HomeMy WebLinkAbout1999 09 13 Public Hearings Item C II" I r'l I I , J' ! It COMMISSION AGENDA ITEM C Consent Informational Public Hearing X Regular September 13. 1999 Meeting MGRf-" DEP~ Authorizatio~ REQUEST: The Community Development Department - Planning Division request the City Commission hold a public hearing for the first reading of Ordinance 739 to adopt the Capital Improvements Program / Capital Outlays document. PURPOSE: The purpose of this Board item is the consideration of a Capital Improvements Program / Capital Outlays which serves as a planning tool to provide a perspective of the City's capital needs. It is through a Capital Improvements / Capital Outlays Program review process that long range plans for the orderly maintenance and improvement of Winter Springs' physical assets can be accomplished. APPLICABLE LAW & PUBLIC POLICY: The provisions of 163.3177(1)(b) Florida Statutes which states "The capital improvements element shall be reviewed on an annual basis and modified as necessary in accordance with 163.3187 or 163.3189, except that corrections, updates, and modifications concerning costs, revenue sources, acceptance of facilities pursuant to dedications which are consistent with the plan; or the date of construction of any facility enumerated in the capital improvements element may be accomplished by ordinance and shall not be deemed to be amendments to the local comprehensive plan. All public facilities shall be consistent with the capital improvements element." CDD/September 2, 199911 :37 PM SEPTEMBER 13, 1999 PUBLIC HEARING AGENDA ITEM C Page 2 The provisions of9J-5.016(5) Florida Administrative Code which states in part "In addition to the general monitoring and evaluation requirements in this Chapter, this element (capital improvements) shall be reviewed on an annual basis." CONSIDERA TIONS: . The Capital Improvements Program is a plan adopted by the City Commission outlining the annual operating and capital budget. There is no commitment to expenditures or appropriations beyond the first year (Capital Budget), except for those capital improvements programmed in the Capital Improvement Element. . The various department heads have prepared their appropriate sections of the Capital Improvements Program and reviewed them collectively and made appropriate adjustments. . The Capital Improvements Program / Capital Outlays document was presented to the Local Planning Agency for their review and recommendation on September l' 1999. The LP A recommended approval to the City Commission. FUNDING: N/A RECOMMENDATION: The staff recommends that the City Commission approve the first reading of the Capital Improvements Program / Capital Outlays document as presented. IMPLEMENTA nON: The City Commission would hold a public hearing for the second reading and adoption of Ordinance 739 on September 27, 1999. The ordinance would take effect upon adoption. CDD/September 2,1999/1:37 PM SEPTEMBER 13,1999 PUBLIC HEARING AGENDA ITEM C Page 3 ATTACHMENT: A. Ordinance 739 B. Capital Improvements Program / Capital Outlays document COMMISSION ACTION: CDD/September 2, 1999/1 :37 PM ORDINANCE NO. 739 AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF WINTER SPRINGS, FLORIDA ADOPTING THE CAPITAL IMPROVEMENTS PROGRAM I CAPITAL OUTLAYS FOR FISCAL YEAR 1999/2000 IN ACCORDANCE WITH 163.3177(1)(B) FLORIDA STATUTES AND 9J-5.016(5) FLORIDA ADMINISTRATIVE CODE; PROVIDING FOR SEVERABILITY; CONFLICTS; AND AN EFFECTIVE DATE. WHEREAS, The City Commission desires to adopt a Capital Improvements Program / Capital Outlays document in accordance with the provisions of 163.3177(l)(b) Florida Statutes as part of its annual operating and capital budget process. WHEREAS, the Local Planning Agency has reviewed the Capital Improvements Program I Capital Outlays document and has recommended to the City Commission adoption of same, in accordance with 163.3174 Florida Statutes; " ATTEST: ANDREA LORENZO-LUACES INTERIM CITY CLERK, CITY OF WINTER SPRINGS FIRST READING POSTED SECOND READING AND PUBLIC HEARING -.. CITY OF WINTER SPRINGS, FLORIDA Ronald W. McLemore City Manager 1126 EAST STATE ROAD 434 WINTER SPRINGS. FLORIDA 32708.2799 Telephone (407) 327-1800 September ,1, 1999 Chairman Stevens and Members of the Local Planning Agency: . The City Administration has developed a proposed Capital Improvements I Capital Outlays Program for the five (5) year planning period Fiscal Year 99/2000 through Fiscal Year 2003/2004, As City Manager, I am pleased to submit this Capital Improvements I Capital Outlays Program document for Local Planning Agency review and recommendation, This document has been prepared to provide both a perspective of and a planning tool for the City's capital needs. Sufficient project detail is provided to enable those who review it to make informed decisions about the programming of projects over the planning period, It is through a Capital Improvements I Capital Outlays Program review process that long range plans for the orderly maintenance and improvement of Winter Springs' physical assets can be accomplished. The Capital Improvements / Capital Outlays Program is ideally the embodiment of the various policies set down by the City Commission with City Administration involvement to achieve specific goals, objectives, and policies. Some of these goals, objectives and policies are contained in the adopted Winter Springs Comprehensive Plan, The City Administration has made a substantial effort to prepare this document that is reflective of the needs of the citizens of Winter Springs, Respectfully Submitted, . If ~ tJ.?#..?