Loading...
HomeMy WebLinkAbout2000 07 10 Regular E JDC Calhoun Inc. Agreement COMMISSION AGENDA ITEM E Consent Informational Public Hearin2s Re2ular X July 10. 2000 Meeting /2-- Mgr. / Authorization Dept. REQUEST: City Manager requests the Commission approve an agreement between JDC Calhoun, Inc, a Georgia Corp. (The James Doran Company) and the City of Winter Springs relative to the Town Center Code. PURPOSE: The purpose of this Agenda item is to adopt an agreement between JDC Calhoun Inc. and the City regarding the Town Center. CONSIDERATION: . On June 19,2000 the city commission held a workshop with representatives ofJDC Calhoun Inc. · At the Commission meeting of June 26, 2000, the Commission instructed the City Manager and City Attorney to ftnalize the wording in the agreement and bring the matter back for consideration. . All of the issues were resolved in work sessions. The agreement is being finalized and should be available Friday evening by 5:00 p.m. FUNDING: Funding for the agreement is provided from the 1999 Revenue Bond issue, the One Cent Local Option Sales Tax, Integrated Utilities Fund Bond Issue, and Transportation Improvement Fund. RECOMMENDATION: It is recommended that this City Commission adopt the agreement. ATTACHMENTS: None COMMISSION AGENDA CONSENT INFORMATIONAL ITEM F PUBLIC HEARING 7/10/2000 Meeting MGR. Authorization x cQ REGULAR REQUEST: The Parks and Recreation Department is requesting the City Commission to consider needed improvements and Change Order No, 3 to the Parks Improvement Program to amend the 1999 Revenue Bond Issue to provide for additional funding, PURPOSE: The purpose of this item is to receive Commission approval for needed improvements and Change Order No.3 to the Parks Improvement Program and provide necessary funding. ISSUE ANALYSIS: . On June 12,2000, the City Commission approved Change Order Number 2 to the contractor with a net budgetary impact of $7,090,97. . At the June 12, 2000 meeting, the Commission also requested staff to look into and obtain a cost to connect the new restroom/concession building to city sewer, and also bring back the Bahia sod request, . Staff has reviewed cost estimates by Conklin, Porter and Holmes and recommends installation by City Forces and a material cost for the alternate 3" pipe instead of2" pipe at an estimated cost of $22,880,00. . Staff has further reviewed the Bahia Sod request in seven (7) parks and is only recommending sod to prevent erosion and for safety purposes in the amount of $15,060.00, . Consideration of construction and funding based on discussion at the Parks and Recreation Workshop of March 20, 2000 and the City Commission meeting of June 12, 2000 to build a quality dual pitchinglhitting practice cage at Trotwood Park in the amount of $52,348,00 and an additional 200 foot baseball practice field at Sunshine Park in the amount of $51,425,00, 1 . Consideration of construction and funding for a connector walkway between Torcaso and Sunshine Parks in the amount of $20,233,00, a connector bridge (pipe) in the amount of $10,000.00 and consideration of lighting for safety and security along the walkway on the amount of $24,258.00. . Consideration of additional 6.5% construction administration to Starmer Ranaldi based on Change Order No.3 ($148,264.) for a total of $9,737.00. FUNDING: Additional funding requests are as follows: PRIORITY "1" Materials for City forces installed connection to the sanitary sewer system Additional sod to complete Parks Improvement Program Connector Bridge (culvert pipe) between Trocaso and Sunshine Parks TOTAL $22,880. $15,060. $10.000. $57,940. PRIORITY "2" Change Order No.3: Quality dual pitching/hitting cage at Trotwood Park Additional 200 Foot Baseball practice field at Sunshine Park Connector walkway between Torcaso and Sunshine Parks With decorative/safety lighting TOTAL-Change Order No.3 Additional contract administration to Starmer Ranaldi TOT AL APPROPRIATION $ 52,348. $ 51,425, $ 44.491. $148,264. $ 9,737. $215,941. If approved this increases the total appropriation for the Parks Improvement Program to: Current authorization with Change Orders 1 & 2 New authorization TOTAL $2,655,537.16 215,941.00 $2,871,478.16 Funding will come from the 1998 Revenue Bond