Loading...
HomeMy WebLinkAbout2008 06 09 Consent 206 Pegasus EngineeringCOMMISSION AGENDA ITEM 206 CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR n ,,' /'/~ June 9, 2008 MGR ~/ /DEPT ,~ Meeting Authorization REQUEST: Public Works Department requesting authorization to enter into a contractual agreement with Pegasus Engineering to provide professional engineering services for roadway improvements to Wade Street and S.R. 419, piggybacking off a contract with the City of Winter Garden PURPOSE: The purpose of this agenda item is to request authorization to enter into a contractual agreement with Pegasus Engineering of Winter Springs to provide professional engineering services for roadway improvements to Wade Street and S.R. 419 at a cost of $88,934, piggybacking off a contract with the City of Winter Garden CONSIDERATIONS: • The project consists of roadway improvements to S.R. 419 and Wade Street in partnership with the Florida Department of Transportation (FDOT). This project is part of the City's three-year master pavement plan, with design scheduled for this year and construction scheduled for FY 08-09. • The planned improvements are as follows: o Wade Street reconstruction from S.R. 419 to Old Sanford-Oviedo Road o Addition of a southbound left-turn lane from Wade Street onto S.R. 419 o Addition of an eastbound and westbound left-turn deceleration lanes from S.R. 419 onto Wade Street o Addition of a right-turn deceleration lane on S.R. 419 westbound onto Wade Street 060908_COMM_Consent_206_Wade Street Engineering Services June 9, 2008 Agenda Item #206 Page 2 of 3 • The existing pavement on Wade Street is in poor condition and will be reconstructed with a pavement section designed to withstand the heavy truck traffic from the surrounding industrial properties. • FDOT recently completed a study of the Wade Street / S.R. 419 intersection which recommended the construction of left-turn deceleration lanes on S.R. 419 at Wade Street. The left-turn lanes will help improve traffic flow and reduce rear-end collision potential caused by vehicles stopping in the through lanes to make left turns onto Wade Street. • FDOT has agreed to partner with the City for this project under a Joint Project Agreement. FDOT has agreed to fund construction of the left turn lanes on S.R. 419 at an estimated construction cost of up to $375,000. The City would be responsible for funding the Wade street improvements, the right-turn deceleration lane on westbound S.R. 419, and the design costs. The City's construction portion of the project is estimated to cost $250,000, for a total estimated project construction cost of $625,000. Depending on the terms of the Joint Project Agreement, FDOT may contribute the portion of the design costs necessary for the FDOT-funded improvements on S.R. 419. CONSULTANT SELECTION: For the Wade Street / S.R. 419 project, the City of Winter Springs intends to piggyback off Pegasus Engineering's Continuing Consulting Contract for Professional Engineering Services with the City of Winter Garden. Pegasus Engineering was ranked first by the City of Winter Garden in the category of Roadway and Drainage design services. Pegasus Engineering's main office is in the City of Winter Springs and both of the firm's principals are Winter Springs residents. Pegasus recently completed design services for the City on the Northern Way /Shetland Avenue Sidewalk Project, and the firm's principals have worked on several major transportation projects in the City. Pegasus has been actively involved in the preliminary planning for the Wade Street / S.R. 419 Project, and they have assisted the City with obtaining acost-sharing commitment from FDOT for the project. FUNDING: The $88,934 for roadway design services is requested to be funded by the Road Improvement Fund, #115 through a line code transfer from line item #115-65000-30055 - Michael Blake Boulevard. This line item has a budget of $1,900,000 and was budgeted based on a required reimbursement