Loading...
HomeMy WebLinkAbout2008 05 27 Regular 600 Conceptual Development Plan for Retail and Office DevelopmentCOMMISSION AGENDA ITEM 600 May 27, 2008 Special Meeting Consent Information Public Hearin Re ular X MGR. /De t. REQUEST: The Community Development Department requests the Commission consider a conceptual development plan fora 60,104 SF retail and office development on 7.29 acres, located on the north side of SR 434, at the northwest corner of its intersection with Fountaintree Drive, immediately adjacent to and west of Harbor Winds. PURPOSE: The purpose of this Agenda Item is for the Commission to consider a conceptual development plan for a retail and office development. ZONING & LAND USE DESIGNATION: Zoning: C-1 with SR 434 Redevelopment Overlay Zoning District FLU Designation: Commercial w. partial Conservation Overlay APPLICABLE REGULATIONS: Comprehensive Plan Chapter 5, City Code Chapter 9, City Code. SR 434 Redevelopment Overlay Zoning District CONSIDERATIONS: Overview The7.29 acre site, located at the northwest corner of SR 434 and Fountaintree Drive, contains a portion of Lake Talmo. The site is within the C-1 zoning district, has a Commercial Future Land Use designation, and lies within the SR 434 Redevelopment Overlay Zoning District. The site contains a portion of the Fountaintree Drive roadway into The Park at Laurel Oaks (formerly Golf Terrace Apartments). The applicant proposes to build three (3) buildings (4,760 SF single story retail; 8,924 SF single story retail; and 46,420 SF 2-story building with 23,210 SF of office over 1St floor retail - 23,210 SF "footprint"), a LYNX transit stop, and 200 parking spaces. The applicant would like to include the May 27, 2008 Regular Item 600 Page 2 of 3 possibility of a restaurant, although no daytime "sit-down" restaurant would be allowed -due to parking constraints. No wetland encroachment is proposed. An existing structure (dumpster) located within the 50' lakefront buffer will be removed. Additional considerations are as follows: • Staff received a letter dated May 9, 2008 from VHB, Inc., a local engineering and planning firm representing The Park at Laurel Oaks Apartments. VHB identified several site development related issues between Lakeside Plaza and The Park at Laurel Oaks. Staff has reviewed these issues and believes that they can be worked out through the final engineering and permitting process. • A portion of the parking area encroaches into the 100-year floodplain. The final grading plan will need to be designed such that there is no net loss of floodplain storage. If any fill below the 100-year flood elevation is proposed, compensating storage must be provided onsite within the same drainage sub-basin. • Stormwater runoff from the existing undeveloped site drains into Lake Talmo. When the site develops, stormwater runoff will be collected and treated onsite in accordance with the applicable regulations prior to discharge into Lake Talmo. The post-development stormwater discharge rate cannot exceed the pre-development discharge rate for the 25- year, 24-hour design storm per City Code. A stormwater report is required as a part of the final engineering plans, including a tailwater analysis that evaluates the ability of offsite downstream facilities to handle stormwater discharges from the project. • The intersection configuration at the site entrance driveway connection to Fountaintree Drive is shown in conceptual form and will need to be analyzed in further detail as a part of the final engineering process. One factor that will need to be considered in this intersection design is the potential cross-access connection to Harbor Winds to the east. Lakeside Plaza is required to provide across-access easement to Harbor Winds, and a cross-access easement exists on the Harbor Winds property at this location. However, it is unclear at this time whether Harbor Winds, a gated townhome community, desires to construct their portion of the improvements necessary to complete across-access connection. Having across-access connection between Harbor Winds and Fountaintree Drive is beneficial because it would provide Harbor Winds residents access to a permanent signalized intersection at S.R. 434. The existing traffic signal at the Harbor Winds main entrance is temporary and is scheduled to be removed upon completion of the Winter Park Drive project by the City of Casselberry. • A traffic study is required with the final engineering submittal. The traffic study will need to address the traffic impacts from the proposed project plus the impacts of a potential cross-access connection with Harbor Winds to the east. 2 May 27, 2008 Regular Item 600 Page 3 of 3 Inconsistencies with Re ulations: This is not an exhaustive list. Other issues are likely to arise when the en~ineerin~ plans are submitted and reviewed. 