COMMISSION AGENDA
ADD-ON
ITEM D-l
CONSENT
INFORMATIONAL
PUBLIC HEARING
REGULAR X
MGRJ2w\ /DEPT C.,(Y
Authorizatioii
6/12/2000
Meeting
REQUEST: The City Manager requests the Change Order No.2 of the Parks Improvement Program be
amended to include an additional $8,500.00 for de-muck areas for restrooms and tot
playground at Torcaso Park.
PURPOSE: The purpose ofthis request is to receive Commission authority to add an additional $8,500.00
to the list of request items in Change Order No.2 for the Parks Improvement Program to de-
much areas of Torcaso Park.
CONSIDERATIONS:
. Soil borings completed on Friday June 9, 2000, indicated muck at Torcaso Park in the area where the
restrooms and tot playground are to be built. De-mucking in the amount of $8,500.00 is needed to
make it possible to construct these facilities.
. Regular Agenda Item D on this Agenda has a list of items which are required and a list of elective
improvements to the park. The required items appear as Change Order No.2. This item needs to be
added to the required list in Change Order No.2:
REQUIRED:
Agenda Item D
Agenda Item D-l
Substitute Soccer goals
$ (5,815.00)
$ (5,815.00)
1
Adjust Fishing Piers $ (1,643.00) $ (1,6453.00)
Omit kiosk at CWP $(10,000.00) $ (10,000.00)
Add paving overlay
Sam Smith Park $ 1,375.50 $ 1,375.50
Striping of parking
Lots at Trotwoodl
Sam Smith Parks $ 1,617.00 $ 1,617.00
Change to native plant
Materials-various parks $ 483.00 $ 483.00
Add outlets to large
Pavilions at Trotwoodl
Sam Smith & Sunshine $ 1,930.99 $ 1,930.99
Provide duplex septic
Tank at CWP $ 32,000.00 $ 32,000.00
Add 8 doors Civic!
Senior Center $ 6,635.47 $ 6,635.47
De-muck soil Sunshine
Pavilions $ 8,224.00 $ 8,224.00
Provide smaller sink!
CWP $ 1,474.20 $ 1,474.20
Sod $ 20,736.00 $ 20,736.00
De-mucking- Torcaso -0- $ 8.500.00
Total: $57,018.16 $65,518.16
ELECTIVES:
Batting Cageffrotwood $50,348.00 $50,348.00
Sunshine ball field $49,425.00 $49,425.00
Connector walkway/
Sunshine- Trocaso $19,233.00 $19,233.00
Lighting to connector
Walkway $23,258.00 $23.258.00
Add connector bridge/
Sunshine- Torcaso $ 10.000.00 $10.000.00
Total: $152,264.00 $152,264.00
GRAND TOTAL: $209.282.16 $217,783.00
FUNDING:
Funds available from the 1999 Revenue Bond Issue.
2
RECOMMENDATION:
Staffis recommending approval ofthe $8,500.00 to Change Order No.1 for de-mucking of Torcaso
Park.
IMPLEMENT A TION SCHEDULE:
Upon approval.
ATTACHMENTS:
Attachment #1-
Starmer Ranaldi Planning and Architecture, Inc.
Letter of June 9, 2000.
COMMISSION ACTION:
Agendal08
...,
-'
ATTACHMENT #1
.
'srI
9 Jun 00
Chuck Pula, Director
Park and Recreation Department
City of Winter Springs
1000 East SR 434
Winter Springs, Florida 32708
Re: Parks Improvement Project
Change Order NO.2 Update
Chuck
I returned to the office today around 2:00 p.m. and returned a phone call to the contractor M. H. Williams
to leam that the both the restroom facility and the tot lot pavilion at Torcaso Park failed the compaction
tests which were done by Universal Engineering Sciences prior to the concrete being poured for the
foundations. Universal proceeded with additional tests to discover that both building pads had muck below
the surface and although we do not have their report of findings it appears the muck is 6" to 36" in depth.
With this news we recommend that the City add an additional $ 8500 to the change order nO.2 revising the
current contract change from $ 209,282.16 to a new total of$ 2] 7,782. ]6.This recommendation comes
considering the following background:
I. Initially these two buildings were located on the south side of the pond but soils reports
showed muck to a depth of]8 feet which meant an expense of approximately $ 30,000 for pile
foundations.
2. We then had borings done on the north side of the lake, which showed some muck 6" to ]8"
and some areas with no muck.
3. We directed the contractor to move the buildings to the north side and provide test excavations
to identify areas with out muck for the new building locations.
4. This was done and the foundations were dug only to find that less than 24" away from the test
holes showing no muck, muck was discovered after the compaction tests failed.
5. It appears that this entire area was created several years ago with fill brought in over an
existing swamp area and there does not appear to be any area for the facilities without some
unsuitable soils being encountered.
6. In discussing the cost to de-muck with the contractor we feel fairly confident that $ 8500 will
cover the cost because these buildings are slightly smaller and there appears to be less muck
than the two similar buildings at Sunshine Park where we have a bid for de-mucking. In
addition we have a fixed equipment cost and a unit price for both muck removal and clean fill
that we will monitor to keep the cost to a minimum with $ 8,500 as a not to exceed cost.
We know this does not come as good news but feel these are amenities that will enhance the park for our
community an with little other options we recommend proceeding with the de-mucking upon confirmation
of the exten 0 the muc in the pending Universal Engineering Sciences report.
Starmer Ranaldi Planning and Architecture Inc. AA-002984
890 Nonhem Way Suire E-I Winter Springs, Florida 32708 Phone 407 977 1080 Fax 407 977 1019