after construction of Michael Blake Boulevard as a part of the Town Center Phase IIA and Sonesta Pointe developments. A total of $1,013,424.70 from the Michael Blake Boulevard line item has already been re-allocated to fund the City's road reconstruction 060908_COMM_Consent_206_Wade Street Engineering Services June 9, 2008 Agenda Item #206 Page 3 of 3 project. Michael Blake Boulevard will be re-budgeted for FY 08-09 based on ongoing discussions with the developers. RECOMMENDATION: Staff recommends that authorization be granted to enter into a contractual agreement with Pegasus Engineering provide professional engineering services for roadway improvements to Wade Street and S.R. 419 at a cost of $88,934. ATTACHMENTS: 1. Exhibit A -Wade Street / S.R. 419 Improvements Map 2. Exhibit B -Proposal from Pegasus Engineering dated May 20, 2008 COMMISSION ACTION: 060908_COMM_Consent_206_Wade Street Engineering Services Exhibit A -~-~ ^~ ~`i --- 412414SOOS02504506 f V 508310S12S14S16' 3S ~_ 306 ' 4 -~ '- Westbound Left turn 43:641 b39537635 3 oAVro 6T 631629 627 625 304 deceleration lane '_ _.. 0 90 180 360 540 720 Feet ~~~ ~y ~{ . Pec,~asus EN6/NEEAIN6 May 20, 2008 Mr. Brian Fields, P.E. City Engineer City of Winter Springs 1126 E. State Road 434 Winter Springs, Florida 32708 RE: Wade Street and State Road 419 Roadway Improvements Proposal for Professional Engineering Services Dear Mr. Fields: P-8004-R2 MK-03 Pegasus Engineering, LLC (PE) is pleased to present this proposal for professional engineering design, and permitting services for the Wade Street and State Road 419 roadway improvements project. The proposed improvements include roadway improvements to Wade Street from State Road 419 to Old Sanford Oviedo Road including the addition of a southbound right-turn lane onto State Road 419, and the addition of an eastbound left-turn deceleration lane and a westbound right-turn deceleration lane on State Road 419. PE staff has a great deal of experience in similar projects throughout Central Florida. This experience includes the permitting process through the Florida Department of Transportation -District 5. Similar projects include the intersection improvements at SR419 at Moss Road, Edgemon Avenue, Layer Elementary Entrance, and SR434. SCOPE OF SERVICES Design, Construction Plans Preparation and Permitting 1. Establish the location of the apparent right-of--way line. 2. Locate all the improvements and utilities, as evidenced by above ground features or as marked by the designated utility company representative. 3. Obtain spot elevations on natural ground and existing monumentation suitable for interpolation of one foot contours. 4. Establish a minimum of two (2) site benchmarks. 5. Review readily available published geologic and topographic information. This published information will be obtained from the appropriate quadrangle map published by the United States Geological Survey (USGS) and the "Soil Survey of Seminole County, Florida" published by the United States Department of Agriculture (USDA) Soil Conservation Service (SCS). "Practical Engineering Solutions" 301 West State Road 434, Suite 309, Winter Springs, FL 32708 •407-992-9160 • Fax 407-358-5155 Mr. Brian Fields, P.E. May 20, 2008 Page 2 P-8004-R2 6. Execute a program of subsurface sampling and field testing. We will perform ten (10) auger borings within the proposed improvements areas to depths of seven (7) feet to determine the estimated seasonal high groundwater table. We will also perform six (6) pavement cores throughout the existing Wade Street pavement. 7. Visually classify and stratify representative soil samples in the laboratory using the AASHTO classification system. Conduct a limited laboratory testing program to aid in classification of soils. Identify soil conditions at each boring location and form an opinion of the site soil stratigraphy. 8. Collect groundwater level measurements and estimate normal wet seasonal high groundwater levels. 