Issue, RECOMMENDATION: Staff is recommending approval of the materials cost estimate by Conklin, Porter and Holmes to connect the new restroom/concession facility to the sanitary sewer system site at a cost of $22,800.00. Staff is also recommending approval of additional Bahia sod at a cost of $15,060.00, a connector pipe between Torcaso and Sunshine Park at $10,000,00 and Change Order No,3 for a dual pitching/hitting practice cage at Trotwood Park at a cost of $53,348,00, additional 200 foot baseball practice field at Sunshine Part at a cost of $51,425,00 and a connector walkway between Torcaso and Sunshine Parks at a cost of $44,491.00 and an 2 additional construction administration to Starmer Ranaldi in the amount of $9,737.00 for a total of $215,941.00 from the 1999 Revenue Bond Issue. IMPLEMENT ATION SCHEDULE: Schedule approved changes July 11, 2000 ATT ACHMENTS: Attachment #1- Conklin, Porter and Holmes Letter Attachment #2- Memorandum from Parks Superintendent regarding sod Attachment #3- Starmer Ranaldi Planning and Architecture, Inc. Contract Change Order No.3 COMMISSION ACTION: AgendallO 3 June 22, 2000 Mr. Chuck Pula Parks and Recreation Director City of Winter Springs 1126 E.SR 434 Winter Springs, FL 32708 RE: Revised Preliminary Engineer's Cost Estimate Connection of Central Winds Park Facilities to the Sanitary Sewer System CPR Project No. W0491.07 Dear Mr. Pula: ATTACHMENT III @[F2[JQ CPH Engineers, Inc. 1117 E. Robinson St., Suite C Orlando, FL 32801 Phone: (407) 425-0452 Fax: (407) 648-1036 www.cphengineers.com As per your request, CPR Engineers, Inc. is pleased to provide you with a revised engineer's cost estimate for the connection of the park facilities at the Central Winds Park to the City's Collection system. It is our understanding the City would like a breakdown on the materials costs for the project because you may decide to handle the installation with City forces. The original estimate was based upon installation by a contractor utilizing a 2" force main for connection to the facilities. For this additional estimate, we are including materials costs for both 2" and 3" SDR 21 PYC pressure pipe. It was noted by several suppliers that the availability of "green" SDR 21 is limited but that "white" is readily available. I spoke to Mr. Lockcuff regarding the use of white pipe rather than green and he indicated that this should be acceptable, provided that the white pipe is appropriately marked. Based upon the information received from the School Board, the connection to the facilities at this location does not appear to be a viable alternative. Therefore, we are limiting this estimate to the connection of the facilities to the force main located on SR 434 at the park entrance. As in the previous correspondence, these estimates of cost do not include Utility Department impact fees, or electrical service to the station. The cost estimate for the materials associated with the connection of the new concession stand is listed below: 1. Connect the new concession stand to the force main on SR 434. ::!: 2400 LF 2" white SDR 21force main ALT ::!: 2400 LF 3" white SDR 21 ::!: 2400 LF Locating tape and wire Connection to Existing force main Duplex Grinder Pump Station ::!: 2400 LF Restoration FDEP Permitting Fee Plan Preparation $0.75/LF $1.25/LF $ 1,800.00 N/A $ 750,00 $ 950.00 $ 7,500.00 $ 3,600.00 $ 500.00 $ 4,500.00 $19,600.00 $ 1,96000 $21,560.00 SUBTOTAL 10% Contingency TOTAL Alternate N/A $ 3,000.00 $ 750.00 $ 950.00 $ 7,500.00 $ 3,600.00 $ 500.00 $ 4,500.00 $20,800.00 $ 2,080.00 $22,880.00 I have also included the material costs associated with the additional connections to the existing concession stand and the maintenance building, should you also decide to connect these facilities to the central collection system as well. SANFORD . ORLANDO . DELAND . PALM CITY . CAPE CORAL . JACKSONVILLE >- The material costs associated with connection of the existing maintenance facility to the new grinder pump station would involve installation of a gravity service lateral to the new grinder station. This would involve approximately 350 LF of 4" gravity line, The costs associated with this connection being done with city forces is listed below: .:!: 350 LF 4" PYC gravity service lateral @ $ 