Loading...
HomeMy WebLinkAbout2009 09 14 Regular 600 Banner Installations; Provide Direction for Phase II of City's Pole Banner ProgramCOMMISSION AGENDA INFORMATIONAL ITEM 6 O O PUBLIC HEARING REGULAR X September 14, 2009 MGR \AJ~ /DEPT Meeting -A~uth-orization REQUEST: Community Development Department, Urban Beautification Services Division, is requesting the Commission consider additional banner installations and provide direction for Phase II of the City's Pole Banner Program. PURPOSE: This agenda item is needed for the Commission to review the Pole Banner Program and provide direction for future installations including banners for upcoming events in the Winter Springs Town Center and those locations identified by the Commission as `Phase II' during their July 27, 2009 Regular Meeting and discussed as part of the original consideration of the Banner Program during their April 13, 2009 meeting. CONSIDERATIONS: On April 13, 2009, at a regular Commission Meeting, under Agenda Item 603, the City Commission agreed to fund a Pole Banner Program selecting the proposed Option `A'. This option provided for the installation of pole banners at thirteen (13) signalized intersections using twenty-six (26) double banners, located on two out of four poles at each intersection along State Road 434, Tuskawilla Road and State Road 419. The Commission committed to revisiting the issue in 180 days to determine if additional banners would be necessary. On July 27, 2009, at a regular Commission Meeting, under Reports 403 and 404, requests were made for the Pole Banner Program to be revisited prior to the original 180 day timeframe in order to discuss additional installations as part of Phase II and the upcoming Winter Springs Festival of the Arts Event in October 2009. Based on input from the City Commission, Staff, and potential Sponsors, the following options are recommended for consideration at this time: Phase II Options 1) Complete banner installations at the thirteen (13) signalized intersections on remaining poles, where applicable; totaling twenty-four (24) additional double banners (30"x60"). Installation would be for the same 'Celebrating 50 Years' banners that are currently in use or a design approved by the City. This option includes banners, brackets, and installation at a total cost of $11,100. 2) Install only banner brackets at the thirteen (13) signalized intersections on remaining poles, where applicable; a total of forty-eight (48) additional bracket mounts (30"x60" banner ready). This would allow for sponsor(s) to install banners as needed and approved by the City at these locations. The cost includes brackets and installation at $7,500. 3) Complete banner installations at thirty-four (34) street light poles (18"x36" single banners) along State Road 434 Village Walk. The cost includes banners, brackets and installation at $6,000. 4) Complete banner installations at thirty-four (34) street light poles (18"x36" single banners) along Tuskawilla Road, Blumberg Blvd., and Doran Drive, in the Winter Springs Town Center. The cost includes banners, brackets and installation at $6,000. 5) Options 1,3, and 4 at a cost of $23,100. 6) Options 2,3 and 4 at a cost of $19,500. 7) Take other action as the City Commission deems appropriate. Staff will be working with the Beautification of Winter Springs Advisory Board and our local schools in Winter Springs on a design contest, crafted to solicit community input on future banner designs for the City. Additionally, sponsors such as the Oviedo Winter Springs Regional Chamber of Commerce have shown an interest in future advertisement opportunities utilizing the City's Pole Banner Program in strategic locations. FUNDING: If the Commission wishes to proceed with any of the options of Phase II of the Pole Banner Program, a funding source would need to be identified based upon costs related to the quantity, locations and specifications of the option(s) selected. RECOMMENDATION: It is recommended that the City Commission review the information provided in this board item and select the most appropriate option(s) as detailed above. IMPLEMENTATION SCHEDULE: The project would be implemented immediately upon Commission approval and funding becoming available; banners and hardware could be installed within 40 to 60 days. ATTACHMENTS: A. Current Banner Locations -Phase I COMMISSION ACTION: 2 Attachment `A' Current Banner Locations -Phase I 30"x60" Double Banners Installed as of 7/09 Poles Banners Location Available Space Banners 4 2 State Road 434 and Vistawilla Drive 2 2 2 State Road 434 and Tuskawilla Road 0 4 2 State Road 434 and Doran Drive 2 4 2 State Road 434 and Central Winds Blvd. 2 4 2 State Road 434 and Parkstone Blvd. 2 4 2 State Road 434 and State Road 419 2 4 2 State Road 434 and Hayes Road 2 4 2 State Road 434 and Moss Road 2 4 2 State Road 434 and Edgemon Ave. 2 4 2 State Road 434 and Sheoah Blvd. 2 4 2 State Road 419 and Edgemon Avenue 2 4 2 Tuskawilla Road and Trotwood Blvd. 2 4 2 Tuskawilla Road and Winter Sprin sg Blvd. 2 50 26 24 Current Banner Configuration (individual banners) 44 -City of Winter Springs (Celebrating SO Years) 8 -Farmer's Market `Double Banners' consist of two individual banners and four brackets mounted in an `L' configuration on one light pole. 3