Loading...
HomeMy WebLinkAbout1986 02 10 Regular / ["',,.',.'1;' I',', , " Lb' -~''''r--~ " ~ 'I; Conklin, ~ort.r and Holm.. ~ ~ ENGINEERS. INC. a soo w, FUlTON STREET POST OFFICE 90lt 1976 SANFORD. FLORIDA 32771 TEL 30S 322-6841 TEL 305 831.5717 - ) CITY MANAGER ~J: ~ I\1/tl lWty~ C-\T"'[ ~ ~ ~ ~JA.. 2 It /J/'(, (C --- January 27, 1986 CITY G1 ~;! : ~'.~',~ ~:F\;U~iGS Mr. Richard Rozansky City Manager City of Winter Springs 1126 East State Road 434 Winter Springs, FL 32708 RE: Radial Partition Wall Bid CPH Job No. 6136.05 Dear Mr. Rozansky: On Friday, January 24, 1986, we received two (2) bids for the repair of the radial partition wall at the wastewater treatment plant facility for the City of Winter Springs. Those present at the bid opening included the author, Mayor Torcaso, and City Clerk Mary Norton. Also present was a representative from C.E.M. Enterprises and W.E.D. Contractors, Inc. We received copies of the bid for our evaluation and comment from the City of Winter Springs. We found the bids to be in order and no mathematical errors within the bids. Also, both contractors have supplied an adequate bid bond with their submittals. The apparent low bidder was C.E.M. Enterprises in the amount of $39,257.00. The other bidder was W.E.D. Contractors, Inc. with a bid of $63,800.00. The City, at their option, may delete items 6 and 7 of the contract bid which leaves a low bid of $32,047.00 by C.E.M. Enterprises, and the second bid of $52,300.00 by W.E.D. Contractors. We cannot recommend approval of either bid at this time, as the bids exceeded the budgeted dollar value within the water and sewer budget for the repair of this wall. In 1985, we received a preliminary quote from a contractor from the City of Tampa, who elected not to bid on this contract. His proposal at that time totalled approximately $14,000.00. Therefore, the budget value for the current fiscal year was placed at $18,000.00 and we felt comfortable that that would cover the necessary construction expenses. We believe that both the contractors who bid on this project were unfamiliar witn this type of repair or the circumstances that exist at the Winter Springs wastewater treatment plant, and therefore, they bid higher to cover any unforeseen contingencies. We need to meet with Doug Taylor of the Utility Dept. and you to discuss possible alternatives to a full repair, or the possibility of delaying the project until such time as we can budget additional funds for this repair. Conklin, ~port.r IIncI Holme. @ [p) ENGINEERS, INC. ~ W, FUl. TON STREET POST OFFICE BOX 117. SANFORD. FLOflI)A 32771 TEL306322-1141 TEL 305 13l-5717 1/27/86 Mr. Richard Rozansky City Manager, City of Winter Springs Page 2 If you have any questions, please do not hesitate to call our office. Sincerely, CONKLIN. PORTER & HOLMES-ENGINEERS, INC. ~~ Terry M. Zaudtke, P. E. TMZ:pat 1/27 L3P