-t Ronald W, McLemore City Manager . . . TABLE OF CONTENTS INTRODUCTION Purpose Definition of Capital Improvements Program (CIP) Process Development of the Capital Improvement Program Department Ranking of Proposed Capital Improvement Relationship to the City's Comprehensive Plan The City's Comprehensive Plan ObjeCtive of the Capital Improvements Element Priorities of C~pital Improvements Annual Update of the Capital Improvements Element Criteria for Evaluation of Capital Improvements Relationship Between the Operating and Capital Budgets Inventory of Existing Revenue Sources Fiscal Policy Framework Types of Changes c.LE. Level of Service Standards Capital Outlays 1 1 2 2 2 3 3 4 4 5 5 6 6 7 7 8 8 CAPITAL IMPROVEMENTS PROGRAM Transportation Impact Fee Fund Transportation Improvement Fund . County Traffic Circulation Projects CAPITAL OUTLAYS Fire Department Police Department Parks and Recreation Department Utilities/Public Works Department Public Works General Fund Stonnwater Utility Potable Water Sanitary Sewer Reclaimed Water Equipment APPENDICES . Appendix A - C.LE. Level of Service Standards Appendix B - Inventory of Existing Revenue Sources Appendix C - Population Projections . . . CAPITAL IMPROVEMENTS PROGRAM/CAPITAL OUTLAYS 1999/2000 UPDATE INTRODUCTION: Purpose One of the responsibilities of local government is to provide, maintain, and improve a community's infrastructure of buildings, roads, water and sewer lines, parks, etc, A Capital Improvements Program should be an expression of sOWld financial management and development practice, Local governments that wish to lure business investment in their community recognize that a well planned infrastructure program is essential, The Capital Improvements Program (CIP) selVes as the linkage between the City's Comprehensive Plan, fiscal plan and development. Definition of Capital Improvements Program (C,I.P,) In its essentials, the Capital Improvements Program is a multi-year prioritized schedule of improvements that lists each capital improvement by year it is purchased or commenced, the amoWlt to be spent per year and the method of financing such improvement. Chapter 163 Florida Statutes and 9J-5 Florida Administrative Code require a 5- Year Schedule of Capital Improvements, The first year of the 5- Year Schedule is the Capital Budget and the following four years becoming the actual Capital Improvement Program, The Capital Improvement Program is a plan adopted by the City Commission with the adoption of the annual operating and capital budget, without a commitment to expenditures or appropriations beyond the first year, except for those capital improvements programmed in the Capital Improvements Element (CIE) , Projects programmed in the 5- Year Capital Improvement Element (CIE) have a commitment for fimding for the five year period through the adopted Comprehensive Plan, The CIE is a five year program that is updated annually through the Capital Improvements Program Process and can be amended twice a year through the Comprehensive Plan amendment process. It should be noted that a Capital Improvements Program is not a fixed document but a flexible, evolutionary document that should be updated each year to show the changing . priorities, opportwrities, costs, or different financing approaches. 1 . . . Process Development of the Capital Improvement Program 1, Project Request Forms are prepared by various departments of the City, These forms require a project description, justification, cost estimates, impact on the City's operating budget, implementation schedule, and project location, 2, The Project Request Forms are reviewed by the Planning Department (Community Development Division) [as required by Objective C, Policy 3 of the Capital Improvements Element], the Finance Department, and then the City Manager, 3, The Local Planning Agency (LP A) reviews the City Manager's recommended Capital Improvements Program in terms of the community's needs and financing, and then makes recommendation to the City Commission. 4, The LP A recommendation and the City Manager's recommendation are considered by the City Commission in developing the annual operating budget (effective the first day of October each year i,e, beginning of 'the Fiscal Year "FY"), Department Ranking of Proposed Capital Improvement Each Project Request Form has a department priority recommendation, The priority ranking indicates the department's importance of the project to the departments functional program, The priority designations are as follows: 1, Critical Deficiency - required to eliminate proven or obvious dangers to public or employee health or safety, 2, Existing Deficiency - needed to raise a service or facility to an adopted Level of Service, 3, Repair/replacement - maintains adopted Level of Service Standard in developed areas and gives comparable service standards in developing areas, 2 .. . . 4. Future need/planned expansion - enables the City to provide seIVice required for scheduled development. Relationship to the City's Comprehensive Plan Under Florida's growth management legislation, the Capital Improvements Program is one of the essential elements of the comprehensive plan. The Local Government Comprehensive Planning and Land Development Regulation Act passed by the Legislature in 1985 (163.3161 Florida Statutes) mandated local governments prepare a financially feasible Capital Improvements Element as part of their comprehensive plan. Local governments must: . Develop a financially feasible plan; Determine the capital improvements needed to attain and maintain adopted Levels Of SeIVice (LOS); Develop a monitoring system to ensure that programmed capital improvements are ~ctua1ly completed, and adopted levels of seIVice are maintained; Revise Land Development Regulations to include the concurrency prOVISIon, . . . The Capital Improvements Element differs from the Capital Improvements Program in that certain capital improvements are stated as required at the time of the adoption of the Comprehensive Plan to meet the