HomeMy WebLinkAbout2000 01 10 Consent D Authorization to Expend Funds To Convert To Underground or Eliminate Existing Overhead Electric
r~
COMMISSION AGENDA
ITEM D
CONSENT X
INFORMATIONAL
PUBLIC HEARING
REGULAR
January 10, 2000
Meeting
MGR ~ /DEPT j.J:J.---
Authorization
REQUEST: Public Works Department Requesting Authorization to Expend Funds to
Convert to Underground or Eliminate Existing Overhead Electric, Cable and
Telephone Crossings and Stay Guy Wires on S.R. 434 from S.R. 419 to
Tuskawilla Road
PURPOSE: The purpose of this Board item is to request authorization from the City
Commission to Enter into a Authorization Agreement with Florida Power
Corporation, Time Warner Cable, and BellSouth to Convert the Existing Overhead
Crossings to Underground Crossings and eliminate stay guy crossings on S.R. 434
from S.R. 419 to Tuskawilla Road at a cost not to exceed $158,594.47.
CONSIDERA TIONS:
This work is needed to continue the process of eliminating overhead utility
crossings on S.R. 434, which will enhance the appearance of the corridor. Florida Power
has provided us a cost of $98,797.47 to convert the existing overhead electric crossings
from S.R. 419 to Tuskawilla Road. This does not include the FPL transmission lines near
the intersection ofS.R. 434 and S.R. 419. Time Warner Communications and Bellsouth
have also provided cost estimates $6,600 and $53,200, respectively to eliminate the cable
and phone crossings from S.R. 419 to Tuskawilla Road. Sprint does not have any
crossings in this area.
Consent Agenda Item 0
January 10, 2000
Page 2
To date, we have expended $169,590.64 on eliminating overhead crossings and
burying overhead utilities along the S.R. 434 corridor. Approval of these appropriations
would complete the removal of the utility crossings on the S.R. 434 corridor.
FUNDING:
The $158,594.47 was part of the $500,000 utility conversion component of the
$1,000,000434 Village Walk budgeted expense included in the 1999 Construction Fund
budget. The budget line code would be #56316 under the 1999 Construction Fund.
RECOMMENDA TION:
It is recommended that authorization be given to Enter into a Authorization
Agreement with Florida Power Corporation, Time Warner Communications and
BellSouth for a total cost not to exceed $158,594.47 to convert the Existing
Overhead Crossings on S.R. 434 from S.R. 419 to Tuskawilla Road to
Underground Crossings payable from the 1999 Construction Fund. Funds will be
expended within sixty days of approval.
IMPLEMENTATION SCHEDULE:
The crossings will be scheduled for construction when the utility companies
receive payment. DOT permits are pending. Utilities should be complete within 180 days
of the execution of the authorization.
ATTACHMENTS:
1. Authorization and Agreement - FPC
2. Time Warner Communications, Inc. Quote
3. BellSouth Quote
COMMISSION ACTION:
ATTACHMENT NO.1
..... .
..~...;'. FLORIDA
:. ~.~
\:\...,:1 POWER
.....i. .'
-......
AUTHORIZATION AND AGREEMENT
CORPORATION
[8] WORK AUTHORIZATION
CUSTOMER'S NAME ( TRADE NAME
[] JOB ORDER
REPRESENTATIVE'S NAME
J35-99,1571UG
REPRESENTATIVE'S TITLE
INVOICE
NUMBER 99-1571
CITY
DIRECTOR OF PUBLIC WORKS
STATE ZIP
CITY OF WINTER SPRINGS
KIP LOCKCUFF
1126 E SR 434
WORK DESCRIPTION
WINTER SPRINGS
FL
32708
CONTRIBUTION IN AID OF CONSTRUCTION
REMOVE ALL OVERHEAD ELECTRIC DISTRIBlITlON ROAD CROSSINGS AND ALL
SPAN GUYS AND GUY POLES ON SR 434 BETWEEN CR419 AND TUSKAWILLA ROAD.
INSTALL NEW UNDERGROUND ELECTRIC DISTRIBUTION AND REPLACE WOOD POLE
WITH CONCRETE POLE RESPECTFULLY.
Florida Power Corporation is nO! responsible for damage 10, or costs arising from unknown underground facilities, landscape or driveways in trench roUles.
BILLING METHOD
~Contract Price $ 98797.47 ~Cost
OTHER TERMS OF PAYMENT
OCostplus 15%
TERMS OF PAYMENT nor ore Other
20 days after
~ In advance 0 Date of invoice 0 Explain below
OWNERSHIP OF COMPLETED PROJECT DATE CHECK RECEIVED
~FPC o Customer
AGREEMENT
The Customer is responsible for the cost. repair or replacement of (1) any sod,trees,shrubbery,or other plants damaged in the normal course of performing or gaining
access to the above work, and (2) any damage to non,FPC underground wires. conduit. pipes or other utility facilities that have not been staked or located by owner
of the facilities. Contract price and terms of payment become invalid if the signed Agreement is not received by FPC on or before ......... 30 DAYS
The Undersigned hereby authorizes and employs Florida Power Corporation to perform the above work including all necessary labor, facilities, equipment and ( or
materials to pay in accordance with the above terms of payment.
