1" Water Line 105 LF $12.50 $1,312.50 Supply lines from Equipment room to Splash Pad Spray Features 1200 LF $12.50 $15,000.00 Connection to existing water main 1 EA $1,000.00 $1,000.00 Footwash and Shower · 1 EA $1,500.00 $1,500.00 Shower Return Drain 1 EA $250.00 $250.00 Trench Drain and Grate (at splash pad) 50 LF $25.00 $1,250.00 8" Drain Line (from spalsh pad) 80 LF $30.00 $2,400.00 Waste Receptical 1 EA $250.00 $250.00 4' Decrative Aluminum Fence 125 LF $25.00 $3,125.00 Metal Benches 8 EA $1,000.00 $8,000.00 Sub-total $143,089.50 Project sub-total $152,995.50 Mobilization $15,299.55 PROJECT BASE TOTAL $168,295.05 Additive Alternates 6' Sidewalk Around Perimlter of Splash Pad 210 LF 30.00 $6,300.00 Additional Benches Around Splash Pad 6 EA 1,000.00 $6,000.00 $12,300.00 Total Base Project and Alternates $180,595.05 10% for incidentals (colltingencies) $18,059.51 PROJECT TOTAL $198,654.56 Notes: Estimate does not include cost for buildings (restroom, pavilion, pump room) . Splash pad and fog system based on quotes from suppliers OPC-Trotwood Park 9-21-07.xls OPINION OF PROBABLE COST- PUMP HOUSE FACILITY (264 SF) Trotwood Park Improvements Winter Springs, Florida CPH Project Number W04132 EXCAVATION: Foundation Sub-Total CONCRETE: Floor Slabs Sub-Total MASONRY: Concrete Masonry Units Brick Sub-Total CARPENTRY: Wood Trusses Sheathing Underlayment Sub-Total DOORS: Walk Door Sub-Total MOISTURE PROTECTION: Metal Standing Seam Roof Soffit and Fascia Sealants Sub-Total MEP: Lighting Ventilation Eyewash Station Sub-Total Total Approximate Cost 10% For Incidental (Contingencies) Project Total $10,500.00 $ 8,400.00 $2,000.00 $ 600.00 $ 600.00 $4,500.00 $ 700.00 $ 400.00 $ 300.00 $ 500.00 $ 750.00 $ 750.00 $ 1,100.00 $18,900.00 $ 3,200.00 $ 750.00 $ 5,600.00 $ 1,550.00 $31,850.00 $ 3,185.00 $35.035.00 Sept. 27th, 2007 1 OPINION OF PROBABLE COST- STORAGE I RESTROOM FACILITY (REMODEL) Trotwood Park Improvements Winter Springs, Florida CPH Project Number W04132 DEMOLITION: Walls, Partitions Etc. Sub-Total CONCRETE: Floor Slabs Sub-Total MASONRY: Concrete Masonry Units Brick Glass Block Sub-Total CARPENTRY: Stucco I Wood Framing Sub-Total DOORS: Walk Doors Coil Door Sub-Total FINISHES: Paint Tile Sub-Total SPECIAL TIES: S.S. Counters ADA Signage Diaper Changing Station Toilet Partitions Sub-Total $6,300.00 $4,750.00 $4,000.00 $1,800.00 $2,000.00 $3,100.00 $6,500.00 $ 800.00 $ 200.00 $ 600.00 $3,600.00 $3,500.00 $3,500.00 $15,050.00 $6,000.00 $3,800.00 $7,600.00 $5,200.00 Sept. 2ih, 2007 1 Trotwood Park MECHANICAL, ELECTRICAL AND PLUMBING Mechanical Electrical Plumbing Sub-Total Total Approximate Cost 10% Incidental (Contingencies) Project Total $ 5,500.00 $ 4,000.00 $14,000.00 $23,500.00 $68,150.00 $ 6,815.00 $74.965.00 2 OPINION OF PROBABLE COST- PAVILION (580 SF) Trotwood Park Improvements Winter Springs, Florida CPH Project Number W04132 SITEWORK: Clear and Grub Excavation Sub-Total CONCRETE: Floor Slab Column's with Masonry Trim Sub-Total METALS: Tube Steel Trusses Anchor Plates Sub-Total CARPENTRY: Eng. Lam. Wood Beams Cedar Framing Hangers Sheathing Sub-Total MOISTURE PROTECTION: Underlayment Metal Standing Seam Sub-Total ELECTRICAL: Light and Power Outlet Total Approximate Cost 10% for Incidental (Contingencies) Project Total Cost $ 500.00 $2,000.00 $2500.00 $2,000.00 $9,000.00 $11,000.00 $6,000.00 $ 600.00 $6,600.00 $9,000.00 $5,000.00 $ 750.00 $1,200.00 $15,950.00 $1,200.00 $10,800.00 $12,000.00 $2,500.00 $50,550.00 $ 5,050.00 $55.600.00 Sept. 27th, 2007 PHASE II Trotwood Park Improvements Winter Springs, FL CPH Project number W04132 Date: 10/2/2007 By: ACL Checked by: ACL Opinion of Probable Cost Phase II - Parking Lot Construction Quantity Unit Unit Cost Current Total Sitework Mobilization (10% of sub-total) LS 1 LS $8,000.00 2,228 SY $10.00 22 SY $10.00 170 LF $10.00 5 EA $2,500.00 1 EA $3,000.00 540 LF $25.00 390 LF $30.00 1 EA $1,000.00 1 EA $1,000.00 3 EA $500.00 Clearing and Grubbing Turbidity Barrier, Floating Silt Fence, Staked (Type III) Maintenance of Traffic Sod Distrubed Areas Sub-total 1 261 1,808 1 1238 LS LF LF LS SY Demolition Remove handball courts Remove existing stabilized parking / drive Remove concrete driveway appron Remove sidewalk Storm Drainage FOOT Type C Inlets Pond Out fall Structure 15" RCP Pipe 18" RCP Pipe 18" Miltered End Section 15" FDOT U-lype Endwall Concrrete Rubble at MES in pond Sub-total Pavement Sub-base for new pavement (12") Limerock base (6") Asphalt pavement Concrete Valley Gutter Striping and signage Wheel Stops 4" Thick Concrete Sidewalk Handicap Ramps Concrete Flatwork Saw cut exist pavement Sub-total 2830 2795 235 80 1 51 175 2 7 178 SY SY TN LF LS EA SY EA SF LF Existing on-site Force Main Sleeve and Adjust Existing FM 260 LF Project sub-total Mobilization PROJECT BASE TOTAL 10% for incidentals (contingencies) PROJECT TOTAL $26,652.16 $5,000.00 $25.00 $2.00 $5,000.00 $2.00 $5,000.00 $6.525.0C> $3,616.00 $5,000.00 $2,476.00 $22,617.00 $8,000.00 $22,280.00 $220.00 $1,700.00 $32,200.00 $12,500.00 $3,000.00 $13,500.00 $11,700.00 $1,000.00 $1,000.00 $1,500.00 $44,200.00 $5.00 $15.00 $220.00 $25.00 $6,000.00 $250.00 $54.00 $500.00 $54.00 $100.00 $14,150.00 $41,925.00 $51,651.60 $2,000.00 $6,000.00 $12,750.00 $9,450.00 $1,000.00 $378.00 $17,800.00 $157.104.60 $40.00 $10,400.00 $266,521.60 $26,652.16 $293,173.76 $29.317.38 $322,491.14 Notes: Estimate does not include cost for buildings (restroom. pavilion, pump room) * Splash pad and fog system based on quotes from suppliers Cost also includes all storm piping from pond to Lake Tuskawilla. This cost may not be part of the site development based on comments from Water Management District. OPC- Trotwood Park 9-21-07.xls PHASE III Trotwood Park Improvements Winter Springs, FL CPH Project number W04132 Opinion of Probable Cost Phase III - Tennis Court Construction Sitework Mobilization (10% of sub-total) Clearing and Grubbing Silt Fence, Staked (Type III) Sod Distrubed Areas Remove tennis courts Swale grading 4" Thick Concrete Sidewalk Tennis Court Construction Tennis Court, 1" Asphaltic Concrete Tennis Court, 6" Iimerock base Tennis Court, 12" sub-base 12 foot high chain link fence 4 foot swing gates Tennis court striping and appurtenances Project sub-total Mobilization PROJECT BASE TOTAL 10% for incidentals (contingencies) PROJECT TOTAL OPC-Trotwood Park 9-21-07.xls Date: 10/2/2007 By: ACL Checked by: ACL Quantity Unit Unit Cost Current Total 1 LS $17,016.80 1 LS $5,000.00 $5,000.00 1,808 LF $2.00 $3,616.00 50 SY $2.00 $100.00 1467 SY $10.00 $14,670.00 1 LS $2,500.00 $2,500.00 83 SY $54.00 $4,482.00 180 TN $220.00 $39,600.00 3,200 SY $15.00 $48,000.00 3,280 SY $5.00 $16,400.00 720 LF $40.00 $28,800.00 2 EA $1,000.00 $2,000.00 1 LS $5,000.00 $5,000.00 $139,800.00 $170,168.00 $17,016.80 $187,184.80 $18,718.48 $205,903.28 Chuck Pula From: Jeff Caldwell [mailto:jeff@repservices.com] Sent: Wednesday, September 26, 2007 2:47 PM To: Alan Greene Subject: RE: price for the forever lawn Yes, here it is. $77,682.00 plus 10% contingency is $7,768= Total $85,450 This is completely supplied and installed. The site prep work is up to you to remove the old mulch and get the grade just right with fill and flattening. If for some reason you cannot do any site work this would probably cost between 4,000 and 5,000 in labor. In addition, the surfacing is under the Jax contract so it can be purchased very easily. If you get a chance to go and see Masters Academy new playground, take Chuck and I'll meet you there. We just put down 9,000sqft of playground grass on their new play environment featuring an Evos. See ya, Jeff From: Alan Greene [mailto:agreene@winterspringsfl.org] Sent: Wednesday, September 26, 2007 9:39 AM To: Jeff Caldwell Cc: Chuck Pula Subject: price for the forever lawn Hello, Also, we are looking into maybe doing the Trotwood artificial turf in the forever lawn stuff instead of poured in place. I don't know if you still have the measurements from before but here they are: 2-5 age area 72,912 sq ft 5-12 age area 74,150 sa ft Total 77,062 And do you need concrete for this? I don't think you do but we need it stabilized. Thank you and I look forward to the price for this material. Thanks, Alan Greene City of Winter Springs Parks & Recreation Operations Superintendent Parks and Grounds Off: 407-327-6592 Fax: 407-327-4763 REP SERVICES Exoerts at Plav & Outdoor Soaces Please mail checks to: Rep Services, Inc. 902 Waterway Place Longwood, FL 32750-3573 PROPOSAL. Qty Part No. Description Unit Wt Unit Price Ext. Weight Ext. Price Class Discount Shade Systems, Inc. 1 CP-TROTWOOD 50' x 50' Mega Span Shade System, 10' high, powder-coated metal Shade Structures $19,696.00 1 CP-TROTWOOD 20 20' x 30' Rectangular Shade System, 10' high, powder-coated metal $7,196.00 Global Discount Applied: 3.00% ($806.76) Subtotal Shade Systems, Inc. $26,892.00 Equipment Subtotal Total $26,085.24 Other Charges: Sealed Eng. Dwgs: $1,694.00 : Equipment Installation: $17,403.43, Permitting: $1,210.00:= Total $18.613.43 Freight Charge: $1,380.00 We are pleased to provide you with this proposal. If you have any questions, please contact us at: Equipment Subtotal: Grand Total: $47,772.67 10% Contingency $4,772 Total $52.544.67 With all global discounts and costs included ALL PO's AND CONTRACTS SHOULD BE SUBMITTED AS NOTED IN THE HEADERI REP SERVICES, INC. . 902 Waterway Place' Longwood, FL 32750-3573 . 407.831.9658 (P) . 407.834.5366 (F) 800.992.5357 . Offices Statewide' www.repservices.com ~ Proposal No: 26808 Page 2 of 2 Proposal To: City of Winter Springs Proposal Dated: 2/16/2007 Project 10: 453 Option: B Revision: 1 IN ADDITION, ORDERS PLACED BASED ON THIS PROPOSAL ARE SUBJECT TO MANUFACTURER'S STANDARD LEAD TIME. REQUESTS FOR EXTENDED SHIPPING TIMES MAY RESULT IN ADDITIONAL COSTS, SUCH AS FREIGHT INCREASES, RAW MATERIAL COST INCREASES, ETC. Shipping Notes: FREIGHT COMPANY MUST CALL 24 HOURS PRIOR TO DELIVERY: Alan Greene 407-327-6592 To order, please sign below and return to Rep Services Inc. at the address or fax number noted below. Thank You. Name Date We are pleased to provide you with this proposal. If you have any questions, please contact us at: REP SERVICES, INC.' 902 Waterway Place' Longwood, FL 32750-3573' 407.831.9658 (P). 407.834.5366 (F) 800.992.5357 . Offices Statewide' www.repservices.com