indicated Levels of SeIVice in the respective Elements, The Capital Improvements Program is a rolling 5- Year Schedule of Improvements that state additional improvements needed to maintain the LOS indicated in the Capital Improvements Element or improvements that are above and beyond those required to maintain the LOS, Hence, the Capital Improvements Program includes the Capital Improvements Element and all other capital projects to be funded by the City and is the linkage between capital expenditures and policy, The City'$ Comprehensive Plan The City of Winter Springs adopted Comprehensive Plan is comprised of eight (8) Elements as specified in Chapter 163 Florida Statutes and in Rule 9J-5 Florida Administrative Code, Effective planning and growth management includes the adequate provision of services and infrastructure and is required by the State to be addressed in certain Elements of a Comprehensive Plan, For the City of Winter Springs, these are: 3 . . . Traffic Circulation Recreation and Open Space Solid Waste Water Sewer Storm water (drainage) Another Element, the Capital Improvements Element [C.lE,], consolidates the Level of Service Standards (page 73 of VoL 2 of 2 of the Comprehensive Plan) indicated for each of the above areas and policies that ensures effective implementation {See Appendix AL Objective of the Capital Improvements Element Throughout the planning period, the C,lE, shall be used as a basis for development of a fiscally sound Capital Improvements Program to ensure that construction of capital facilities is adequate to accommodate desired future growth, Allocation of future growth shall be determined through coordination of fiscal and land use decisions, within the Schedule of Capital Improvements, The C.lE, promotes this assurance through the adoption of a financially feasible 5- Year Schedule of Capital hnprovements for each type of facility, and measuring whether those improvements are adequate to meet current and projected demands for the five (5) years fOlWard, Objective A, Policy 3 in the C,lE, requires the City to annually update the 5- Year Schedule of Capital Improvements, Priorities of Capital Improvements The City's Comprehensive Plan indicates in Objective A, Policy 1 of the Capital hnprovements Element that Projects selected year by year for funding shall be those from which the greatest public benefit will be derived from the funds available, To this end: · Transportation Improvements shall be prioritized according to a hierarchy of funding municipal collector roads needed to enhance delivery of emergency services, to facilitate access to schools and recreational facilities, to provide alternative routes to use on congested arterials, to create convenient access to goods and services, 4 . . . . Potable Water and Sanitary Sewer Improvements shall be ranked to ensure the continued provision of safe and sufficient service to existing residences and businesses, to implement projects designed to protect water quality and conselVe water supplies, to install equipment that will economize operations and reduce the conswners' costs, to expand the capacity of the utilities to selVe new development and thereby generate reselVation and connection fees to be reinvested in the utility operations. · Stormwater Improvement priorities shall be those detennined by the City-wide drainage study to be conducted through the proposed storm water utility, · Recreation and Open Space Capital projects funded in the future beyond those already allocated shall be selected to fulfill neighborhoods needs for additional land and installation of active recreational facilities within safe walking distance of residential areas, to expand the variety of activities offered at the City's community park, to address r~creation for special interests of citizens, Annual Update of the Capital Improvements Element The pwposes for the annual review and update of the C,I.E, are: · Adjust the 5- Year Schedule of Capital Improvements fOlWard one year into the future, so that there is always an improvements program that covers a future 5-year time period, · Maintain continued consistency of the first year of each 5-year period with annual budgets as they are adopted, · assure continued financial feasibility and provision of adequate services and facilities, Criteria for Evaluation of Capital Improvements The city in the annual update of the 5- Year Schedule of capital improvements shall use the following criteria to evaluate capital improvements projects: 5 . . . · Consistency with the Elements of the Comprehensive Plan; . Elimination of existing deficiencies; · Impact on the annual operating and capital budgets; · The location in relation to the Future Land Use Map; · Accommodation of demands from redevelopment and new development; · Consistency with plans of state agencies and the St. Johns River Water Management District; · Additional identified revenue sources to complete the improvement; · Financial feasibility, Relationship Between the Operating and Capital Budgets The operating and capital budgets are closely linked, The operating budget must cover the cost of financing, maintaining and operating new facilities that are built under the capital budget. The operating budget, through the debt service fund, must pay interest expense and principal payments on all bonded debt. Inventory of Existing Revenue Sources To implement a Capital Improvements Program, there must be identified adequate available funds for financing the capital improvements listed in the 5- Year Schedule of Capital Improvements, The effectiveness of the C,I.P, is dependent on the financial resources behind it. Chapter 163 F,S, and 9J-5 F.A,C, require a Capital Improvements Program to be financially feasible, Some of these fund sources present some difficulty in their