1. Section 20-483 (d) allows up to 25 percent of the parking spaces to be 9' wide, instead of 10'. The applicant proposes 65 of the 200 spaces to be 9' wide (33%). Staff supports this increase in 9' wide spaces. 2. Future Land Use Element Policy 1.2.11 requires a 50' upland buffer around the lake. The plan depicts an elevated cantilevered sidewalk extending over a small portion of this buffer. Staff s interpretation of the upland buffer policy is that this minimal encroachment is acceptable because this is a cantilevered deck area and there is no ground level construction or disturbance of the buffer area. The buffer area would need to be placed in a conservation easement that limits the encroachment to that shown on the concept plan. FINDINGS: 1. The proposed development is located within the C-1 zoning district, has a Commercial FLU designation, and lies within the SR 434 Redevelopment Overlay Zoning District. 2. The attached development concept plan appears consistent with the Comprehensive Plan, with the one lakefront buffer issue, but requires at least one deviation from the City Code. 3. Any deviations from the Code must be addressed through a development agreement, special exception, or some other mechanism deemed appropriate by the City Attorney. RECOMMENDATION: Staff recommends the City Commission approve the attached concept plan. ATTACHMENTS: A -May 9, 20081etter from VHB B -Concept plan COMMISSION ACTION: 3 ATTACHMENT A Transportation Land Development Environmental • Services • imagmstion I ~nnovatron I energy Creating results roi out diems and benefits for out communities May 9, 2008 _Yanasse HangPn Br7~ctl~n I. n~,`._'', Ref: 61326 Randy Stevenson Planning Director City of Winter Springs City Hall 1126 East State Road 434 Winter Springs, F132708 Re: Lakeside Plaza Dear Mr Stevenson, We represent the Park at Laurel Oaks apartment community in regards to the proposed commercial center on the adjacent parcel at the comer of SR 4.34 and Fountainhead Boulevard. After reviewing the application and interviewing the applicant, we have serious reservations about specific aspects of the application These concerns are listed below: I. There is a signed agreement between Laurel Oaks apartments and the former owner of the commercial parcel.. It specifically sets out the rights for the apartment community to retain sign rights on the west side of the common access drive, The sign is not shown on the application . 2, The applicant has been required to install a le$ hun lane at the median opening on the common entry road.. According to the application, this turn lane will eliminate the existing electrozzic equipment used by guests to the apartment community to enter the gates to the community There are no details to replace this existing security feature, 3, the common entry drive is well landscaped with very mature trees and shrubs.. The application documents the landscaping on the west side of the entry drive will be removed with no details as to replacement. 4 A wall is proposed on the south property line of our• parcel and the north line of the applicant's parcel.. There are no details as to the specifics of the wall design or if'ther•e is any landscaping proposed to buffer the wall . 5.. The applicant is requited to connect to a driveway stub out on the east side of'the entry drive. Ihis existing drive way stub is not aligned with the existing driveway median opening the misalignment cz•eates an unsafe situation for drivers entering the driveway from the east desiring to travel south to the signalized intersection with SR 434 Ihis movement will require a significant weave movement and U turn all within a very short distance. Ihis is an unsafe situation for both drivers and pedestrians.. This especially true in the peak hour with Landmark Center Two 225 E Robinson Street, Suite 300 Orlando, Florida 32801 407:839.4006 ^ FAX 407.839.4008 P:\61326.00\Correspondence\citycow~dl letterdoc email• infoC4vhb.com www vhb com Randy Stevenson Project No.: 61326 May 9, 2008 Page 2 the substantial number of existing residences now being increased by patrons to the commercial center, the proposed office workers leaving for home and the residents of the Morison Homes project to the east. We would request a review of the applicant's traffic study to determine if' the stacking and twining movements on the entry drive are within acceptable standards. 6., the applicant is proposing to drain storm water into Lake Talmo. Ihis lake is directly connected to the Laurel Oaks storm water system.. the Laurel Oaks storm water system experiences peak volumes multiple times during the year even with our constant monitoring and improving of the storm water system.. Any additional loading of storm water volumes into the Laurel Oaks storm water management system will, undoubtedly, lead to mote peak volume occurrences and/or occurrences of the system failing leading to flooding in the Park at Laurel Oaks apartment community, the golf couzse and the adjacent community, 7. The applicant is proposing underground storm watez management storage. This is a concern in the long sun due to the maintenance of'this type of'system, It is common for these systems to fill with silt and sediment oven the years. In the long team, more and move volume of storm water will be dischaa~ged down stream without the proper retention rime Ihis exacerbates an aheady delicate storm water balance on the Pazk at Laurel Oaks site We would request a review of'the storm water calculations for the application to bettez undezstand the storm water dynamics Foz these reasons, we believe the applicant has not provided sufficient details to allow a positive consideration of their application.. the safety concezns, development tight infringements and aesthetic considerations significantly affect the lives of the approximately 1,500 people who live in the Laurel Oaks apartment community, We would appreciate youz careful consideration of these facts before allowing the applicant to proceed in the development approval process Sincerely, C. .Jim H ll Director of Planning Vllll P:\616.00\Correeponden~e\ctty coundl letter.doc Lakeside Plaza Retail Plaza Metro Group Lakeside Plaza Retail Plaza Lakeside Plaza Retail Plaza Date: May 27, 2008. The following document was distributed during Regular Agenda Item "600" during the May 27, 2008 City Commission Special Meeting. May 21, 2 TAWILL ENGINEERING, INC. CIVIL ENGINEERING DESIGN • CONSULTING • PERMITTING Randy Stevenson, Planning Director City of Winter Springs 1126 East S.R. 434 Winter Springs, Florida 32708 RE : Lakeside Plaza Dear Mr. Stevenson, t~QY 2 3 ~e;38 CITY pF WFN7ER SIyftIPvCS C~enw-unity ~V.lopn::nt In behalf of my client, MTH Development, LLC we are in receipt of the letter written by Vanasse Hangen Brustlin, Inc. dated May 9, 2008 in regard to the above project and we offer the following response numbered same as in the letter 1. The sign is located on my client property without any easement or ageement. We have discussed this in our meeting with them on April 30, 2008. 2. There aze no existing gates to their community that are visible. 3. Details of any replaced trees and shrubs will be shown on final engineering plans for my client's property. 4. Details of any walls will be shown on final engineering plans as required by City of Winter Springs. The proposed curb-cut to the east will align with the existing recorded access of Morrison Homes project. 6. Our stormwater design is based on a pre/post design, which means no post- development rate of dischazge will exceed the pre-development rate of dischazge and hence no additional dischazge into Lake Talmo. 7. The proposed underground stormwater management system will be properly maintained and checked periodically to meet all governmental requirements. Please note that our current application is for conceptual approval and is not meant for construction or final approvals. If you have any questions in regard to this response, ylease do not hesitate to contact me or Michael Hilal of MTH Development, LLC. Sincerely, . ~,:~ Farid J. awill, P.E Tawill Engineering, Inc. 8606 BAY SHORE COVE • ORLANDO, FLORIDA 32836 • TELEPHONE 407-903-9219 • FAX 407-903-9279 L.._. t- May 21, 2008 Mark Lippmann, Director The Praedium Group, LLC 825 Third Ave., 36th Floor New York, N.Y. TAWILL ENGINEERING, INC. CIVIL ENGINEERING DESIGN • CONSULTING • PERMITTING RE: Golf Terrace Ltd. /Park at Laurel Oaks Changes to the cross-access easement Seminole County O.R. B 6781, P 1497-1506 Winter Springs, Florida Dear Mr. Lippmann, In behalf of my client, MTH Development, LLC ,this letter serves as the required notification set forth in the amended easement agreement in Seminole County Official Records Book 6781, P 1497-1506in order to make alterations with respect to ingress/egress within the cross access easement. On April 30`h, we supplied to you and to your planner Mr. Jim Hall of Vanasse Hangen Brustlin, Inc. with electronic copies of our intended changes to the center aisle. We intend to reshape the northern end of the center aisle so as to include a left turn lane to provide access to our property as mandated by the City of Winter Springs. Sincerely, Farid J. ~awill, P.E. President Tawill Engineering, Inc. CC :Michael Hilal /MTH Development, LLC ,/Randy Stevenson /City of Winter Springs Jim Hall / VHB, Inc. 8606 BAY SHORE COVE • ORLANDO, FLORIDA 32836 • TELEPHONE 407-903-9219 • FAX 407-903-9279