Loading...
HomeMy WebLinkAbout2009 10 26 Consent 203 Authorization To Enter Into Agreement With Ranger Construction Industries (ITB #016-09-BF) State Road 419 And Sherry AvenueCOMMISSION AGENDA ITEM 203 October 26, 2009 Meeting CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR MGR /DEPT ~~~ Authorization REQUEST: Public Works Department requesting authorization to enter into a contractual agreement with Ranger Construction Industries, Inc. for construction of Intersection Improvements at S.R. 419 and Sherry Avenue (ITB #016-09-BFI PURPOSE: The purpose of this agenda item is to request authorization to enter into a contractual agreement with Ranger Construction Industries, Inc. for construction of Intersection Improvements at S.R. 419 and Sherry Avenue (ITB #016-09-BF) in the amount of $64,301.00 plus 10% contingency. PROJECT BACKGROUND: • At the October 27, 2008 City Commission meeting, the Commission provided authorization to enter into a Joint Participation Agreement (JPA) with the Florida Department of Transportation to install turn lanes along State Road 419 at Wade Street and Sherry Avenue. The JPA had an FDOT contribution of $368,000 for construction of the following improvements: 1. Addition of an eastbound and westbound left-turn deceleration lanes from S.R. 419 onto Wade Street 2. Addition of a right-turn deceleration lane on S.R. 419 eastbound onto Sherry Avenue • In April 2009, the left-turn deceleration lanes from S.R. 419 onto Wade Street were approved for federal funding under the 2009 American Recovery and Reinvestment Act (ARRA). The right-turn deceleration lane from S.R. 419 eastbound onto Sherry Avenue remained astate-funded project under the JPA. An amendment to the JPA was approved by the City Commission at the June 8, 2009 City Commission meeting reducing the scope to consist of only the Sherry Avenue turn lane and reducing the state contribution to $120,000. October 26, 2009 Agenda Item #203 Page 2 of 3 CONSIDERATIONS: • The Sherry Avenue turn lane will provide necessary safety and operational improvements at the S.R. 434 /Sherry Avenue intersection. • The project was advertised for bidding in accordance with the applicable City and FDOT procedures. Bids were received and opened on October 8, 2009 with the results as follows: Invitation to Bid #016-09-BF Bid Results Contractor Bid Price Ran er Construction Industries, Inc. $64,301.00 P&S Pavin $81,961.12 APEC, Inc. $100,950.50 Wal-Rose, Inc. $110,924.90 Emerald Utilities and Site Dev., Inc. $123,890.15 Hubbard Construction $128,201.50 • Staff has reviewed the bids and recommends that the bid be awarded to the lowest responsive bidder, Ranger Construction Industries, Inc. PROJECT COST SUMMARY: The project is approved for state funding of up to $120,000. The state funds can be utilized for construction and the necessary construction engineering and inspection (CEI) services, but not for design services. A contract for CEI services was awarded to URS Construction Services, Inc. at the July 27, 2009 City Commission meeting. The project costs and funding sources are summarized as follows: October 26, 2009 Agenda Item #203 Page 3 of 3 S.R 419 at Sherry Avenue Project Cost Summary Item Total Cost State Fundin Ci Fundin Construction $64,301.00 $64,301.00 $0.00 Construction Engineering and Ins ection $20,695.72 $20,695.72 $0.00 Desi (com lete) $17,797.50 $0.00 $17,797.50 Ri ht-of-Wa Ac uisition N/A N/A N/A Total $102,794.22 $84,996.72 $17,797.50 FUNDING: The construction cost in the amount of $64,301.00 plus 10% contingency will be state funded through the City's Joint Participation Agreement (JPA) with the Florida Department of Transportation for construction of the Sherry Avenue turn lane. The state funding is a reimbursement to the City, and funds will be fronted from the Road Improvement Fund (#115- 65000-30146). Sufficient funds are available in the Road Improvement Fund to front the cost of construction. RECOMMENDATION: Staff recommends that the City Commission approve Ranger Construction Industries, Inc. for construction of Intersection Improvements at S.R. 419 and Sherry Avenue (ITB #016-09- BF) in the amount of $64,301.00 plus 10% contingency funded from 115-65000-30146 and authorize the City Manager and City Attorney to prepare and execute any and all applicable documents. ATTACHMENTS: 1. Bid Tabulation for ITB#016-09-BF COMMISSION ACTION: CITY OF WINTER SPRINGS, FL 1126 EAST STATE ROAD 434 WINTER SPRINGS, FL 32708 407-327-1800 TTB/016/09/BF Intersection Improvements at SR 419 and Sherry Aveuue Called By: Nancy Vobomik-Purchasing Coordinator ITB Opened: 2:00 PM ITB Closed : 2:26 PM Date: October 8, 2009 Witness: Brian Fields, Engineer Ken Hutchings, Engineering Tech/Construction Inspector Ranger Construction Industries, Inc 1200 Elboc Way Winter Garden, FL 34787 Base Bid: $ 64,301.00 P & S Paving Inc 3701 Olson Drive Daytona Beach, FL 32124 Base Bid: $ 81,961.12 Emerald Utilities and Site Development Inc 1601 Park Center Drive Suite 6B Orlando, FL 32835 Base Bid: $ 123,890.15 Wal-Rose Inc PO Box 728 Sanford, FI 32772 Base Bid: $ 110,924.90 APEC, Inc 4436 Old Winter Garden Road Orlando, FL 32811 Base Bid: $ 100,950.50 Page Two Hubbard Construction Company PO Box 547217 Orlando, FL 32854 Base Bid: $ 128,201.50