Loading...
HomeMy WebLinkAbout2007 02 12 Consent 406 Miller School Supply COMMISSION AGENDA ITEM 406 Consent February 12. 2007 Meeting MGR. /Dept. . REQUEST: The Public Works Department requests the City Commission validate the staff recommendation f'mding Miller School Supply to be built in substantial accordance with the Final Engineering plans PURPOSE: The purpose of this Agenda Item is to request the City Commission validate the staff recommendation finding Miller School Supply to be built in substantial accordance with the Final Engineering plans per Section 9-178 in order for Certificates of Occupancy to be issued. The site is located at the southeast comer of S.R. 434 and Hacienda Drive. APPLICABLE CODE: Section 9-178. Required Improvements to be completed prior to building on lots; exceptions. (c) Where the building official has an authoritative method of assurance that the improvements will be completed in accordance with approved plans, such as withholding occupancy, the building official may issue building permits upon advising the developer that all or partial occupancy will be restricted until satisfactory completion of the improvements has be accomplished. (d) ... Certificates of occupancy will not be issued until all improvements are accepted by the city commission. FINDINGS: 1) The site has been constructed in substantial accordance with the Final Engineering plans approved by the City Commission at the May 9,2005 City Commission meeting. 2) All City agencies have found the work to be acceptable. 021207_ COMM _ Consent_ 406_ Miller School Supply_Acceptance February 12, 2007 Consent Agenda Item 406 Page 2 3) Utility, landscape, and cross-access easements have been provided as shown on the final engineering plans. 4) As required by the City Commission as a part of the Final Engineering approval, the five live oak trees originally shown in the retention pond have been replaced with bald cypress trees, and the irrigation has been modified to accommodate the changed retention area. 5) Record drawings have been received and approved by Staff. RECOMMENDATION: Staff recommends that the City Commission validate the staff recommendation finding Miller School Supply to be built in substantial accordance with the Final Engineering plans. IMPLEMENTATION: The Certificate of Occupancy can be issued after Commission approval. ATTACHMENTS: None CITY COMMISSION ACTION: 021207 _ COMM _ Consent_ 406 _Miller School Supply-Acceptance