prediction such as federal and state funding due to the significant variation from year to year, Special assessments present similar difficulty, Winter Spring's major fund categories and their use as funding mechanisms for both the operating and capital improvements budget are described in Appendix B, 6 . . . Fiscal Policy Framework The following fiscal policy framework shall be used to formulate the Capital Improvements Program each year, as indicated in Objective A, Policy 2 of the Capital Improvements Element: · The City shall continue the conservative fiscal policies evident in the initial Capital Improvements Program. a. Debt shall be limited to bondable revenue, as was the case to fund scheduled utility and recreation construction. b. Responsible debt ratios shall be maintained, comparable to those reflected in the current status: 1. Maximum ratio of total debt service to total revenue: City coverage Water & Sewer 2.31 1.73 ll. Maximmn ratio of. outstanding capital indebtedness to property tax base: City Coverage 27.17 Types of Changes The types of changes made to the 5- Year Schedules of Capital Improvements in each update are summarized below: · The 5-year time period is adjusted from FY 98/99 through 2002/2003 to FY 99/2000 through 2003/2004. New projects incorporated based upon the extension to FY 2003/20034 will be consistent with the relative priorities for capital improvements established in the Comprehensive Plan in each facility Element and in Objective A, Policy 1 of the Capital Improvements Element. 7 . . . . The schedules or funding sources of some projects are adjusted to reflect management and funding strategies developed in conjunction with the FY 99/2000 adopted budget. · Project costs are updated as appropriate based upon recent actual costs or updated background studies. Currently available revenue sources will fund the proposed improvements, thus maintaining the financial feasibility established in the 1992 Comprehensive Plan. , Additionally, summary sheets accompany each improvements schedule and are updated as follows: · To reflect the adjusted schedules of improvements discussed above. · To evaluate capacity needs for 1999 and 2004, based upon socio-economic estimates and projections for those years which have been updated based upon the following: a. Preliminary population estimate by the Bureau of Economic and Business Research at the University of Florida. b. Building Permits issued by the Building Department of the City. c. The Comprehensive Plan Figure LU-F9 "Estimated and Projected Population (1970 through 2010) [Appendix C] The population projection of the City of Winter Springs for July 1, 1999 is: 29,265 C.I.E. Level of Service Standards The principal criterion for capital improvements will be level of service (LOS) standards, quantitative indicators of the amount of service provided by a facility or type of facility. The City's need for capital improvements is largely determined by the LOS standards adopted in its Comprehensive Plan. 8 . . . In accordance with Objective C, Policy 1 of the Capital Improvements Element, Development approvals shall not degrade the Level of Service Standard adopted by the City of Winter Springs. [See Appendix A] Capital Outlays Only items that meet the definition of a capital outlay will be included in the Capital Outlay Program. The definition of a capital outlay is: A physical asset, constructed or purchased, and having a useful life of three (3) years and a minimum cost of $ 10,000. Capital outlays may include: · new and expanded facilities. · Rehabilitation or replacement of existing facilities. · Major pieces of equipment. · Cost of professional studies related to the improvement. · Acquisition of land related to a community facility. Capital outlays do not include: * The usual replacement of equipment and normal renovation with a cost of less than $ 10,000. * Those facilities and improvements related' to the Capital Improvements Element (CIE) of the City's Comprehensive Plan or maintain the Level of Service of facilities identified in the CIE. Generally, all outlays financed by long-term debt should be considered capital outlays. 9 . -..-' . . I I I I I I I I I I I TRANSPORTATION IMPACT FEE FUND. FUND BAlANCE FY94 FY95 FY96 FY97 FY98 FY99 FYOO FY01 FY02 FY03 FY04 FY05 ACTUAL ACTUAL ACTUAl. ACTUAl. ACTUAl. CURRENT PROPOSED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED TRANSPORT A nON ""PACT FEE FUND I I REVENUES I LICENSES, PERMITS & FEES 5571,213 $278,08-4 $282,993 $329,047 $210,560 $473,470 $267,285 $225,000 $225,000 $225,000 $225,000 $225,000 INTEREST $32,495 $79,851 $91,583 $113,880 $89,899 $85,000 $50,000 $10,000 $10,000 $10,000 $10,000 $10,000 MISCELlANOUS $0 $0 $0 $0 $74 $0 TOTAL REVENUES $603,708 $357,935 $374,578 $442,927 $300,533 $538,470 $317.285 $235,000 $235,000 $235,000 $235,000 $235,000 PERCENT INCREASE 40,31" ..co,71 " 4.65" 18.25% -32.15" 79,17" -41,08" -25.93% 0.00% O. 00'll0 0.00% 0.00" EXr'':~~S:::S I RECURRING EXPENSEl> $10,444 $290 $18,488 $139,843 $55,617 ;as,ceo $100,000 $50,000 $50,000 $50,000 , $50,000 $50,000 I CAPITAl OUTlAY $107,297 $78,792 $76,127 $419,792 $728,942 $600.000 $1,100,000 $500,000 $250,000 $0 $250,000 $0 I TOTAL EXPENSES $117,741 $79,082 $92,813 $559,435 $782,559 $685,000 $1,200.000 $550,000 $300,000 $50,000 S3OO,ooo $50,000 I REVENUESOVERIUNDERIEXPENSES $465,987 $278,853 $281,963 ($118,508) ($482,028) ($146,530) ($882.715) ($315,000) ($85,000) $185,000 ($65,000) $185,000 I BEGINNING FUND BAlANCE $1,109,408 $1,595,373 $1,874,228 $2.156,189 $2,039,681 $1,557,6SS $1,411,125 $528,410 $213,410 $148,410 $333,410 $268,410 I ENDlNG FUND BAlANCE $1,595,373 $1,874,228 $2,158.189 $2,039,681 $1,557,655 $1.411,125 $528,410 $213,410 $148,410 $333,410 $268,410 $453,410 I I 1I11m SHEET ~ . . . TRANSPORTATION IMPACT FEE FUND