HomeMy WebLinkAbout2007 03 12 Consent 202 Public Works Facility COMMISSION AGENDA ITEM 202 CONSENT March 12,2007 Meeting MGR DEPT Authorization REQUEST: UtilitylPublic Works Department is requesting appropriation of additional funding for unforeseen cost to the Public Works Facility. PURPOSE: The purpose of this Board item is to request authorization for $18,571 for the Utility/Public Works Facility project. CONSIDERA TIONS: The design of the electrical system for the Utility/Public Works Facility was based upon the original desire of an administration building, garage, operations building and one storage building. The administration building and the garage were designed to share electrical power from one transformer and the operations building to share another transformer with up to 4 storage buildings. At complete build out, both transformers would have a requirement to be of a specific type as required by Progress Energy. Higher than expected construction cost during the bid process resulted in a decision to not build the administration building, but instead add another storage building. This reduced the electrical load on the shared transformer between the garage and administration building. This reduced load did not reduce the size of the transformer, but did cause some internal wiring of the transformer supplied by Progress Energy to change. This requirement did not become evident until the transformers were delivered and installed by Progress Energy the week of February 19,2007. This change of transformer set up created an unexpected change in the electrical wiring leading from the transformer to the garage building. Due to the high cost of the electrical copper wiring which now must be installed, subsequent removal and new 031207 _ COMM_ Consent_ 202 _ Additiona1_ Appropriation _ Utility-PW _Compound Consent Agenda Item 202 March 12, 2007 Page 2 of 2 installation of additional number of wires, exceeds the contract contingency fund previously approved. The cost of this change order is $18,571.00. Without the installation of the additional copper wiring, power can not be supplied to the garage building. Final inspections are projected to take place the week of March 19, 2007, with CO issued. For this to occur, the wiring change must take place. FUNDING: The source of funds is the Public Facility Capital Project Fund (311-65000-30037) which has sufficient funds for this change order. RECOMMENDA TION: It is recommended that an increased authorization of $18,571.00 be approved for the Utility/Public Works Facility project electrical service change order payable from (311- 65000-30037). ATTACHMENTS: None COMMISSION ACTION: