HomeMy WebLinkAbout2009 04 27 Consent 200 Natural Resources Conservation Service (NRCS) Project Agreement Restoration of Waterways Damaged During Tropical Storm FayCOMMISSION AGENDA
ITEM 200
Apri127, 2009
Meeting
CONSENT X
INFORMATIONAL
PUBLIC HEARING
REGU AR
MGR /DEPT ,~~~~~
uthorization
REQUEST: Public Works Department - Stormwater Division requests approval to
execute Amendment No. 2 to the Project Agreement with the Natural
Resources Conservation Service (MRCS) for the restoration of City
waterways damaged during Tropical Storm Fay
PURPOSE: The purpose of this agenda item is to request approval to execute Amendment No.
2 to the Project Agreement with the Natural Resources Conservation Service
(MRCS) for the restoration of City waterways damaged during Tropical Storm
Fay
CONSIDERATIONS:
• At the January 12, 2009 City Commission meeting, the Commission provided authorization
to enter into a Project Agreement with the Natural Resources Conservation Service
(MRCS) for restoration of City waterways damaged during Tropical Storm Fay. At the
February 9, 2009 City Commission meeting, the Commission approved Amendment #1 to
the Project Agreement, which increased the maximum construction cost to $400,000.
• At the March 23, 2009 City Commission meeting, the Commission provided authorization
to enter into contractual agreements for construction of the project with two contractors
(CFE and ESI) in the total amount of $190,924.17, with a project contingency of up to
$209,075.83. The construction contracts have been awarded and work is expected to be
underway before Apri130, 2009.
• This agenda item requests approval of Amendment #2 to the NRCS Project Agreement,
which decreases the maximum construction cost by $180,000 from $400,000 to a new total
of $220,000. This decrease was requested by NRCS based on the low bid prices and
NRCS's need to re-allocate funds to other projects. Having the maximum construction cost
at $220,000 reduces the project contingency from $209,075.83 to $29,075.83 which should
042709_COMM_Consent 200 NRCS Project_Agreement Amendment 2
Apri127, 2009
Consent Item 200
Page 2 of 2
still be sufficient for this project. NRCS has agreed that they will work with the City to
provide additional funds above the proposed maximum of $220,000 if necessary due to any
unforeseen changes during construction. Amendment #2 also increases the amount of in-
kind technical services (consulting design fees) eligible for federal reimbursement from
7.5% to 12.5% of the actual cost of construction.
PROJECT COSTS AND FUNDING:
After Amendment #2, the total construction cost for the five projects listed above is up to
$220,000. NRCS will fund 75% of the construction cost, or up to $165,000, and the City will be
responsible for the remaining 25%, or up to $55,000. The City portion is funded by the
Stormwater Utility Fund, as previously approved by the City Commission at the March 23, 2009
meeting.
The updated project costs and funding sources are summarized as follows:
Phase
Cost Funding Source
NRCS City
Design $30,000 $27,500 $2,500
Construction $220,000 $165,000 $55,000
Total $250,000 $192,500 $57,500
RECOMMENDATION:
Staff recommends the City Commission authorize the City Manager to execute
Amendment No. 2 to the Project Agreement with Natural Resources Conservation Service for
the restoration of City waterways damaged during Tropical Storm Fay, and decrease the project
contingency from $209,075.83 to $29,075.83.
ATTACHMENTS:
1. Amendment No. 2 to NRCS Project Agreement
COMMISSION ACTION:
AMENDMENT N0.2
To
PROJECT AGREEMENT 69-4209-9-1705
Between
CITY OF WINTER SPRINGS
And The
UNITED STATES DEPARTMENT OF AGRICULTURE
NATURAL RESOURCES CONSERVATION SERVICE
RE: Emergency Watershed Protection project resulting from Tropical Storm Fay.
This amends the Project Agreement 69-4209-9-1705 between the above parties relative to the
Tropical Storm Fay Emergency Watershed Protection Project.
Clause A is amended to decrease the estimated construction cost by $180,000.00 and to read as
follows:
A. It is agreed that the following described works of improvement is to be constructed at an
estimated cost not to exceed $220,000.00
Location Description DSR No.
Bear Creek Stabilize eroded areas to prevent erosion and WS-SEM-OOIFAY
remove debris to prevent flooding.
Gee Creek Stabilize eroded areas to prevent erosion and WS-SEM-002FAY
remove debris to prevent flooding.
Clause B.8 is amended to increase the maximum value of in-kind technical services that will be
reimbursed to the Sponsor from not to exceed 7.5 percent to not to exceed 12.5 percent and to
read as follows:
Provide in-kind technical services (survey the site, design the project, develop engineering
plans and specifications, let and administer contracts, inspect work performed, certify the
completed work, and prepare as-built drawings). The maximum value of in-kind technical
services that will be reimbursed to the Sponsor will not exceed 12.5 percent of the actual
eligible construction cost from contracts for constructing the emergency watershed protection
measures described in Section A and in accordance with Section B.5 and B.6 of this
agreement. Costs for in-kind technical services utilized for Sponsor in-kind construction
services are not eligible for reimbursement.
Clause C.2 is amended to increase the NRCS' reimbursement for the Sponsor in-kind technical
services from not to exceed 7.5 percent to not to exceed 12.5 percent of the actual cost of
constructing the emergency watershed protection measures and to read as follows.