1.10/LF miscellaneous fittings and connections .:!: 350 LF restoration @ $ 2.50/LF SUBTOTAL 10% Contingency TOTAL $ 385.00 $ 250.00 $ 875.00 $1,510.00 $ 150.00 $1,660.00 >- The material costs associated with connection of the existing concession stand to the new grinder station would involve installation of approximately 975 LF of force main using the pumps presently in the septic system for transfer to the new grinder station. A second alternative would involve installation of new pumps and controls into the existing system and installation of approximately 360 LF of force main and connect directly to the new grinder pump force main. The costs for materials associated with both options is listed below: Utilizing existing pumps .:!: 975 LF 3" white SDR 21 force main @ $ 1.25/LF :!: 975 LF Locating tape and wire .:!: 975 LF restoration SUBTOTAL 10% Contingency TOTAL Utilizing new pumps Two new grinder pumps & controls .:!: 360 LF white SDR 21 force main :!: 360 LF Locating tape an wire i: 360 LF restoration SUBTOTAL 10% Contingency TOTAL @ $ 1.25/LF @ $ 0.30/LF $ 1,218.75 $ 292.50 $ 1.462.50 $ 2,973.75 $ 297.00 $ 3,270.75 $ 4,500.00 $ 450.00 $ 108.00 $ 540.00 $ 5,598.00 $ 560.00 $ 6,158.00 It was assumed that all three projects would be designed and permitted at the same time to avoid additional permitting fees and plan preparation costs. Should you have any questions, or if you require any additional information, please feel free to contact me. Sincerely, ATTACHMENT fI2 MEMORANDUM TO: CHUCK PULA, PARKS AND RECREATION DIRECTOR FROM: DONALD JAMES, SUPERINTENDENT OF PARKS & GROUNDS SUBJECT: MINIMAL SOD REQUIREMENTS/P ARKS IMPROVEMENT PROGRAM COMPLETION DATE: 6/21/00 I have further reviewed the quantities of sod that are needed to complete the Parks Improvement Program, These needs are also around walkways, pavilions, parking lots and other areas to prevent erosion and for safety purposes. I have deleted the common areas of these parks and will use seed, wood chips and mulch in other disturbed areas as feasible, Per park breakdown of sod needed: Trotwood 108 walkways, parking lot, drainage areas and fishing pier Sam Smith 18 walkways, parking lot and pavilions Moss 45 walkways, parking lot, pavilions, basketball court Torcaso 36 walkways, parking lot, pavilion, restrooms Sunshine 18 walkways, pavilions, basketball courts Central Winds 16 around restroom/concession building Winding Hollow 10 walkway and parking lot TOTAL SOD NEEDED: 251 PALLETS AT $60,00=$15,060.00 /Img ATTACHMENT 03 . sri 5 Jul 00 Chuck Pula, Director Park and Recreation Department City of Winter Springs 1000 East SR 434 Winter Springs, Florida 32708' Re: Parks Improvement Project Change Orde~ NO.3 . Chuck Based on our recent meetings and discussions as well as confirmation of construction pricing With the contractor, it is our opinion that the construction costs for the items in this change order are fair and. reasonable. . . The change order includes three improvements not originally included in the original project scope as a result of the City's request to enhance the existing parks. The cost for these three improvements totals $ 148,264 and inclu'des tpe contractors overhead and prqfit adjustment since these jteins were not approved as part of change order no. 2, and are listed below: . . . . ~. new (2).station pitching., hitting practice cage at Trotwood Park $ 52,348 2. new 200' ball field at Sunshine Park $ 51,425 3. new connecting walk between Sunshine and T orcaso Parks $ 44;491 As can be seen on the attached change order signature page the project construction cost is summarized as foI1ows: 1. Original City approved construction cost 2. City approved change order no, 1 3. City approved change order no. 2 4. Proposed change order no:3 Total construction cost $ 2,260,689.00 $ 36,443.21 $ 7,090.97 $ 148.264.00 $ 2,452,487.18 Stanner Ranaldi Planning and, Architecture Inc. AA-002984 890 Northern Way' Suite E-I Winter Springs. ,Florida 32708 Phone 407 977 1080 Fax 407 977 1019 In addition to the contract construction cost above the City has additional costs to the project for work performed by the City and not in the construction contract namely: Proposed amendment nO.2 1. additional sod 2. pipe ditch crossing 3. new sewer