SIGNATURE OF ABOVE CUSTOMER OR REPRESENTATIVE
DATE
REPORTING LOCATION
JAMESTOWN
ACCOUNTING INFORMATION
DATE (MONTH&YEAR) J.E.(MONTH&NUMBER) SEa
2 6 6 10
ACTIVITY COMMENT ,
3.
OH TO UG CONVERSION
CHARGES (DEBIT) CREDITS $ AMOUNT
PRIMARY PRIMARY IA:'IVKA
ACCOUNT RA EAC ACTIVITY A CODE ACCOUNT RA EAC ACTIVITY CODE
<0 <J <6 <. ss <0 <3 <6 <. ss
14220 562 364 562 811 AJ3519 51232X $4,336.12
14220 562 365 562 811 AJ3519 51232X $2,135.70
14220 562 562 809 AJ3619 50485W $20,475.00
14220 562 562 809 AJ3519 51232W $71,850.65
TOTAL $98,797.47
TO: CONTROLLER'S DEPARTMENT
,
Please open Job Order (or accumulating costs.
U:OU!;S rEO 8'( DATE
I ACIIVI'.... I rASI( IC()V"~€ flOt4 OA1(
I'll:,,";': 1:111',': Joh QHlm 10
,_ ev. "^,,
WORK ORDER
NUMBER
7068023333
ORIGINAL PLANr ACCOUNlIf<G/GENErlAL ACCOUNrlNG COPIES TO P&DAO; Dlsn~'CT Or-FICE; CUSTOMEH, OHIGINATlNG DEPAHTMENT
..
1:
" t': i I. , '.' I! i I -,' i~'.. 'r ;.
ATTACHMENT NO.2
(:;"1" If"III/1I ;..h.; .>J;f,
I,) ./11- '. ::;,;, ,"(J.,'5o
I;, \ -Ifl~' (, ,\'J.II/,:
~ TIME WARNER
" COMMUNICATIONS
November 9, 1998
Mr. Kipton D. Lockcuff, P.E.
City of Winter Springs
1126 East S.R. 434
Winter Springs, Florida 32708
RE: State Road 434 Utility Conversion
(Phase I) Highway 17-92 to C.R. 419
(Phase II) C.R. 419 to Tuskawilla Road
Dear Mr. Lockcuff:
As requested, Time Warner Communications has completed its preliminary cost assessment to convert
overhead CATV crossings to underground along the above referenced corridor. It is our understanding that
your request is limited to that of removing our overhead facilities which currently cross over State Road
434. As previously discussed, this activity will necessitate the installation of a directional bore at each of
our existing overhead crossing locations.
The following cost is representative of all construction, splicing and overhead cable removal required to
accommodate the City of Winter Springs' request. Please note, schedules, dependent activities and
duration's of construction have not been assessed or identified as of this date.
Phase I - (State Road 434, from Highway 17-92 to C.R. 419)
Construct, splice and activate new underground CATV lateral crossings at (9) nine locations. Removal of
existing overhead crossings at (10) ten locations. Cost $29,700
Phase II - (State Road 434, from C.R. 419 to Tuskawilla Road)
Construct, splice and activate new underground CATV lateral crossings at (2) two locations. Removal of
existing overhead crossings at (3) three locations. Cost $6,600
Following your review of the aforementioned information, please do not hesitate to contact me if you
should have any questions or comments. I can be reached at (407) 654-0657.
Sincerely,
-#ltWvAd-~gt .
Marvin L. Usry, Jr.
Construction Supervisor
'-':r-"'- "'10 lED
At:...,'....!":". '.:',
cc: P.J. King, Time Warner Communications
~j n IJ ~ :1 1998
C", :';.{ :..;?RINGS
'J: :..' 1'( ',JI;={[(;T')R
j. ~
t.
(
ATTACHMENT NO.3
@ BELLSOUTH
BellSouth Telecommunications. Inc. 407277,1697
450 North Goldenrod Road Fax 407 277,7241
Orlando. Florida 32807
November 17, 1998
Kip Lockcuff, P.E.
City of Winter Springs
1126 East S.R. 434
Winter Springs, Fl. 32708
Re: Relocation of BellSouth cable facilities, S.R 434
Dear Kip,
Per your request, I have run an estimate on the cost of relocating all BellSouth's aerial
cable facilities to underground, within the scope of your project. As I have stated in our
telephone conversation, we have no aerial facilities which need to be relocated in Phase 1
of this project, from S.R. 17-92 to C.R. 419. In Phase 2, which runs from c.R. 419 to
Tuscawilla Rd., we have four separate locations where we have aerial fiber or copper
cables crossing the road. The approximate billable cost to relocate these facilities would
be $53,200, and we would like 90 days notice, prior to the start of the project, to issue
drawings to relocate these facilities.
Piease contact me at 273-5084 if you have any further questions regarding these costs. I
will put this work on hold until I hear back from you on an estimate start date, so we can
begin the engineering work required to complete this work.
Sincerely,
9P~~
~ Farrell, Project Manager