Loading...
HomeMy WebLinkAbout2007 04 23 Consent 200 Study of Improvements To SR 419 Industrial Park CITY OF WINTER SPRINGS April 23, 2007 Regular Commission Meeting 042307 _COMM_ConsenC200_Supplemental_Appropriation_ 419 _Industrial]ark_Study COMMISSION AGENDA ITEM 200 Consent X Informational Public Hearin Re ular April 23, 2007 Special Meetmg Mgr. /~ Dept. Authorization REQUEST: The City Manager requesting the City Commission to confirm approval of a $5,000 supplemental appropriation to fund a preliminary study of improvements to the S.R. 419 Industrial Park. PURPOSE: This agenda item is needed for the Commission to confirm its support of a study to explore ways in which improvements may be made to the S.R. 419 Industrial Park to make it more compatible with surrounding land uses, and more functional and aesthetically enhanced in the interior of the park. CONSIDERATIONS: At the April 9, 2007 Commission meeting the City Manager under reports initiated a discussion regarding opportunities that may exist to improve the aesthetic value, functionality, and compatibility of the S.R. 419 Industrial Park with both its neighbors and internal users. The City Manager requested $5,000 to perform a preliminary study that would include interaction with park users. The Commission reaction was favorable and the Manager advised he would formalize the proposal in a subsequent Commission meeting. FUNDING: A supplemental appropriation of $5,000 will be needed for the Community Development Department line code 1510-53180-30119 in the general fund. RECOMMENDATIONS: It is recommended that the Commission formalize approval of a $5,000 supplemental appropriation to perform a preliminary study of the S.R. 419 Industrial Park as provided herein. A TT ACHMENTS: Study proposal from S.R.I. COMMISSION ACTION: City Manager City of Winter Springs 1126 East SR 434 Winter Springs, Florida 32708 Re: Winter Springs Industrial Park Professional Services Proposal Ron Based on our recent discussions, the growing concern of the image of the City's industrial park, and your request for improvement ideas we offer the following proposal for professional design services for your review and approval. I. Scope of Project Develop ideas on improving the appearance of the City's Industrial Park located off SR 419 which address: A. exterior improvements (aesthetic perception) B, interior improvements (aesthetic and functional elements) C. establishment of standards (minimum guidelines / controls for future development) II. Scope of Basic Services sri shall provide professional design services for this project to develop alternative design concepts with the following tasks: A. Pre- Design (PD) 1. Confirm clients goals and objectives 2. Obtain available site data to define limits of project 3. Hold a pre-design workshop with all design consultants and appropriate City personnel to identify all constraints and opportunities for the project. 820 WEST BROADWAY STREET. SUITE 3000 OVIEDO. FLORIDA 32765 (P) 407-977-1080 (F) 407-977-1019 AAOOO2984 WWW.SRIARCH.COM B. Design Concept (DC) 1 . Develop alternative design solutions for exterior / perimeter aesthetic improvements 2. Develop alternative design solutions for interior / internal aesthetic and functional improvements 3. Develop minimum design standards for control of future development 4. Hold work shop with current owners with in the Industrial Park to share ideas and identify their concerns 5. Prepare final recommendations for City approval III. Scope of Additional Services The following services are considered beyond the scope of basic services and can be provided by sri upon confirmation of scope and written authorization by the owner: A. Complete design services including construction documents B. Models C. Renderings D. 3D modeling, graphics, fly arounds, videos E. Public hearing and/or presentations F. Expert witness / legal testimony IV. Schedule of Services A. Pre Design (PD) B. Design Concept (DC) 2 weeks 4 weeks V. Schedule of Fees A. Pre Design (PD) B. Design Concept (DC) lump sum lump sum $ 500 $ 3.400 VI. Clarifications A. The fees quoted herein are based on our current understanding of the scope of work and should the scope change significantly additional compensation may be warranted. B. Fees quoted herein are based on identification of possible design standards. Actual preparation of design guidelines and development regulations shall be by owner. C. Fees quote herein are based on development of design idea sketches and conceptual drawings. Actual construction documents suitable for building the improvements shall be considered beyond the scope of this agreement. We trust this proposal will be well received and we look forward to helping you make this project a great success. Regards will, , President