Loading...
HomeMy WebLinkAbout2009 10 26 Consent 204 Authorization To Enter Into Agreement With P&S Paving, Incorporated (ITB #014-09-BF) State Road 434 And Hayes RoadCOMMISSION AGENDA ITEM 204 October 26, 2009 Meeting CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR MGR /DEPT ~~~/" Authorization REQUEST: Public Works Department requesting authorization to enter into a contractual agreement with P&S Paving, Inc. for construction of Intersection Improvements at S.R. 434 and Hayes Road (ITB #014-09-B~ PURPOSE: The purpose of this agenda item is to request authorization to enter into a contractual agreement with P&S Paving, Inc. for construction of Intersection Improvements at S.R. 434 and Hayes Road (ITB #014-09-BF) in the amount of $141,998 plus 10% contingency. CONSIDERATIONS: • The project consists of construction of a right-turn deceleration lane on S.R. 434 eastbound at Hayes Road. This project has been warranted and planned for several years and will provide necessary safety and operational improvements at the S.R. 434 / Hayes Road intersection. • The Hayes Road turn lane was initially planned to be funded from the Transportation Impact Fee Fund; however, with the slow pace of new development the Transportation Impact Fee Fund has not had sufficient revenues to fund the project. • In Apri12009, the City received approval of federal Stimulus Plan funding in the amount of $125,000 for construction of the Hayes Road turn lane. • The project was advertised for bidding in accordance with the applicable City and FDOT procedures. Bids were received and opened on October 8, 2009 with the results as follows: October 26, 2009 Agenda Item #204 Page 2 of 3 Invitation to Bid #014-09-BF Rid Results Contractor Bid Price P&S Pavin $141,998.00 APEC, Inc. $145,483.25 Emerald Utilities and Site Dev., Inc. $155,385.20 Hubbard Construction $158,534.25 Ran er Construction Industries, Inc. $174,927.00 Cathcart Contractin Co. $194,005.00 • Staff has reviewed the bids and recommends that the bid be awarded to the lowest responsive bidder, P&S Paving, Inc. PROJECT COST SUMMARY: The project is approved for federal funding of up to $125,000 by the 2009 American Recovery and Reinvestment Act (ARRA). The federal funds can be utilized for construction and the necessary construction engineering and inspection (CEI) services, but not for design services or land acquisition. A contract for CEI services was awarded to URS Construction Services, Inc. at the July 27, 2009 City Commission meeting. The project costs and funding sources are summarized as follows: S.R 434 at Hayes Road Project Cost Summary Item Total Cost Federal Fundin Ci Fundin Construction $141,998.00 $125,000.00 $16,998.00 Construction Engineering and Ins ection $21,035.72 $0.00 $21,035.72 Desi (com lete) $22,647.60 $0.00 $22,647.07 Right-of--Way Acquisition (com lete) $44,688.7$ $0.00 $44,688.75 (Transportation Impact Fee Credits) Total $230,370.07 $125 000.00 $105,370.07 October 26, 2009 Agenda Item #204 Page 3 of 3 FUNDING: The construction cost is $141,998.00 plus 10% contingency. Of this amount, $125,000 will be federally funded from the 2009 American Recovery and Reinvestment Act. The remainder of the construction cost, $16,998 plus the 10% contingency, will be City-funded from the Road Improvement Fund (#115-65000-30085). The federal funding is a reimbursement to the City, and funds will be fronted from the Road Improvement Fund (#115-65000-30085). Sufficient funds are available in the Road Improvement Fund to front the federally reimbursable portion of construction and to fund the City's cost share. Staff intends to pursue federal reimbursement for the City's share of both the construction cost ($16,998 plus the 10% contingency) and the construction engineering and inspection cost ($21,035.72) byrequesting a re-allocation of unspent federal grant funds from the S.R. 419 at Wade Street project, which had construction bids come in at more than $100,000 under the available federal cost share. RECOMMENDATION: Staff recommends that the City Commission approve P&S Paving, Inc. for construction of Intersection Improvements at S.R. 434 and Hayes Road (ITB #014-09-BF) in the amount of $141,998 plus 10% contingency funded from 115-6500-30085 and authorize the City Manager and City Attorney to prepare and execute any and all applicable documents. ATTACHMENTS: 1. Bid Tabulation for ITB#014-09-BF COMMISSION ACTION: CITY OF WINTER SPRINGS, FL 1126 EAST STATE ROAD 434 WINTER SPRINGS, FL 32708 407-327-1800 ITB/014/09/BF Intersection Improvements at SR 434 and Hayes Road Called By: Nancy Vobornik-Purchasing Coordinator ITB Opened: 2:00 PM ITB Closed : 2:26 PM Date: October 8, 2009 Witness: Brian Fields, Engineer Ken Hutchings, Engineering Tech/Construction Inspector Hubbard Construction Company PO Box 547217 Orlando, FL 32854-7217 Base Bid: $ 158,534.25 APEC Inc 4436 Old Winter Garden Road Orlando, FL 32811 Base Bid: $ 145,483.25 Cathcart Contracting Company 1056 Willa Springs Dr Winter Springs, FL 32708 Base Bid: $ 194,005.00 Emerald Utilities and Site Development Inc 1601 Park Center Drive Suite 6B Orlando, Fl 32835 Base Bid: $ 155,385.20 P & S Paving 3701 Olson Dr Daytona Beach, FL 32124 Base Bid: $ 141,998.00 Page Two Ranger Construction Industries, Inc 1200 Elboc Way Winter Garden, FL 34787 Base Bid: $ 174,927.00