PROPOSED PROJECT EXPENDITURES BY YEAR Project Project PROPOSED Year 1 Year 2 Year 3 Year 4 Year 5 Total Prior Name Number 99/00 00/01 01/02 02103 03/04 04105 Moss Road - 00-0140-04 $1,100,000 $1,100,000 434 to 419 Fisher Rd. 01-0140-01 $500,000 $500,000 Paving Bahama Rd, 02-0140-02 $250,000 $250,000 Paving WJnter Springs ()4..O140-05 $250,000 $250,000 Blvd. (4 Lane) $0 TOTAL $1,100,000 $500,000 $250,000 $0 $250,000 $0 $2,100,000 $0 PROPOSED PROJECT REVENUE SOURCE BY YEAR Revenue project YEAR 0 Year 1 Year 2 Year 3 Year 4 Year 5 Total Prior Source Number 99/00 00101 01/02 02103 03/04 04105 Trans. Impact Fee Fund T.I.F.F. 00-0140-04 $1100000 $1,100,000 T,I.F,F. 01-0140-01 $500,000 $500,000 T,I.F,F. 02-0140-02 $250,000 $250,000 T.I.F,F. 04-0140-05 $250,000 $250,000 $0 TOTAL $1,100,000 $500,000 $250,000 $0 $250,000 $0 $2,100,000 $0 Approval Date: Start Date: Completion Date: 6/10I99.o001CIP.XLS . . .. CAnTALIMPROVEMENTPROJECTREQUESTFORM DEPARTMENT: Public Works PROJECfNAME: Moss Road-S.R 434toS.R 419 LOCATION: Moss Road SERVICE AREA: City PROJECf NUMBER: #00-0140-04 PROJECf PRIORITY: Planned Expansion IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? Yes CATEGORY CLASSIFICATION: Other Services DESCRIPTION/JUSTIFICA TION: This project is for the widening of Moss Road from two to four lanes from S.R. 434 to S.R. 419. This road is classified as a collector road-and it is an identified improvement in the Traffic Circulation Element of the Comprehensive Plan. RELA TIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: Needed to maintain the level of service for the Ranchland collector road system. . . . PROPOSED METHOD OF FINANCING: Transportation Impact Fee Fund IMPACT ON OPERATING BUDGET BY YEAR: Staff/Personnel $0 Operation/Maintenance $0 Capital Outlay $1,100,000 TOTAL: $1,100,000 $0 Offsetting Revenue: NET OPERATING IMPACT: $1,100,000 IMPACT ON REVENUE: No impact on revenue. 00-0 }4()..{)4. wpd ~/}8199 . . . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Public Works PROJECT NAME: Fisher Road Imorovements LOCATION: Ranchlands SERVICE AREA: City PROJECT NUMBER: #01-0140-01 PROJECT PRIORITY: Planned Expansion IS PROJECf A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? Yes DES CRIPTION/JU STIFICA nON: This project is for drainage and paving improvements to Fisher Road. This road is classified as a collector road and it currently has no drainage and is not paved, The lack of this improvement does not allow this road to function as collector road during extreme weather conditions, RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: Needed to maintain the level of service for the Ranchland collector road system. PROPOSED METHOD OF FlNANCING: Transportation Impact Fee Fund . .. . IMPACT ON OPERATING BUDGET BY YEAR: Stafl7Personnel $0 OperationIMaintenance $0 Capital Outlay $500,000 TOTAL: $500,000 Offsetting Revenue: $0 NET OPERATING IMPACT: $500,000 IMPACT ON REVENUE: No impact on revenue, 02-a141-al.wpd 6/10/99 . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: PROJECT NAME: Public Works Bahama Road Improvements LOCA nON: Ranchlands SERVICE AREA: City PROJECT NUMBER: #02-0140-02 PROJECT PRIORITY: Planned Expansion IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? Yes . DESCRIPTION/JUSTIFICATION: (Hayes Road to Shore Road). This road is classified as a collector road that is currently without drainage and paving. The lack of this improvement does not allow this road to function as a collector road during extreme weather conditions. RELA TIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: Needed to maintain the level of service for the Ranchland collector road system. PROPOSED METHOD OF FINANCING: Transportation Impact Fee Fund . . . . IMPACT ON OPERATING BUDGET BY YEAR: Staff7Personnel $0 OperationIMaintenance $0 Capital Outlay $250,000 TOTAL: $250,000 Offsetting Revenue: $0 NET OPERATING IMPACT: $250,000 IMPACI' ON REVENUE: No impact on revenue, 0~14()..()2.wpd 6/10/99 . . . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Public Works PROJECT NAME: Winter Sprin1!s Boulevard Turn Lanes LOCA nON: Tuscawilla SERVICE AREA: City PROJECT NUMBER: #04-0140-05 PROJECT PRIORITY: Planned Expansion IS PROJECT A CAPITAL Il\1PROVEMENT ELEMENT REQUIREl\1ENT? Yes CATEGORY CLASSIFICATION: Concurrency DESCRIPTlON/JUSTIFICA TION: This project is for the addition ofturn lanes on Winter Springs Boulevard form the eastern end of the northern loop o.fNorthern Way to the eastern end of the southern loop of Northern Way. This project eliminates a projected deficiency in the level of service for Winter Springs Boulevard, RELA nONSHIP TO OTHER PROJECTfPLANS AND THE COMPREHENSIVE PLAN: Needed to maintain the level of service for Winter Springs Boulevard as identified in the Traffic Circulation Element of the Comprehensive Plan, . . . PROPOSED METHOD OF FINANCING: Transportation Impact Fee Fund IMPACT ON OPERATING BUDGET BY YEAR: StaID'PersonneJ $0 Operation/Maintenance $0 Capital Outlay $250,000 TOTAL: $250,000 $0 Offsetting Revenue: NET OPERATING IMPACT: $250,000 IMPACT ON REVENUE: No impact on revenue, 04-0140-05.wpd 5/18/99 . . . T I I T I I I FUND. FUN O-UIDCI I FY94 FY95 FY96 FY97 FY98 FY99 FYOO FY01 FY02 FY03 FY04 FY05 I ACTUAl ACTUAl.. AC1UAl. ACTUAl.. ACTUAl.. CURRENT PROPOSED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED I R&VENUES: INTERGOVNMENT REVENUES $205.785 $205,502 $214.584 $195.954 $189.958 $218,000 $225,000 $225,000 $230,000 $235,000 $240,000 $245,000 INTEREST $26.804 $30,451 $18.991 $3,780 $2,134 $250 $2aO $1,000 $1,000 $1,000 $1,000 MlSCEUANOUS SO SO $31,870 SO SO $0 $0 $0 $0 $0 $0 I TOTAL REVeNUES ID2,3a SZH,IA $283,246 $1.,734 $112,G82 U1.,250 5226,210 $228.000 W1,OOO $231,000 $241,000 $246,000 I PERCENT INCREASE -7,43% 1.54... 