HomeMy WebLinkAbout2009 01 12 Consent 211 Reynolds Inliner Stormwater Piping RepairsCOMMISSION AGENDA ITEM 211 January 12, 2009 Meeting CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR MGR ~/DEPT ~~~,/" Authorization REQUEST: The Public Works Department / Stormwater Division Requests City Commission Authorization to piggyback off Orange County Contract No. Y6-1005-J2 with Reynolds Inliner, LLC to perform Stormwater piping repairs at various locations. PURPOSE: The Public Works Department /Stormwater Division Requests City Commission Authorization to piggyback off Orange County Contract No. Y6-1005-J2 with Reynolds Inliner, LLC to perform stormwater piping repairs at various locations in the amount of $154,100 plus a 10% contingency CONSIDERATIONS: • Tropical Storm Fay hit Winter Springs on August 20-22, 2008, dropping more than 20- inches of rain over athree-day period. The heavy rains overwhelmed portions of the City's Stormwater conveyance system. This project is needed for the rehabilitation of a total of 6901ineal feet of failed Stormwater piping at the following four locations: 0 48-inch Corrugated Metal Pipe at Wade Street 0 42-inch Corrugated Metal Pipe at Fairway Oaks 0 42-inch Reinforced Concrete Pipe on Eagle Nest Circle at Overlook Way 0 30-inch Reinforced Concrete Pipe across Seneca Boulevard • The proposed method of pipe repair is relining using cured-in-place pipe (CIPP) lining technology, a trenchless repair technology that is effective in areas where construction space is limited or where excavating and removing an existing failed pipe would result in extensive surface restoration, such as across a road or adjacent to a building foundation. • Instead of excavating and replacing a damaged pipe, a felt tube saturated with resin and coated with a waterproof layer is inserted into the pipe. The resin in the tube is then cured by circulating heated air through the tube. Once cured, the material serves as a barrier between the damaged pipe and the water that flows through it. CIPP can be designed as a Consent Agenda Item #211 January 12, 2009 Page 2 of 3 new stand-alone pipe or can rely on the structural integrity of the old pipe. The cost of rehabilitation includes the cleaning, dewatering, installation of CIPP lining and final video inspection. View Inside Pipe After Cured-In-Place Pipe Lining • The Inliner product uses three different resin systems - polyester (both neat and enhanced), vinyl ester and epoxy -depending on the nature of the piping environment. The Inliner product has a 50-year design life and the in-service product provides a full flow capacity equal to at least 100 percent of the original pipe's full flow capacity in most instances. • In 2008, Reynolds Inliner successfully completed the relining of 174 lineal feet of a 42- inch corrugated metal culvert pipe at the Mt. Laurel Drive stormwater pond outfall. FUNDING: The project cost is $154,100 plus a 10% contingency. The funding source is the Stormwater Operating Fund, #3800, through a deferral of a $100,000 transfer for the Public Works /Utility Administration Building and a deferral of $55,000 for a TMDL water quality project. The Public Works /Utility Administration Building is not planned for construction in 2009, and the TMDL water quality project is not expected to be required in 2009 based on the current status of the Lake Jesup Basin Management Action Plan. RECOMMENDATION: Staff recommends that authorization be given to The Public Works Department / Stormwater Division to piggyback off Orange County Contract No. Y6-1005-J2 with Consent Agenda Item #211 January 12, 2009 Page 3 of 3 Reynolds Inliner, LLC to perform stormwater piping repairs at various locations in the amount of $154,100 plus a 10% contingency. ATTACHMENTS: Proposal from Reynolds Inliner dated December 5, 2008 COMMISSION ACTION: Inliner American, Inc. Full Service System Renewal ~ - PROPOSAL DATE: ' December 5, 2008 SUBMITTED TO: City of Winter Springs 1126 East State Road 434 Winter Springs, FL 32708-2799 Attn: Zynka P. Perez, Stormwater Utility Manager JOB LOCATION: Various Locations, Winter Springs, FL W e propose hereby to famish material and labor -complete ;n accordance with specifications below, for the sum of One Hundred Fifty-Four Thousand One Hundred dollars and no cents ($154,100.00) Payment terms -100% within thirty (30) days upon completion and acceptance. All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from specifications below involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workman's Compensation insurance. Note: This proposal maybe withdrawn by us if not accepted within thirty (30) days. We hereby submit specifications and estimates as follows: Inliner American, Inc. shall supply all equipment, materials and labor to install InlinerT"' as follows: DESCRIPTION TY UNIT PRICE TOTAL Item #118 - Li t Cleanin 24" thru 42" 575 LF $7.50 $4 12.50 Item #119 -Medium Cleanin 24" thru 42" 115 LF $10.00 $1,150.00 Item #136 - Furnish/Instal130" RICIPP 12 mm 56 LF $100.00 $5,600.00 Item #142 - Furnish/Insta1142" RICIPP 16.5 & 21 mm 320 LF $175.00 $56 000.00 Item #144 -Furnish 42" RICIPP Thickness Variance +1.5 mm 115 LF Se ent Onl to 21 mm 345 LF $7.50 $2,587.50 Item #145 - Furnish/Install 48" RICIPP 19.5 mm 314. LF $195.00 $61 30.00 Item #147 -Furnish 48" RICIPP Thickness Variance +1.5 mm 314 LF to 24 mm 1,256 LF $7.50 $9,420.00 Item #169 -Video Cleanin 690 LF $10.00 $6,900.00 Item #170 -Video RICIPP Installation 690 LF $10.00 $6,900.00 TOTAL $154,100.00 NOTE: 1. Pricing based on prices contained in a contract between Inliner American, Inc. and Orange County, Florida, Contract No. Y6-1005-J2. 2. Inliner to be installed as per ASTM & manufacturer's specifications. 3. Payment shall be based on actual field measurements from center of inlet to center of outlet. 4. This proposal is subject to pre-TV inspection by Inliner American, Inc. indicating line conditions are acceptable for installation of Inliner. 5. Price quoted does not include point repairs if required prior to installing Inliner. 6. Inliner American, Inc. shall furnish City of Winter Springs with final TV tapes of rehabilitated sewer lines. 7. Proposal does not include bonds or permit fees. Bond, if requi be voiced at 2°/ the total. Permit fees, if any, will be invoiced at cost. Signatur elson, Branch Manager . ~ . Acceptance Of Pr0110Sa1-The above prices, specifications and conditions are satisfactory and are hereby. ate. You are. authorized to do the work as specified. Payment will be made as outlined above. Date of Acceptance Authorized Signature 109 Applewood Drive, Longwood, FL 32750 Phone: (407) 260-9668 Fax: (407) 260-9318 Birmingham, AL • Phoenix, AZ • Clearwater, FL • Ft. Lauderdale, FL • Lake Mary, FL • Longwood, FL Atlanta, GA • Orleans, IN • Fairfield, ME • Charlotte, NC • Hilliard, OH • Baytown, TX