Loading...
HomeMy WebLinkAbout1985 02 25 Regular --. ':-[~-~\~~)'~;;S:~ .l~ "':'" \~. '.} t . *j .~~ .' .,;' ,4r,~ ~~'..:"~ -\'-'lI..":S-_-c.::<-' e e CITY OF WINTER SPRINGS. FLORIDA 400 NORTH EDGEMON AVENUE WINTER SPRINGS. FLORIDA 32708 Telephone (305) 327-1800 TO: FROM: RE: DATE: Mayor, City Manager and City Commission Ci ty Pl anner { / Moss Road Quads / Moss Glenn February 6, 1985 James Simon of Premier Investment Properties, Inc. of Tampa is requesting approval of his preliminary site plan and engineering for a condominium project now called Moss Glenn. The project is located on the newly paved section of North Moss Road and is approximately 2.02 acres of land. The project is at a density of 12.0 and is in an area presently zoned C-1. A conditional use for R-3 granted by the Board of Adjustment May 17, 1984. Pursuant to Section 14-23 the developer is seeking request for approval of this/project and several concerns have been addressed. The following list of recommendations have been made by the staff and the Planning and Zoning Board for the Commission to consider in review of the project. 1) The DCCR needs to maintain the buildings as quadraplexes not be be sold individually at a later date. 2) The City of Winter Springs should not accept the street the developer has requested to dedicate, due to the design of the sewer and water system. Further, that this road be maintained as a private road and shared as a common easement by the homeowners association in the DCCR. 3) That a new tax appraisal be done to assess the present value of the land with the Moss Road improvements prior to accepting 5% of the value of the total gross acreage. The developer has elected to contribute this amount to the city in lieu of developing a recreation area. 4) That the developer post a bond with the City of Winter Springs for any damage that may be done to Moss Road during construction. e e e ". To: From: Re: Date: Page 2 Mayor, City Manager and City Commission City Planner Moss Road Quads / Moss Glenn February 6, 1985 5) That the developer be assessed for the improvements of the drainage and paving of Moss Road. 6) That the developer also be assessed for his portion of the signalization of Moss Road and SR 434. Other conditions will need to be shown on the final engineering. These were not able to be determined due to construction of Moss Road being completed during the design portion of the preliminary engineering for the project. 1) Stub outs and manhole elevations need to be shown from the now existing right of way of Moss Road. 2) That all invert elevations will need to be redetermined for new sewer lines along Moss Road. 3) That water lines be redesigned to show single lines with double meter boxes for half of each building on site. /db ~ e Board of Adjustment Minutes Thursday, May 17, 1984 7:30P.M. The regular meeting of the Board of Adjustment was called to order by Chairman Holz. ROLL CALL: Ted Holz, Chairman, present Harry Reid, Vice-Chairman, present (late) Louise Poole, present Gil Artman, present Richard Kessler, absent CITY OFF! CIALS : Walter Elwell, City Planner The Pledge of Allegiance to the Flag led by Chairman Holz. APPROVAL OF MINUTES OF FEBRUARY 23, 1984. Poole moved to approve minutes as submitted. Artman second. Vote: All aye. Motion carries. VARIANCE FROM REAR YARD REQUIREMENT, R-l ZONING, LOT 14, BLK. K, FOXMOOR/UNIT TWO, 227 PANAMA ROAD, EDWARD BROWN. Elwell presentation. Edward Brown, applicant, made his presentation. Discussion Artman moved to vote on the variance as requested. Poole second. Vote: All aye. Motion carries. FL, applicant, Ar oved to vote on approval of Conditional Use as indicated. Motion dies for lack of second. Reid moved to approve Conditional Use limiting it to no more than 12 units per acre. Reid withdrew motion. Poole moved to approve the Conditional Use with the stipulation that there will be a maximum permitted density of 12 units per acre. Artman second. Vote: All aye. Motion carries. Meeting adjourned at 8:25 P.M. rp\v.'Y G (L . Respectfully submitted, ~ I '. . ~.''''-'''\.,;.... L.~?L. 1.((.0 ,_' , Pam Lawrenz ~ Recording Secretary ..' - . . , ~. ~~~~I .~ ~'NTEI'I "\-~ ~u~.. is:. ,,-.. ." . \.>..I~. ~ . ~ ,..l. '~':I. ,~ +, . . !/ ~ / ~_ ,~' To. _ ... ( ex:,'-:>,,'- .:t..X.1.."_T'::>:::'-" MEMORANDUM TO: FROM: RE: DATE: 400 NORTH EDGEMON AVENUE WINTER SPRINGS, FLORIDA 32708 Telephone (305) 327-1800 City Manager, Mayor and City Commission City Planner Tuscawilla Unit 14, Final Engineering February 7, 1985 Winter Springs Development Corporation is requesting approval of the final engineering for the first phase of Tuscawilla Unit 14.The preliminary engineering for the project was approved on April 24, 1984 with five provisions. 1) That the developers dedicate the access rights to Mission Road for lots 274 through 283 to the City of Winter Springs. 2) That the plan be phased, with final engineering approval separately for each section. 3) That the undesignated tract fronting Vistawilla Drive be designated greenbelt and retained by the developer. 4) That the developer extend Vistawilla north to SR 419. (This was a major condition of the approval.) 5) That the applicant provide a satisfactory buffer between the single family residential area and the commercial area near the future junction of Winter Springs Blvd and SR 426. On January 31, 1985 Winter Springs Development Corporation presented the final engineering for Tuscawilla Unit 14 (the subsequent phases will be 14 A, B Etc.) for staff review. Presently accomplished are the blazed roads and soil tests. The drainage calculations provided to date are acceptable to the City Engineer. The Fire Chief has reviewed the placement of the fire hydrants and has found this plan acceptable. The Police Chief asked about the corridor for the northern extension of the East-West Expressway. Mr. True, representing the Winter Springs Development Corporation, has stated that this corridor will be between Mission Road and the City of Oviedo. The Police Chief also stated he would inspect for traffic and street signs prior to plating the area. . e . . . . .. . "" Memorandum To: From: Re: Date: Page 2 Mayor, City Manager, and City Commission City Planner Tuscawilla Unit 14, Final Engineering February 7, 1985 An area of concern from the City Engineer was the 3~ ft. cul-de-sac with 2 feet of miami curbing. Neither the Police or Fire Chief had a problem with this. Therefore at this time, staff can recommend acceptance of the final engineering for this phase of Tuscawilla Unit 14. Plat, DCCR's and By Laws will be forth coming with certified as-builts of the project to be accepted at a later date. /db