11.57'" -24,13% -3,83'111 12.58% 4.16% 0,33% 2.21% 1.73% 2.55% 2.07% T I DPEHSES I RECURRING EXPENSES $28,558 $98,029 $151,020 $45,180 $93,102 $54,400 $47,120 ~.OOO $50,000 $50,000 $50,000 $50,000 CAPITAl.. OUTlAY 10 $356.147 $347,132 $50,248 $403.081 $1~,OOO $140.000 $130,000 $150.000 $130,000 5150,000 $130,000 VEHIClES 10 SO $0 SO $18,950 $24,000 $22,000 $0 $22,000 $0 OTHER EQUIPMENT $51,000 $10,000 $10,000 $10,000 $10,000 $10,000 TOTAL EXPEH86S I S28,5II $411,178 $4S8, 162 _,429 ......,83 $188,310 S212,12O $212,000 $210,000 S212,000 $210,000 $190,000 IPERCENT INCREASE -88.72'" 1479,97% 10,41% -80,84% 419,95% -80.02% 32.15% -19,12% ~,94% 0.95% ~.94% -9.52% T I R&VENUEa OVER lUHDI!Rl &XPEN8ES $203,81. 1$211,2231 lS234,I07] $104,105 ($304,0111 117,100 lsas,8701 $1.[000 $21 ,000 m,ooo $31,000 _,000 T I BEGINNING FUND BALANCE $102,083 $708,lNlI S4IO,II3 $251,77'8 S3IO,081 $11,880 m.ao $37,Cl2O $11,020 $72,020 SH.02O $128,020 T I ENDING RJND 8A&.ANC6 $701'- $410,181 $2II,m S3i0,081 S&I,StO $71,880 $37,G20 $11,020 572,020 St6,020 $128,020 $182,020 T I I I 7129199 S>ed1J2 . . . PUBLIC WORKS TRANSPORT A TION IMPROVEMENT FUND PROPOSED PROJECT EXPENDITURES BY YEAR Project Project Projected Year 1 Year 2 Year 3 Year 4 Year 5 Total Name Number 99/00 00/01 01/02 02103 03104 04105 Pubflc Works CompOUnd ()()'()104-01 $50 000 $50 000 $50,000 $50,000 $50,000 $250,000 ResurfaclnalUnderdlalns ()().()104-02 $140,000 $130,000 $150,000 $130,000 $150,000 $130,000 $830 ,000 TOTAL $140,000 $180,000 $200,000 $180,000 $200,000 $180,000 $1,080,000 PROPOSED PROJECT REVENUE SOURCE BY YEAR Revenue Project Projected Year 1 Year 2 Year 3 Year 4 Year 5 Total Source Number 99100 00101 01/02 02103 03/04 04105 Local ODtion Gas Tax ()()'()104-01 $50,000 $50,000 $50,000 $50,000 $50,000 $250,000 Local Option Gas Tax ()()'()104-02 $140,000 $130,000 $150,000 $130,000 $150,000 $130,000 $830,000 TOTAL $140,000 $180,000 $200,000 $180,000 $200,000 $180,000 $1,080,000 ,PROPOSED EQUIPMENT EXPENDITURES BY YEAR PROPOS EoulDment Project Projected Year 1 Year 2 Year 3 Year 4 Year 5 Total Name Number 99/00 00/01 01102 02103 03/04 04105 Vehicle Cl()..()104-04 $24,000 $22 000 $22 000 $22,000 $90,000 Other Equicment Cl()..()104-07 $10,000 $10,000 $10000 $10000 $10,000 $50,000 Tractor/Bushhoa 00-0104-07 $50,000 $50,000 TOTAL. $74,000 $32,000 $10,000 $32,000 $10,000 $32,000 $190,000 ED EQUIPMENT REVENUE SOURCE BY YEAR Revenue Proiect Proiected Year 1 Year 2 Year 3 Year 4 Year 5 Total Source Number 99/00 00101 01/02 02103 03/04 04105 Local Oction Gas Tax 00-4411-04 $24,000 $22,000 $22,000 $22,000 $90 ,000 Local Ootion Gas Tax 00-0104-07 $10,000 $10,000 $10000 $10,000 $10,000 $50,000 Local Option Gas Tax 00-0104-07 $50,000 $50,000 TOTAL $74,000 $32,000 $10,000 $32,000 $10,000 $32,000 $190,000 Approval Date: Start Date: Completion Date: 7129199-9798,CIP .. .\ 'J :. ) . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Public Works PROJECT NAME: Public Works Compound LOCATION: To Be Determined SERVICE AREA: City PROJECT NUMBER: #00-0104-01 PROJECT PRIORITY: Future Need IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUmEMENT? No DESCRlPTION/JUSTIFICA TION: The current Public Works complex is composed of multiple highly deteriorated plywood and tarpaper structures that were largely constructed in house. The current compound also suffers from a traffic circulation problem and lack of space. A new facility is needed to meet the Public Works demands of the City. RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: No relationship to other projects, PROPOSED METHOD OF FINANCING :Transportation Improvement Fund- Local Option Gas Tax . .:. -\ . ). . IMPACT ON OPERATING BUDGET BY YEAR: StafflPersonnel. $0 OperationIMaintenance $0 Capital Outlay $50,000/year TOTAL: $50,OOO/year $0 Offsetting Revenue: NET OPERATING IMPACT: $50 ,OOO/yea r IMPACT ON REVENUE: No impact on revenue, OO~ 1 04-OO.wpd 4130/99 . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Public Works PROJECT NAME: Street Resurfac;nJ! LOCA TION: Throughout City SERVICE AREA: City PROJECT NUMBER: 00-0104-02 PROJECT PRIORITY: RepairlReplacement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No . DESCRIPTION/JUSTIFlCA TION: ) . This project is for the annual resurfacing of City streets. RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: The resurfacing is located throughout the City. PROPOSED METHOD OF FINANCING: Transportation Improvement Fund- Local Option Gas Tax . . " . ) . ) .J IMPACT ON OPERATING BUDGET BY YEAR: StafflPersonnel $0 OperationlMaintenance $0 Capital Outlay $150,000/$130, 000 (Alternate years) TOTAL: $150,000/$130,000 Offsetting Revenue: $0 NET OPERATING IMPACT: $150,000/$130,000 IMPACT ON REVENUE: No impact on revenue. 00.0 I 04-02.wpd 4130199 . ',',."....) . . .\ ) .i CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Public Works PROJECT NAME: Vehicles LOCATION: Administration SERVICE AREA: City PROJECf NUMBER: #00-0104-04 PROJECf PRIORITY: Replacement IS PROJECf A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No DESCRIPTION/JUSTlFICA nON: This is for the replacement of Public Works operations vehicles. The fund sources for the replacement of one vehicle per year is alternated between General Fund and the Transportation Improvement Fund. RELATIONSHIP TO OTHER PROJECfIPLANS AND THE COMPREHENSIVE PLAN: No relationship with other projects, PROPOSED METHOD OF FINANCING: Transportation Improvement Fund IMPACT ON OPERATING BUDGET BY YEAR: . S taff/Personnel $0 OperationIMaintenance $0 Capital Outlay $22,000 TOTAL: $22tooo Offsetting Revenue: $0 NET OPERATING IMPACT: $22tooo IMPACT ON REVENUE: ., ., No impact on revenue. . 6130199~1Q4.(}4,wpd ) . . