Loading...
HomeMy WebLinkAbout2008 07 14 Consent 206 Inwood Office Building Phase I in Accordance with Final Engineering PlansCOMMISSION AGENDA ITEM 206 Consent X Information Public Hearin Re ular July 14, 2008 MGR. /~ /De t. ~ ~~ Mccting REQUEST: The Public Works Department requests the City Commission validate the staff recommendation finding the Inwood Office Building Phase I site to be built in substantial accordance with the Final Engineering plans and to accept the potable water and sanitary sewer infrastructure for ownership and maintenance. PURPOSE: The purpose of this Agenda Item is to request the City Commission validate the staff recommendation finding the Inwood Office Building Phase I site to be built in substantial accordance with the Final Engineering plans and to accept the potable water and sanitary sewer infrastructure for ownership and maintenance per Section 9-178 in order for Certificates of Occupancy to be issued. APPLICABLE CODE: Section 9-178. Required Improvements to be completed prior to building on lots; exceptions. (c) Where the building official has an authoritative method of assurance that the improvements will be completed in accordance with approved plans, such as withholding occupancy, the building official may issue building permits upon advising the developer that all or partial occupancy will be restricted until satisfactory completion of the improvements has be accomplished. (d) ... Certificates of occupancy will not be issued until all improvements are accepted by the city commission. CONSIDERATIONS: • The 3.86-acre Inwood Office Building site is located on the north side of Dovera Drive within the Oviedo Marketplace DRI Parcel 14A. 071408_COMM_Consent 206_Inwood Office Building Site Acceptance July 14, 2008 Consent Item #206 Page 2 • Phase I consists of a new 30,000 SF office building and related site infrastructure and landscaping improvements. The 30,000 SF building is under construction and is expected to be complete within the next several weeks. Phase II will add another 15,000 SF of office space and additional parking. FINDINGS: 1) The site has been constructed in substantial accordance with the Final Engineering plans approved by the City Commission on July 23, 2007, except as noted on the attached site punchlist, Exhibit A. 2) All City agencies have found the work to be acceptable, except as noted on Exhibit A. 3) The engineer-of-record has certified the sitework and provided a draft set of record drawings. 4) The developer has provided atwo-year maintenance bond for the water and sewer utilities being turned over to the City for ownership and maintenance. 5) The developer has provided signed utility easement agreements to the City for all onsite utility easements. 6) The FDEP sanitary sewer clearance applications have been approved by the City and returned to the developer for submission to FDEP. FDEP approval must be obtained prior to a Certificate of Occupancy. RECOMMENDATION: Staff recommends that the City Commission validate the staff recommendation finding the Inwood Office Building Phase I site to be built in substantial accordance with the Final Engineering plans and to accept the potable water and sanitary sewer infrastructure for ownership and maintenance, subject to satisfactory completion of all site punchlist items listed in Exhibit A. IMPLEMENTATION: The Certificate of Occupancy can be issued after Commission approval and satisfaction of all site punchlist items listed on Exhibit A. ATTACHMENTS: 1. Exhibit A -Site Punchlist dated July 7, 2008 CITY COMMISSION ACTION: 071408_COMM_Consent 206_Inwood Office Building Site Acceptance EXHIBIT A Site Punchlist Project: Inwood Office Building Date: July 7, 2008 The following items must be completed prior to issuance of a Certificate of Occupancy: 1. Replace damaged detectable warning mats (several locations). 2. Repair asphalt damage near the front building entrance. 3. Install the ribbon curb at the project phase line per the plans. 4. Install the speed limit sign on the entrance road per the plans. 5. Repair low spots in the parking area that puddle after storms. These are mostly along the east side of the parking lot median islands at the west side of the site. 6. Complete all site landscaping and irrigation. Contact Steve Richart (321-689-1417) for inspections. 7. Clean the stormwater system after all sitework is complete. Erosion control should be installed and maintained while site construction is ongoing. 8. Complete installation of parking lot lighting. 9. Clean the entire site including all dirt, trash, and construction debris. 10. At the side entrance to the parking lot, replace the curb returns on both sides. These are awkward looking and the vertical portion of the curb should not jog into the travel lane. Suggest using FDOT Index #304 (CR-20) per the sketch below: r• o~~ ~ ~`~ ~~~0 -- _.- ,.p 0.02 Ramp And Sidewalk Curb >~ ~~~ c'~ / ?~ `~'-~ 2' Londinp* . - Romp W idM f ~' Alln. 1 ~ • ^ CR If there are any questions, please contact Brian Fields at 407-327-7597 or by a-mail at bfields wintersprinctsfl.org. Site Punchlist 7-7-08 Page 1 of 1