system at Central Winds Total amendment cost $ 15,060 $ 10,000 $ 22.880 $ 47,940 One final cost impact to the City is our professional consulting fees. To this date we have not charged the City for additional services for any of these change order items including our design and / or redesign expenses, we will however submit an amendment to our contract for design and construction administration services for the change order no. 3 in the amount of6.5 % of the construction value or $ 9637. Attached please find the signature page for change order no. 3 as well as back up pricing data from the contractor. We trust this information will be well received and we look forward to continuing our excellent working relationshi with you in making this exciting project a great success. Regards 1;- President Att: Change Order NO.3 for your approval and execution Back up pricing data from contractor CONTRACT CHANGE ORDER NO. 03 10-Jul-00 Project Title: CITY OF WINTER SPRINGS Parks Improvement Project Contractor: M. H. Williams Construction Co. Reason for chan! Approved Facilities Commission Approval 12 Jun 00 ~]n~ 'FOlloWing,Modifi~tions."':to:the;~R~oj~ct:are;H~feb90toered', ,:; : :;:':. ,.,:,,:",' ,;,"'~;"'\"I;;"'<'. ':;i"~;'{ '.'''~,1;: :-;'i' Item No, and Description 1 (2) station pitching I hitting practice cage at Trotwood Park add $ 52,348,00 2 new 200' ball field at Sunshine Park add $ 51,425,00 3 new connector between Sunshine and Torcaso Parks add $ 44,491.00 Change Order Value: $ 148,264,00 Original Contract Price: $ 2,260,689,00 Approved change order no. 1 36,443.21 approved change order no, 2 7090,97 Total Value Previous Change Orders: $ 43,534,18 New Contract Price: $ 2,452,487.18 Original Contract Duration 300 days Original Contract Completion Date 10-Sep-00 Approved Time Extensions 30 days Current Contract Duration 330 days Proposed Time Extension 30 days New Contract Duration 360 days New Contract Completion Date 9-Nov-OO Accepted by Contractor: Date Capital Projects Coordinator: Date Parks & Recreation Director: Date City Manager: Date FROM PHiliP BATURA PHONE NO. 407 876 2062 Jun. 22 2000 01:03PM P1 ~lliams CONSTRUCTION, INC. 5460 Hoffner Ave Suite 408 Orlando, FL 32812 407/275 - SOlS Fax 4071207 - 4339 June 22, 2000 00. ~~ 1tPJJ'L. C!J JJ-1r · Mr. Bill Stanner Starmer Rainaldi 890 Northern Way Suite E-I Winter Springs, FL 32708 Re: Winter Springs Parks Dear Bill: In response to your letter to Chuck Pula regarding pending change order issues following is the information you requested: 1. We have already given you a proposal to delete the septic system currently in our contract scope so the City can pursue whichever method of sewer service they prefer. 2 In regard to the potential additions to the parks scope, I reviewed the proposals again for the amount of general conditions we included and the amount of general conditions Kyle Greenwood included in our bid. Kyle had estimated that we would complete the project in nine months, therefore July. and we were on pace to meet this time' frame until the muck situation developed. If all three proposals were approved already and the work started, I would have a month of supervision overhead that would cover the increased work load. We will be absorbing our general conditions for the contract scope, but if part or all of these changes are approved later on, they must now stand on their own merit. To put a hard dollar figure on the changes is also complicated if only 1 or 2 of the 3 proposals are approved. In addition, if ,approval is not forthcoming. I must start the close out process with the subcontractors and prepare final W contract releases. The opportunity to include the work by change order into contract scopes and benefit from reduced overhead is also lost, which must be reflected in my overhead and profit calculations. /' 7 elude my trials and tribulations, IF the added work is approved by mid-July I would project $2000 r proposal for extended supervision and overhead. If approval is delayed beyond July such that s work becomes a project unto itself, I would budget $3-4.000 per proposal for approval purposes. We can then sort out which projects are approved and finalize an overall scope and schedule. Please contact me with any questions. File