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Public Works PROJECT NAME: Eauioment Expenditures LOCATION: Administrative SERVICE AREA: City PROJECT NUMBER: #00-0104-07 PROJECT PRIORITY: Replacement IS PROJECT A CAPITAL IMPROVEMENT ELEMF;NT REQUIREMENT? No . DESCRlPTION/JUSTIFICA nON: Equipment needs to be replaced and new equipment added to keep abreast of the future workload and needs. Tractor/Bushhog needed in the 1999/2000 budget year. Additional requirements $lO,OOO.OO/year thereafter. RELA TIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: None PROPOSED METHOD OF FINANCING: Public Works Transportation Improvement Fun.<i. . -, .' .) .:.) IMPACT ON OPERATING BUDGET BY YEAR: Staff/Personnel $0 Operation/Maintenance $0 Capital Outlay TOTAL: $50,000 first year & $1 O,OOO/yr thereafter, $50,000 fint year & $10,000/yr thereafter $0 ($50,OOO)/yr. x (1) + $10,OOO.OO/yr thereafter Offsetting Revenue: NET OPERATING IMPACT: IMPACT ON REVENUE No impact on revenue. 20.3600-6' ,wpd . . . SEMINOLE COUNTY TRAFFIC CIRCULATION PROJECTS PROPOSED PROJECT EXPENDITURES BY YEAR Project Project Current Projected Year 1 Year 2 Year 3 Year 4 Year 5 Total Name Number 98/99 99/00 00/01 01102 02/03 03/04 04105 Undesignated Funds 0595 $1 315500 $1,315,500 Oak Forest Wall 0143A $292.000 $292,000 North Moss Road Improvements 0599 $1 000 000 $1,000,000 TuskawiBa Rd. from East Lake Dr, to Winter Springs Blvd. 0143 $4 955.394 $4,955,394 TuskawiUa Rd, from W,S. Blvd, to S,R. 434 0144 $7 054 536 $7,054,536 Brick Pavers at WSB 0145 $192,500 $192,500 TqTAl $12,494,430 $1,000,000 $1,315,500 $0 $0 $0 $0 514,809,930 Note: Projects #0143 and #0144 are cost estimates based on 1993 Seminole County C,I,E. PROPOSED PROJECT REVENUE SOURCE BY YEAR Revenue Project Current Projected Year 1 Year 2 Year 3 Year 4 YearS Total Source Number 98188 98/00 00/01 01102 02/03 03/04 04105 1 Cent Infrastructure Sales Tax 0595 $1,315500 $1,315,500 1 Cent Infrastructure Sales Tax 0143A $292,000 $292,000 1 Cent Infras1ruc:ture Sales Tax 0599 $1,000,000 $1 000,000 1 Cent Infrastructure Sales Tax 0143 $4,955,394 $4,955,394 1 Cent Infrastructure Sales Tax 0144 $7,054,536 $7 054,536 2 Cent Infrastructure Sales Tax 0145 $192,500 $192,500 TOTAL $12,494,430 $1,000,000 $1,315,500 $0 $0 $0 $0 $14,809,930 Completion Date: Approval Date: Start Date: 111 lJljl-alllK1P.JllS CAPITAL OUTLAY PROJECTS . , Project Item Year 1 Year 2 Year 3 Year 4 Year 5 Total FY 99/2000 FY 2000/01 FY 2001/02 FY 2002103 FY 2003/04 Rescue 26 $140,000 $140,000 Car 1 / Fire Marshal $18,000 $18,000 Thermal Imager $22,000 $22,000 Air Cascade Compressor $20,000 $20,000 Hydraulic Rescue Tool $25,000 $25,000 Engine 124 $280,000 $280,000 Station 3 $800,000 $800,000 Engine 3 $345,000 $345,000 Rescue 3 $190,000 $190,000 TOTAL $180,000 $20,000 $25,000 $280,000 $1,335,000 $1,840,000 Operating Impact Year 1 Year 2 Year 3 Year 4 YearS Total FY 99/2000 FY 2000/01 FY 2001/02 FY 2002103 FY 2003/04 Rescue 26 $0 Car 1/ Fire Marshal $0 Thermal Imager $0 Air Cascade Compressor $0 Hydraulic Rescue Tool $0 Engine 124 $0 Station 3 $680,000 $680,000 Engine 3 $10,000 $10,000 Rescue 3 $15,000 $15,000 TOTAL $0 $0 $0 $0 $705,000 $705,000 . Revenue Source Year 1 Year 2 Year 3 Year 4 Year S Total FY 99/2000 FY 2000/01 FY 2001/02 FY 2002103 FY 2003/04 General Fund $40,000 $20,000 $25,000 $280,000 $365,000 Medical Transport Fund $140,000 $190,000 $330,000 Impact Fees $1,145,000 $1,145,000 $0 $0 $0 $0 $0 $0 $0 $0 TOTAL $180,000 $20,000 $25,000 $280,000 $1,335,000 $1,840,000 Approval Date: Start Date: Completion Date: . . . . FIRE DEPARTMENT I MEDICAL TRANSPORT PROPOSED PROJECT EXPENDITURES BY YEAR Project Project Projected Year 1 Year 2 Year3 Year4 Year 5 Total Prior Name Number 99/00 00/01 01/02 02/03 03/04 04/05 Rescue 26 98-2210-002 $140,000 $140,000 Car 1 / Fire Marshal Vehicle 99-2210-002 $18,000 $18,000 Thermal Imager 98-2210-004 $22,000 $22,000 Air Cascade Compressor 99-2210-001 $20,000 $20,000 Hydraulic Rescue Tool 00-2210-001 $25,000 $25,000 Engine 124 01-2210-001 $280,000 $280,000 Station 3 02-2210-001 $800,000 $800,000 Engine 3 02-2210-002 $345,000 $345,000 Rescue 3 02-2210-003 $190,000 $190,000 TOTAL $0 $40,000 $45,000 $280,000 $1,145,000 $190,000 $1,840,000 $0 PROPOSED PROJECT REVENUE SOURCE BY YEAR Revenue Project Projected Year 1 Year 2 Year 3 Year 4 YearS Total Prior Source Number 99/00 00/01 01/02 02/03 03/04 04/05 Medical Transport Fund 98-2210-002 $140,000 $140,000 General Fund 99-2210-002 $18,000 $18,000 General Fund 98-2210-004 $22,000 $22,000 General Fund 99-2210-001 $20,000 $20,000 General Fund 00-2210-001 $25,000 $25,000 General Fund 01-2210-001 $280,000 $280,000 Fire Impact Fees 02-2210-001 $800,000 $800,000 Fire Impacl Fees 02-2210-002 $345,000 $345,000 Medical Transport Fund 02-2210-003 $190,000 $190,000 TOTAL $140,000 $40,000 $45,000 $280,000 $1,145,000 $190,000 $1,840,000 $0 . . . FIRE DEPARTMENT I MEDICAL TRANSPORT PROPOSED PROJECT OPERATING IMPACT BY YEAR Revenue Project Projected Year 1 Year 2 Year 3 Year4 Year 5 Total Prior Source Number 99/00 00/01 01102 02/03 03/04 04/05 Rescue 26 98-2210-002 $0 Car 1 / Fire Marshal Vehicle 99-2210-002 $0 Thennallmager 98-2210-004 $0 Air Cascade Compressor 99-2210-001 $0 Hydraulic Rescue Tool 00-2210-001 $0 Engine 124 01-2210-001 $0 Station 3 02-2210-001 $680,000 $680,000 Engine 3 02-2210-002 $10,000 $10,000 Rescue 3 02-2210-003 $15,000 $15,000 TOTAL $0 $0 $0 $0 $690,000 $15,000 $705,000 $0 Approval Date: Completion Date 8/09/99-9899CIP .XLS . . .. 