9. Prepare complete construction plans in accordance with the latest design standards, design manuals and policies adopted by FDOT as applicable, and in accordance with the City of Winter Springs criteria and preferences. 10. This proposal is based on a SJRWMD exemption. 11. Perform utility coordination. The cost for relocation design of water mains, force mains or gravity sanitary sewer is not included in this proposal. 12. Submit the construction plans to FDOT for permitting review and approval. SCHEDULE A one hundred and twenty (120) day project schedule is anticipated to complete the construction drawings. This time is exclusive of any review time by FDOT. Close coordination will be required in order to minimize the review time by the various agencies. PROFESSIONAL FEES Design, Construction Plans Preparation and Permitting ....................................................$88,934.00 The attached sheet provides a breakdown of the manhours and fees. We appreciate the opportunity to submit this proposal and look forward to working with you. If you have any questions, please contact me. Very truly yours, PEGASUS EN EE ING, L. LC Fursa S. Munjed, P. Project Manager/Principal Attachment G:\Proposals~2008~P-8004R2.doc Mr. Brian Fields, P.E. May 20, 2008 Page 3 P-8004-R2 City of Winter Springs W ade Street and State Road 419 Improvements PE Manhour and Fee Estimate Desictn, Construction Plans Preparation and Permitting Project Project CADD W.P/ Total Total ITEM Manager Engineer Tech. Secretary Hours Cost RATES $100.00 $80.00 $60.00 $40.00 Roadway Design 86 260 176 28 550 $41,080.00 Drainage Design 28 64 43 7 142 $10,780.00 Maintenance of Traffic 16 16 24 0 56 $4,320.00 Signing & Pavement 24 36 48 8 116 $8,480.00 Marking 8 12 16 8 44 $3,040.00 Utility Coordination Coordination With 22 32 43 7 104 $7,620.00 FDOT Quality Control 16 16 0 0 32 $2,880.00 /Constructability Review 200 436 350 58 1,044 $78,200.00 SUBTOTAL $6,970.00 Survey/Right-of-Way $2,200.00 Geotech $1,564.80 Direct Reimbursables $88,934.00 TOTAL: James M. Dunn, II, P.S.M. Brian R. Garvey, P.E. Gary B. Krick, P.S.M. Myron F. Lucas, P.S.M. Thomas K. Mead, P.S.M. Timothy Mosby, P.S.M. James L. Petersen, P.S.M. Larry W. Prescott, P.S.M. William C. Rowe, P.S.M. George E. Snyder, P.S.M. Tony G. Syfrett, P.S.M. SOUTHEASTERN SURVEYING & MAPPING CORP. SURVEYING FLORIDA SINCE 1972 T. Wayne Yongu, P.S.M. Roger Lonsway, P.S.M. (Retired) Steven L. Anderson, Jr., S.I.T. Brad J. Lashley, S.I.T. Abraham I. Remchuk, S.I.T. Donna L. Canney, C.S.T. IV Frank B. Henry, C.S.T. IV David M. Rentfrow, C.S.T., IV Margarita Slavkove, C.S.T. IV Dean C. Sprague, C.S.T. IV Celeste B. van Gelder, C.S.T., IV Land Surveying & Mapping Services • SulrSurface Utility Designation & Location Services • GPS Asset Inventories • Geographic Information Systems May 12, 2008 Via E-mail: fursanna,pe asusengineering.net Mr. Fursan. S. Munjed, P.E. Pegasus Engineering, LLC 301 West State Road 434, Suite 309 Winter Springs, Florida 32708 RE: Wade Street/SR 419 Section 34 & 35, Township 20 South, Range 30 East, City of Winter Springs, Seminole County, Florida Dear Mr. Munjed, We are pleased to submit our revised proposal for Surveying Services on the above referenced project. SCOPE OF WORK: Provide a Design Topographic Survey and establish the apparent right-of--way line in accordance with Chapter 61G17-6 F.A.C. to include the following: 1. Establish the location of the apparent right-of--way line. 2. Locate all improvements and utilities, as evidenced by above ground features or as marked by the designated utility company representative. 3. Obtain spot elevations on natural ground and existing improvements suitable for interpolation of one foot contours to be shown on the fmal drawing. 4. Establish a minimum of two (2) site bench marks. 