Loading...
HomeMy WebLinkAbout2009 02 09 Consent 202 Middlesex Corporation Contract AgreementCOMMISSION AGENDA ITEM 202 February 9, 2009 Meeting CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR MGR /DEPT/G~/ Authorization REQUEST: Public Works Department requesting authorization to enter into a contract agreement with The Middlesex Corporation for Asphalt Resurfacing of Various City Streets PURPOSE: The purpose of this agenda item is to request authorization to enter into a contract agreement with The Middlesex Corporation for Asphalt Resurfacing of Various City Streets in the amount of $413,315.65 plus 10% contingency. CONSIDERATIONS: • The City Commission approved an update to the 3-year Paving Master Plan at the January 12, 2009 Commission meeting. The Year 1 (FY 2008-09) paving projects consisted of the following streets: 1. South Moss Road -Reconstruct from Kristi Ann Court to Lombardy Road 2. Shore Road -Reconstruct at Stoner Road (southbound lane) 3. Murphy Road -Resurface from Moss Road to Edgemon Avenue 4. Edgemon Avenue -Resurface from Lombardy Road to Murphy Road 5. Antelope Trail /Swan Street -Resurface 6. Eagle Nest Circle -Resurface south half 7. Davenport Glen -Resurface Phase 2 (Warrington, Tiverton, Littleton) • Bid #ITB-006-09/BF to complete resurfacing or pavement reconstruction of the above- listed streets was opened on January 28, 2009. The five (5) bids received were as follows: 020909_COMM_Consent 202_2009 Resurfacing February 9, 2009 Agenda Item #202 Page 2 of 3 1. The Middlesex Corporation $326,904.65 2. P&S Paving, Inc. $333,928.68 3. Orlando Paving Company $347,114.55 4. APAC-Southeast, Inc. $353,170.34 5. Ranger Construction Industries $375,474.43 • Staff has reviewed the bids and recommends that the bid be awarded to the lowest bidder, The Middlesex Corporation. Middlesex has successfully completed resurfacing work for the City in the past, including the FY 2007-08 resurfacing program. • Middlesex's unit prices for resurfacing were significantly lower than projected. As a result, additional streets can be added to the current year resurfacing program without exceeding the project budget. Middlesex has agreed to extend the unit prices in their bid to additional streets. Staff is recommending adding the following streets in Glen Eagle, which are all listed in Year 2 of the Paving Master Plan: 1. Wingspan Way $25,637 2. Overlook Way $9,334 3. Forest View Ct $7,324 4. Golfpoint Dr/Ct $22,523 5. N. Greenleaf Ct $6,802 6. Nature Ct $14,791 TOTAL $86,411 Resurfacing of the above-listed streets will complete the phased resurfacing program in Glen Eagle, which was initially planned as a four phase project, but will now be complete in three years. • With the additional streets, the total construction cost is $413,315.65 ($326,904.65 + $86,411.00). Regarding the additional streets, it should be noted that if the bid quantities were adjusted for all bidders and their unit prices were all held constant, Middlesex would still have the lowest overall bid price. February 9, 2009 Agenda Item #202 Page 3 of 3 FUNDING: The Asphalt Resurfacing Project is funded as follows: Fundin Source Amount FEMA Reimbursement $77,960.00 Roadway Improvement Fund (One-Cent Sales Tax) $86,595.65 Transportation Improvement Fund (Local O tion Gas Tax) $248,760.00 TOTAL $413 315.65 The amounts listed above are within the budgeted amounts for FY 2008-09, and fund balances will comply with the City's 25% minimum fund balance policy. RECOMMENDATION: Staff recommends that authorization be given to enter into a contract agreement with The Middlesex Corporation for Asphalt Resurfacing of Various City Streets in the amount of $413,315.65 plus 10% contingency, funded as shown in the table above. IMPLEMENTATION SCHEDULE: The scope of work will be completed within 120 days of notice to proceed. ATTACHMENTS: 1. Exhibit A -Bid Tabulation COMMISSION ACTION: CITY OF WINTER SPRINGS, FL 1126 EAST STATE ROAD 434 WINTER SPRINGS, FL 32708 407-327-1800 ITB006/09/BF Asphalt Resurfacing Various City Streets Called By: Nancy Vobornik-Purchasing Coordinator ITB Opened: 1:30 PM ITB Closed : 1:35 PM Date: January 28, 2009 Witness: Ken Hutchings, Engineering Tech/Construction Inspector Zynka Perez, Storm Water Utility Manager The Middlesex Corporation One Spectable Pond Road Littleton, MA 01460 978-742-4400 phone 978-742-4455 fax Base Bid: $326,904.65 P & S Paving, Inc 3701 Olson Drive Daytona Beach, FL 32124 Phone- none given Base Bid: $ 333.928.68 APAC-Southeast, Inc 3504 Lake Lynda Dr Suite 170 Orlando, FL 32817 Phone- none given Base Bid: $353,170.34 Ranger Construction Industries, Inc. 1200 Elboc Way Winter Garden, FL 34787 Phone-none given Base Bid: ~ 375,474.43 Page two Orlando Paving Company A Division of Hubbard Construction Co PO Box 547186 Orlando, FL 32854-7186 Phone- none given Base Bid: $ 347,114.55