2. Provide the value of the Sponsor in-kind technical services not to exceed 12.5 percent of the
actual eligible construction cost from contracts for constructing the works of improvement
described in Section A and computed as described in B.8.
All other provisions of the Agreement remain unchanged.
REMAINDER OF PAGE IS INTENTIONALLY BLANK
1 of 2
APPROVED:
CITY OF WINTER SPRINGS
By: _
Title:
This Action is authorized at an official meeting of the
on the day of , 2009 at
State of Florida.
Date:
(Signature)
Date:
UNITED STATES DEPARTMENT OF AGRICULTURE
NATURAL RESOURCES CONSERVATION SERVICE
By:
Carlos Suarez
Title: State Conservationist
Date:
Reviewed By:
Lynn Merrill
Title: Contracting Officer
Date:
2 of 2
united 9fates Kle t Of Ayrienle n
o NRCS
Natural Resources Conservation Service
Florida State Office
2614 NW 43rd Street
Gainesville, Fl- 32606
RECEIVED
MAY 12 2009
CITY OF WINTER SPRINGS
OFFICE aI i%gM6WK
FX 352-338-9578
www.tt.nres.usda.gov
May 11, 2009
Brian Field, P.E.
City Engineer
City of Winter Springs
1126 East State Road 434
Winter Springs, Florida 32708-2799
RE: Project Agreement No. 69-4209-9-1705, Amendment No. 2
Dear Mr. Field:
Enclosed is one (1) fully executed original copy of Amendment No. 2 to Project Agreement No.
69-4209-9-1705 between the City of Winter Springs and NRCS relative to the Emergency
Watershed Protection Program.
If you have any questions, please do not hesitate to call me at 352-338-9557.
Sincerely,
Jesse T. Wilson
State Conservation Engineer
Enclosure
cc: Carlos Suarez, State Conservationist, Gainesville, Florida
Bruce Hawkins, ASTC Administration, Gainesville, Florida
Lynn Merrill, Contracting Officer, Gainesville, Florida
Jeff White, Area Conservationist, Palmetto, Florida
David Millard, District Conservationist, Cocoa Beach, Florida w/enclosure
Elwyn Cooper, Project Engineer, Gainesville, Florida w/enclosure
Helping People Help the Land
M Equal OWw ally ProM w and Enq"w
AMENDMENT NO.2
To
PROJECT AGREEMENT 69-4209-9-1705
Between
CITY OF WINTER SPRINGS
And The
UNITED STATES DEPARTMENT OF AGRICULTURE
NATURAL RESOURCES CONSERVATION SERVICE
RE: Emergency Watershed Protection project resulting from Tropical Storm Fay.
This amends the Project Agreement 69-4209-9-1705 between the above parties relative to the
Tropical Storm Fay Emergency Watershed Protection Project.
Clause A is amended to decrease the estimated construction cost by $180,000.00 and to read as
follows:
A. It is agreed that the following described works of improvement is to be constructed at an
estimated cost not to exceed $220,000.00
Location Description DSR No.
Bear Creek Stabilize eroded areas to prevent erosion and WS-SEM-001FAY
remove debris to prevent flooding.
Gee Creek Stabilize eroded areas to prevent erosion and WS-SEM-002FAY
remove debris to prevent flooding.
Clause B.8 is amended to increase the maximum value of in-kind technical services that will be
reimbursed to the Sponsor from not to exceed 7.5 percent to not to exceed 12.5 percent and to
read as follows:
5. Provide in-kind technical services (survey the site, design the project, develop engineering
plans and specifications, let and administer contracts, inspect work performed, certify the
completed work, and prepare as-built drawings). The maximum value of in-kind technical
services that will be reimbursed to the Sponsor will not exceed 12.5 percent of the actual
eligible construction cost from contracts for constructing the emergency watershed protection
measures described in Section A and in accordance with Section B.5 and B.6 of this
agreement. Costs for in-kind technical services utilized for Sponsor in-kind construction
services are not eligible for reimbursement.
Clause C.2 is amended to increase the NRCS' reimbursement for the Sponsor in-kind technical
services from not to exceed 7.5 percent to not to exceed 12.5 percent of the actual cost of
constructing the emergency watershed protection measures and to read as follows.
2. Provide the value of the Sponsor in-kind technical services not to exceed 12.5 percent of the
actual eligible construction cost from contracts for constructing the works of improvement
described in Section A and computed as described in B.B.
All other provisions of the Agreement remain unchanged.
REMAINDER OF PAGE IS INTENTIONALLY BLANK
1 of 2
APPROVED:
CITY OF WINTER SPRINGS
By:
Kevin L. Smith
Title: City Manager Date: 4/30/09
This Action is authorized at an official meeting of the City Commission
on the 27th day of April
2009 at Winter Springs, Florida
State of Florida.
Date: -74 a o/0 ?
(Sign e)
UNITED STATES DEPARTMENT OF AGRICULTURE
NATURAL RESOURCES CONSERVATION
By:
Carlos Suarez
Title: State Conservationist
Date: "8-
SERVICE
r
Reviewed By:
errill
Title: Contracting Off& r
Date: S-. -) d