Loading...
HomeMy WebLinkAbout2009 02 23 Other - Distributed to City Commission During Meeting Related to Motions Made as a Result of Attorney-Client SessionDate: February 23, 2009 The attached was distributed to the city Commission during the early part of the Regular City Commission Meeting of February 23, 2009 and which related to Motions made as a result of this evening's Attorney-Client Session. JESUP RESERVE AND JESUP LANDINGS Recommended Motions: 1. Motion to authorize the City Manager to competitively bid the completion of the Jesup Reserve repair work outlined in the scope of work prepared by the City Engineer and presented to the City Commission during the previous attorney-client session this evening (Estimated cost: $123,615.00). 2. Now that most of the City's reserves placed in the SBA fund have been returned to the City, Motion to fund the Jesup Reserve repair work through the use of general fund reserves with the understanding that any funds recovered in the maintenance and performance bond lawsuits be used to replenish the amount taken from the general fund reserves to fund the repairs. 3. Motion to direct the City Attorney to file a lawsuit against Lexon Insurance Company to recover applicable bond proceeds, including attorneys fees and costs, related to any and all claims that the City has against the performance bonds posted for the Jesup Reserve and Jesup Landings projects previously approved by the City Commission. CI to Bid the Followin Re alr Work in Jesu 's Reserve: Item 0 Wo tam Descri t o antl Unit Unit Prtee EsG a d Cos Cost Reference Bo d efere ce Is Work Item Publie ata Road Reco ct o k• 1 Mill and Resurface halt Streets wltttM Develo d Portion of Subdivision Both Lifts 5600 SY 57.5 542,33 Current City Paving Contrail w/ Middlesex Maintenance (Mig and 1st LM • PeAomrance (2nd Lift) Public 2 Remove and Re lace Limerodc Roadw Base 4 SY 518.5 57,40 Contractor Btd (CF Maintenance Public 3 Re lace Traffic SI nal Loo a on Md_eod's Wa 4 E4 31,300. 55,20 Contractor Bid (CFE Performance Public 4 Final Striping and Pavement Markers 1 LS 55,000. 55,00 County Prices Perfomtance Publk 5 Remove and Replace 18" T e F Curb end Gutter B LF 523.5 518,84 Contractor Bid CFE) Melntmance Public 6 Remove and Re lace 24' Vail Gutter 800 LF 522. S17,60 Contractor Bld CFE Maintenance Public 7 Re air stomrweter Inlet on Crimson Lene 1 LS 52,100. S2,1(IO Conlrador Bid CFE Maintenance Public SUBTOTAL ROAD RECONSTRUCTIO 598,478 tit Work: 8 Cleanout san'de sewer stem 4400 LF 53.10 513,640 Contractor Bid CFE) Maintenance Public 9 Re lace sanity sewer deanout ce s 25 FA 575.0 51,875 Conlrador Bid CFE Maintenance Public 10 Re lace broken valve boxes 8 EA 5125. S1,000 Conlrador Bid CFE Maintenance Public SUBTOTAL UTI 576,515 Mlsce I eous• 11 Moblr¢a0on end Bonds 1 LS 55,749.5 55,750 5% of total NIA Public 12 Maintenance of Traffic 1 LS S2,874.7 52,875 2.5% of total WA Publie SUBTOTAL MISCELLANEOU SB 824 TOTAL 5123,615