Loading...
HomeMy WebLinkAbout2008 09 22 Consent 200 Town Center Building 17 Built in Accordance with Final Engineering PlansCOMMISSION AGENDA ITEM 200 Consent X Information Public Hearin Re ular September 22, 2008 MGR. ~ /Dept. ~~~` Meeting REQUEST: The Public Works Department requests the City Commission validate the staff recommendation finding the Town Center Building 17 site to be built in substantial accordance with the Final Engineering plans and to accept the potable water and sanitary sewer infrastructure for ownership and maintenance. PURPOSE: The purpose of this Agenda Item is to request the City Commission validate the staff recommendation finding the Town Center Building 17 site to be built in substantial accordance with the Final Engineering plans and to accept the potable water and sanitary sewer infrastructure for ownership and maintenance per Section 9-178 in order for Certificates of Occupancy to be issued. APPLICABLE CODE: Section 9-178. Required Improvements to be completed prior to building on lots; exceptions. (c) Where the building official has an authoritative method of assurance that the improvements will be completed in accordance with approved plans, such as withholding occupancy, the building official may issue building permits upon advising the developer that all or partial occupancy will be restricted until satisfactory completion of the improvements has be accomplished. (d) ... Certificates of occupancy will not be issued until all improvements are accepted by the city commission. CONSIDERATIONS: Town Center Building 17 is a 26-unit condominium building by the James Doran Company located on a 0.81 acre site on the south side of Blumberg Boulevard in the Winter Springs Town Center. The site abuts the Kingsbury property to the east, the Building 16 parcel to the south, 092208_COMM_Consent 200_Town Center Building 17 Site Acceptance September 22, 2008 Consent Item #200 Page 2 Cliff Rose Drive to the west, and Blumberg Boulevard to the north. Along with the 26 condominium units the site contains an outdoor Jacuzzi and grill area along with 41 onsite parking spaces in a gated parking lot accessible from Cliff Rose Drive. FINDINGS: 1) The site has been constructed in substantial accordance with the Final Engineering plans approved by the City Commission on August 28, 2006, except as noted on the attached site punchlist, Exhibit A. 2) All City agencies have found the work to be acceptable, except as noted on Exhibit A. 3) The engineer-of-record has certified the sitework and provided a complete set of record drawings. 4) The developer has provided atwo-year maintenance bond for the water and sewer utilities being turned over to the City for ownership and maintenance. 5) The developer has dedicated and recorded the required onsite utility easements. 6) The Final Engineering plans were approved with a condition that the developer provide six (6) temporary unpaved parking spaces on the adjacent undeveloped building pad located on the west side of Cliff Rose Drive across the street from Building 17. This area is stabilized and available to be converted into temporary parking spaces as needed to meet the peak parking demand for Building 17. RECOMMENDATION: Staff recommends that the City Commission validate the staff recommendation finding the Town Center Building 17 site to be built in substantial accordance with the Final Engineering plans and to accept the potable water and sanitary sewer infrastructure for ownership and maintenance, subject to satisfactory completion of all site punchlist items listed in Exhibit A. IMPLEMENTATION: The Certificate of Occupancy can be issued after Commission approval and satisfaction of all site punchlist items listed on Exhibit A. ATTACHMENTS: 1. Exhibit A -Site Punchlist dated September 9, 2008 CITY COMMISSION ACTION: 092208_COMM_Consent 200_Town Center Building 17 Site Acceptance EXHIBIT A Town Center Building 17 Site Completion Punchlist September 9, 2008 Construction Items to Complete: 1. Install the two handicapped diagonal parking spaces on Blumberg Blvd per the plans 2. Paint backflow preventer black (use NSF 61 approved paint for potable water lines) 3. Re-Jet/Vac stormwater system 4. Place 2" curb stop that was to be used as irrigation in an at-grade box 5. Install detectable warnings at the parking lot entrance (south side) and at the sidewalk point of entry into the back of the parking lot 6. Install the bike rack per the plans 7. Install the two parking lot lights shown on the plans in the two parking lot islands 8. Verify that all valve box covers and cleanout caps can be removed (some appear to be sealed with concrete) 9. Clean up concrete and trash in green areas 10. Onsite signs are required to be the decorative type meeting the Town Center Standards (per the approved agenda item) 11. Building permits for the parking lot gate and trellis at the traffic circle must be pulled prior to C.O. for Building 17. 12. Finish landscaping. Contact Steve Richart at 407-327-5976 to schedule a final inspection for landscape and irrigation, if you have not already 13. Verify with the Fire Inspector that the onsite fire hydrant has passed the flow test