Loading...
HomeMy WebLinkAbout2009 11 09 Consent 201 Authorization For Emergency Repairs To Sanitary Sewer System COMMISSION AGENDA CONSENT X INFORMATIONAL ITEM 201 PUBLIC HEARING REGULAR November 9, 2009 MGR /DEPT li`` Meeting Authorization REQUEST: Utility Department Requesting Authorization for Emergency Repairs to the Sanitary Sewer System PURPOSE: The purpose of this Board item is to request authorization for the construction of emergency repairs to the sanitary sewer system on Sheoah Boulevard with Blue Ox Land Services Inc. of Longwood at a cost of $65,539.14. CONSIDERATIONS: This approval is needed to authorize emergency repairs to a gravity sewer line and a manhole that is settling on Sheoah Boulevard. This gravity sewer main and manhole are adjacent to lift station #3W which serves a large portion of the southern Highlands area. The scope of work includes manhole replacement, gravity sewer replacement, sewer force main replacement, bypass pumping, dewatering, temporary modifications to Sheoah Boulevard for maintenance of traffic, stormwater inlet replacement, and full restoration when complete. The scope of work was provided to 6 vendors and 5 submitted pricing as follows; Blue Ox Lands Services $65,214.80 Wal -Rose Inc. $67,691.04 Cathcart Construction Company $77,900.00 Central Florida Environmental $79,655.00 Prime Construction Group $149,100.00 November 9, 2009 Consent Agenda Item 201 Page 2 FUNDING: The funding source for this expense is the Sewer Relining line code in the Renewal and Replacement line code of the Utility Enterprise Fund (3610- 65000- 30030). The funds will be days. expended over the next 60 da p Y RECOMMENDATION: It is recommended that authorization be given for the City Manager and City Attorney to prepare and execute any and all documents needed for the construction of emergency repairs to the sanitary sewer system on Sheoah Boulevard with Blue Ox Land Services Inc. of Longwood at a cost of $65,539.14 payable from the Sewer Relining line code in the Utility Enterprise Renewal and Replacement Fund (3610- 65000- 30030). IMPLEMENTATION SCHEDULE: The sewer line will be repaired within the next 60 days. Notification will be provide to the Highlands HOA. ATTACHMENTS: 1. Repair area photo COMMISSION ACTION: sit ;If iv fr 1 1. 4 t 0 .4 1 44 it ,*.J.ii. r e 0 r:95.1 1 c o 114 VOA f„, 4 4 4.4 e, It ir r to °V4' w .4,4, 44 -it a i MAW .4 1 itO,f,`' -,i 0. MI' Otto 4 .\\N ,ill I AI it i 1 1 if 114011.1", .14 f i 4