Loading...
HomeMy WebLinkAbout2000 01 10 Consent C Increased Authorization For The Hayes Road Turn Lane Improvement ~ 't COMMISSION AGENDA ITEM c CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR January 10,2000 Meeting MGR {r\/'>oEPT J~ Authorization REQUEST: Public Works Department Requesting an Increased Authorization for the Hayes Road Turn Lane Improvements PURPOSE: The purpose of this Board item is to request an increased authorization to the contractual agreement with APEC, Inc. for the construction of the Hayes Road Turn Lane Improvements of$6,604.I4. CONSIDERATIONS: This increased authorization of $6,604.14 is needed to cover the additional costs associated with accelerating the construction of the Hayes Road Turn Lane Improvements without closing the road. The contract was originally authorized by the City Commission on August 23rd for $69,250 plus a 10% contingency. At the October 11 th City Commission meeting, a desire was expressed to construct the improvements at an accelerated rate without closing the road to minimize the inconvenience to the residents, school bus routes, etc. The request was reviewed with the contractor who developed a plan to use an asphalt base instead of a limerock base and keep at least one lane open at all times. The estimated cost was below the 10% contingency previously authorized and the contractor was advised to proceed. During construction, groundwater was discovered at the subbase level necessitating the need for an underdrain at a cost of$5,452.I4 which used most of the contingency. The final construction cost for this project is $82,779.14 or $6,604.14 over the initial authorization. ~ January 10, 2000 Consent Agenda Item C Page 2 FUNDING: The final construction cost of$82, 779.14 is below the $165,000 budgeted for this project in the Transportation Impact Fee Capital Improvement line code (140-56310). Funds will be expended within 30 days of issuance of approval. RECOMMENDA TION: It is recommended that authorization be granted to enter into a contractual agreement with to enter into a contractual agreement with APEC, Inc. for the construction of the Hayes Road Turn Lane Improvements at a cost of$69,250.00 plus a 10% contingency payable from the Transportation Impact Fee Capital Improvements line code #140-56310. IMPLEMENTATION SCHEDULE: The project will be closed out for within 30 days. ATTACHMENTS: 1. Change Order #2 COMMISSION ACTION: '.... (IEC-:23-1999 08:56 A TT ACHMENT NO. 1 ~ CONTRACT CHANGE ORDeR Chaoae Order No, 2 Project No. ITB-014-9Q-KL ProJed TItle: Haves Road Turn '-ane at $.R 434 Contractor: A.P.E.C._ Jne ReaS01\ For Change: 1) Documented costs in Accelerating Hayes St Closure 2) Documented Additional TflTle to Design and Construct Underdrnln System The Following ModIfIcaOOns to the Contract are HM1by Ordef9d: Additional cost-Curbing Additional cost-8ase Course Additional Cosl-levellng Course Additional Cost-Project Coordination. MOT $ 1,920.00 $ 4.212.00 $ 960.00 $ 985,00 Change Order Value:' Ol1glonal Contrad Price: otaf Value Previous Change Orders: $ a,on.oo $69.250.00 $ 5,452.. 14 $ 82,n9.14 90 Days 1219/99 o Days 12 Days 102 Days New Contract Completion Date 1 V211'99 coepted By Contractor: Dab!: /dZS/9 'I o.te: /z/z~ fer? , Cap. Pt1- CoordInator. D1rectOC' Public Works Datti; 0lIf0: TI)TI~ P. 01