5. Topographic coverage will be as described in that email received and marked on that plan provided by Pegasus Engineering, LLC via e-mail on 05/12/08. The final product will be certified prints and an electronic file of same on disk for your use. Our fee for the above referenced work will be Six Thousand Nine Hundred Seventy Dollars & 00/100 ($6,970.00). OFFICE 6500 All American Boulevard, Odando, Florida 32810407/ 292-8580 Fax 407/ 292-0141 a-mail: infoCa2southeastemsurveving.com LOCATIONS 1130 Highway 90, Chipley, Florida 32428 850/ 638-0790 Fax 850/ 638-8069 a-mail: info(a~southeastemsurveving.com Page 2 Mr. Fursan Munjed, P.E. Wade Street/SR 419 May 12, 2008 If a Waiver of Subrogation is requested in a Professional Services Agreement, there will be a fee of $150.00 added to this project agreement. We anticipate completion of the above described work within four (4) weeks after receipt of a written notice to proceed. Payment is expected within thirty (30) days from date of invoice. We look forward to the opportunity to work with you on this project. Sincerely, ~~' Gary B. Krick, P.S.M. President/Project Manager GBK:gac If your fum requires a contract to be in place, a PROFESSIONAL SERVICES AGREEMENT will need to be furnished to Southeastern Surveying and Mapping Corporation in lieu of your signature of approval. No work will be commenced prior to the acceptance of said agreement in writing by both parties. AN AGREEMENT/CONTRACT WILL NOT BE ACCEPTED AFTER THIS PROPOSAL LETTER HAS BEEN SIGNED AND WORK HAS COMMENCED. If the above scope, period of service and method of compensation meets with your approval, please execute below and fax to Southeastern Surveying & Mapping Corp. as notice to proceed along with the notice of commencement. ACCEPTED BY: Authorized Signature Printed Name Date Title The person signing this Acceptance Statement has the legal authority to bind this firm to the terms of this proposal and has read and agrees to the terms of this proposal, and additionally has the legal authority to guarantee payment for the tasks completed under this agreement. G:\DATA\Proposall53255 Wade St-SR 419_REV.wpd ~` Infofmation /~'~ .To Build On January 29, 2008 Revised May 13, 2008 Pegasus Engineering, LLC 301 West S.R. 434 Suite 309 Winter Springs, Florida 32708 Attention: Mr. Fursan Munjed, P.E. RE: Proposal Geotechnical Engineering Services Proposed Roadway Improvements Wade Street from S.R. 419 to Old Sanford Oviedo Road Seminole County, Florida PSI Proposal No. 757-8-033 Dear Mr. Munjed: Pursuant to your request for proposal, Professional. Service Industries, Inc. (PS17 is pleased to submit the following fee proposal for performance of a preliminary subsurface exploration program at the site of the referenced project. This proposal is based on the scope of services provided to us, and our conversations with Pegasus Engineering, LLC, and has been revised to address the widening of S.R. 419. Proiect Information The subject site is located in Seminole County, Florida. More. specifically, the project is the proposed improvements of Wade Street from S.R. 419 to Old Sanford Oviedo Road (approximately 670 feet). The improvements will consist of Wade Street pavement reconstruction and widening approximately 1,500 feet of S.R. 419 to accommodate the addition of turn lanes onto Wade Street. In addition, a turn lane will be added from southbound Wade Street to westbound S.R. 419. Scone of Geatechnical Services The purpose of this study is to obtain preliminary information on the general subsurface soil .and groundwater conditions at the proposed project site. The subsurface materials encountered will then be evaluated with respect to the available project characteristics. In this regazd, preliminary geotechnical engineering recommendations related to the proposed roadway construction will be formulated. Professional Service Industries, Inc. • 1748 33rd Street • Orlando, FL 32839 • Phone 407/304-5560 • Fax 407/304-5561 Engineering Certificate of Authorization 3664 Pegasus Engineering, LLC May 13, 2008 PS1 Proposal No. 757-8-033 Page 2 of 4 The following services will be provided in order to achieve the preceding objectives: Review readily available published geologic and topographic information. This published information will be obtained from the appropriate quadrangle map published by the United States Geological Survey (USGS) and the "Soil Survey of Seminole County, Florida" published by the United States Department of Agriculture (USDA) Soil Conservation Service (SCS). 