Loading...
HomeMy WebLinkAbout2010 02 22 Other Document Referenced During Regular Agenda Item 601 Date: February 22, 2010 This document /email was given to the City Clerk by Commissioner Joanne M. Krebs and referenced by Commissioner Joanne M. Krebs during the discussion of Regular Agenda Item "601" at the February 22, 2010 City Commission Regular Meeting. Joanne M Krebs From: Brian Fields [bfields @winterspringsfl.org] Sent: Monday, February 22, 2010 11:39 AM To: Joanne Krebs Cc: Kevin Smith; Kip Lockcuff Subject: S.R. 434 Median Removal at Bruster's Commissioner Krebs, Kevin asked me to provide a brief synopsis of the previous S.R. 434 median modification project completed in 2007, which included removing the concrete median in front of Bruster's. • The S.R 434 Village Walk project was completed in 2005. The median was installed as a safety and aesthetic improvement. • Shortly after project completion, complaints were received about U -turn operations and lack of left -turn access to particular businesses, including Bruster's. • At the City's request, FDOT performed a study in May 2006 of the entire S.R. 434 corridor from Talmo Street to Hayes Road. The study's purpose was to evaluate u -turn operations as well as the need for left turn improvements within the study section. The FDOT study "recommended the removal of raised medians along the study segment except near signals and isolated landscaped islands providing a two -way left turn lane for vehicles to make direct left turns as opposed to u -turns at unrestricted intersections." • Based on the recommendations in the FDOT study, the following improvements were implemented in 2007 by the City at a total cost of $91,590: 1. Remove the existing concrete median from Costa Rica Drive to Sherry Avenue and install a center turn lane (provided direct access to Bruster's and others) 2. Remove the existing concrete median from Hacienda Boulevard east to just past Bennet Street 3. At Hayes Road intersection, remove a short segment of the eastbound median to allow safer u- turns at this location 4. At Edgemon Avenue and Moss Road, install protected - permitted left turn phases for the eastbound and westbound left turning movements. 5. At Edgemon Avenue and Moss Road, modify the side street phasing to a leading northbound protected - permitted left -turn phase followed by the through movements phase. • The City's 2007 project limited the median removals to only those locations where there was a concrete median barrier; no landscaped median islands were removed. • The removal of the concrete median from Costa Rica to Sherry (item #1 above) was driven by repeated complaints from Mr. Khan at Bruster's that the lack of left -turn access was hurting his business. Brian Fields, P.E. City Engineer City of Winter Springs 1