2. As requested, PSI will execute a program of subsurface sampling and field testing. We will perform ten (10) auger borings within the proposed improvement areas to depths of 7 feet. We will also perform six. (6) pavement cores throughout the existing Wade Street pavement. Visually classify and stratify representative soil samples in the laboratory using the AASHTO classification system. Conduct a limited laboratory testing program to aid in classification of soils.ldenrify soil conditions at each boring location and form an opinion of the site soil stratigraphy. 4. Collect groundwater level measurements and estimate normal wet seasonal high groundwater levels. The results of the field exploration and laboratory tests will be used in the engineering analysis and in the formulation of our preliminary geotechnical recommendations. The results of the subsurface exploration, including the preliminary recommendations and the data on which they are based, will be presented in a written report. Schedule We are in a position to start work on the assignment immediately upon receipt of authorization to proceed. The first task will be to complete a utility clearance of the site through Call Sunshine. The fieldwork, laboratory services and report preparation will take on the order of 2 to 3 weeks to complete. PSI can provide verbal results of our findings and analyses performed as it is completed prior to the issuance of our reports. Service Fee It is proposed the fee for performance of the above-outlined servces be determined on a unit price basis, in accordance with our attached Schedule of Services and Fees, and the work be performed pursuant to our General Conditions. Copies of our Schedule of Services and Fees and General Conditions are enclosed herewith and incorporated by reference into this proposal. On the basis of the estimated quantities and the Schedule of Services and Fees, it is estimated the fees will be 52,200.00. P~ Pegasus Engineering, LLC May 13, 24Q8 PSI Proposal No. 757-8-033 Page 3 of 4 We appreciate the opportunity to offer our services to your project and look forward to working with you. If this proposal is acceptable, please sign below as notice to proceed and return one (I) copy of this proposal intact to our office. Should you have any questions in regard to this proposal, please do not hesitate to contact this office. Sincerely, PROFESSIONAL SERVICE INDUSTRIES, INC. ,,~. -~ ~em ~ , Mustap a A. Abboud, P.E. Project Engineer Senio roject Engineer JAS/MAA:cm JS1757-$-033 Rev(Wade St - SR 414 to Oviedo Rd).pm Attachments • Schedule of Services and Fees • General Conditions s 6 AGREED TO THIS BY (Please Print):_ TITLE: COMPANY: SIGNATURE: ~~ DAY OF , _____ _. Pegasus Engineering, LLC May 13, 2008 PSI Proposal No. 757-8-033 Page 4 of 4 SCHEDULE OF SERVICES AND FEES Geotechnica! Engineering Services Proposed Roadway Improvements Wade Street from S.R 419 to Old Sanford Oviedo Road Seminole County, Florida Unit Total Description uantit Unit Rate Cost I. FIELD INVESTIGATION Roadway Auger Borings (10 to 7 A i ' feet) 70 L.F. $ 8.50 $ 595.00 B. Pavement Cores 6 Per 100.00 600.00 Core B. Utility GoordinationBoring Layout 2 Hours 45.00 90.00 Subtotal Field Investigation $ 1,285.00 II. LABORATORY TESTING A. Allowance for Visual Classification 1 Lump $ 150.00 $ 150.00 and Select Laboratory Testing Sum Subtotal Laboratory Testing $ 150.00 III. ENGINEERING SERVICES A. Senior Project Engineer I Hours $ 115.00 $ 115.00 B. Project Engineer 6 Hours 85.00 510.00 G CAD Drafting 2 Hours 50.00 100.00 D. Clerical 1 Hours 40.00 40.00 Subtotal Engineering Services $ 765.00 TOTAL ALL SERVICES $2,200.00 ~~~