1999-2000 CAPITAL OUTLAY PROJECT REQUEST FORM DEPARTMENT: Fire PROJECT NAME: Replacement of Rescue unit # 26 LOCATION: 850 Northern Way SERVICE AREA: Station 26 PROJECT NUMBER: 98-2210-002 PROJECT PRIORITY: 3 IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT: No CATEGORY CLASSIFICATION: Concurrency: Non-concurrency (Public Safety): X Other Services (Non-concurrency, Non-Public Safety): DESCRIPTION / JUSTIFICA nON FOR CAPITAL OUTLAY AND ANY ASSOCIAlED OPERATING BUDGET IMPACT: Replacement of the 1988 Ford F-350 Wheel Coach Type I rescue vehicle that was originally purchased in 1989. This vehicle will have been in service for 10 years as a front line unit. The unit will remain in service for 5 years as a reserve unit at which time the unit will be surplused. Staff/Personnel: No additional personnel is associated with this project Operation/Maintenance: Replacement vehicle - No additional operations or maintenance costs Capital Outlay: $ 140,000 TOTAL: $ 140,000 RELA TIONSHlP TO OTHER PROJECTS/PLANS AND THE COMPREHENSIVE PLAN: None PROPOSED METHOD OF FfNANCING: General Fund - Vehicles Medical Transport Fund . 1999-2000 CAPITAL OUTLAY PROJECT REQUEST FORM DEP ARTMENT: Fire PROJECf NAME: Replacement of the Fire Prevention Vehicle - Car I LOCATION: 102 North Moss Road SERVICE AREA: Station 24 and Station 26 PROJECf NUMBER: 99-2210-002 PROJECf PRIORITY: 3 IS PROJECf A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT: No CATEGORY CLASSIFICATION: Concurrency: Non-concurrency (Public Safety): X Other Services (Non-concurrency, Non-Public Safety): . DESCRIPTION I JUSTIFICA nON FOR CAPITAL OUfLA Y AND ANY ASS'OCIA TED OPERATING BUDGET IMPACf: Replacement of the 1988 Ford Crown Victoria that was originally purchased as the Fire Chiefs car in 1988. This vehicle has been in service for 12 years as a front line writ. This writ will be surplused StaffJPersonnel: No additional personnel is associated with this project OperationIMaintenance: Replacement vehicle - No additional operations or maintenance costs Capital Outlay: $ 18,000 TOTAL: $ 18,000 RELATIONSHIP TO OTHER PROJECTSIPLANS AND THE COMPREHENSIVE PLAN: None PROPOSED METHOD OF FINANCING: General Fund - Vehicles . . 1999-2000. CAPITAL OUTLAY PROJECT REQUEST FORM DEP ARTMENT: Fire PROJECT NAME: Thermal Imager LOCATION: 102 North Moss Road SERVICE AREA: Station 24 and Station 26 PROJECT NUMBER: 98-2210-004 PROJECT PRIORITY: 4 IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT: No CATEGORY CLASSIFICATION: Concurrency: Non-concurrency (Public Safety): X Other Services (Non-concurrency, Non-Public Safety): . DESCRIPTION / JUSTIFICATION FOR CAPITAL OUTLAY AND ANY ASSOCIATED OPERATING BUDGET IMP ACf: This device will allow personnel to spot potential patients/victims fu situations where sight is hampered by smoke, darkness, and obscured light conditions. This device will be carried on the Battalion Chiefs vehicle which responds to all serious nature alarms in the City. This device could also spot potentially lost victims in wooded areas. This would augment the Departments ability to perform rescues in a quicker manner by spotting the victims utilizing their body heat, Staff/Personnel: None required OperationIMaintenance: No additional costs associated with this project Capital Outlay: $ 22,000 TOTAL: $ 22,000 RELA TIONSIDP TO OTIffiR PROJECTS/PLANS AND THE COMPREHENSIVE PLAN: None PROPOSED METHOD OF FINANCING: General Fund - Equipment . . . . 1999-2000 CAPITAL OUTLAY PROJECT REQUEST FORM DEP ARTMENT: Fire PROJECT NAME: Air Cascade System Compressor LOCATION: 102 North Moss Road SERVICE AREA: Station 24 and Station 26 PROJECT NUMBER: 99-2210-001 PROJECT PRIORITY: 3 IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT: No CATEGORY CLASSIFICATION: Concurrency: Non-concurrency (Public Safety): X Other Services (N?n-concurrency, Non-Public Safety): DESCRIPTION / JUSTIFICATION FOR CAPITAL OUfLA Y AND ANY ASSOCIATED OPERATING BUDGET IMP ACT: The Air Cascade Compressor compresses the air that is breathed by Fire Fighters and Water Department personnel when they are entering or working in hazardous atmospheres. The Self Contained Breathing Apparatus air must meet air quality standards. Every 3 months an air sample is taken and sent away for analysis. Due to the age of the compressor and the use it gets we anticipate the compressor's replacement on a 15 year interval. The replaced unit will be swplused at City Auction or traded in on the new one. Staft/Personnel: No additional personnel is associated with this project OperationIMaintenance: Replacement equipment - No additional operations or maintenance costs Capital Outlay: $ 20,000 TOTAL: $ 20,000 RELATIONSHIP TO OTIlER PROJECTS/PLANS AND TIlE COMPREHENSIVE PLAN: None PROPOSED METHOD OF FINANCING: General Fund - Other Equipment . . . 1999-2000 CAPITAL OUTLAY PROJECT REQUEST FORM DEP ARTMENT: Fire PROJECT NAME: Replacement Hydraulic Rescue Tool LOCATION: 850 Northern Way SERVICE AREA: Station 24 and Station 26 PROJECT NUMBER: 00-2210-001 PROJECT PRlORITY: 3 IS PROJECf A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT: No CATEGORY CLASSIFICATION: Concurrency: Non-concurrency (Public Safety): X Other Services (Non-concurrency, Non-Public Safety): DESCRIPTION I JUSTIFICATION FOR CAPITAL OUTLAY AND ANY ASSOCIATED OPERATING BUDGET IMP ACf: The Hydraulic Rescue Tool is 11 years old and is scheduled to be replaced_ This unit is houSed at Fire Station 26 and is carried on Engine 26. StafflPersonnel: None required Operation/Maintenance: No additional costs associated with this project Capital Outlay: $ 25,000 TOTAL: $ 25,000 RELATIONSHIP TO OTHER PROJECTSIPLANS AND THE COMPREHENSIVE PLAN: None PROPOSED METIIOD OF FINANCING: General Fund - Equipment . . . 1999-2000 eAPIT AL OUTLAY PROJECT REQUEST FORM DEP ARTMENT: Fire PROJECT NAME: Replacement of Engine # 124 LOCATION: 102 North Moss Road SERVICE AREA: Station 24 and Station 26 PROJECT NUMBER: 01-2210-001 PROJECT PRIORITY: 3 IS PROJECT A CAPITAL Th-1PROVEMENT ELEMENT REQUIREMENT: No CATEGORY CLASSIFICATION: Concurrency: Non-concurrency (Public Safety): X Other Services (Non-concurrency, Non-Public Safety): DESCRIPTION I JUSTIFICATION FOR CAPITAL OUTLAY AND ANY ASSOCIATED OPERATING BUDGET Th-1PACf: Replacement of the 1981 Grumman White Expediter II Tanker Pumper that was originally purchased as a reserve pumper in 1981. lIDs vehicle has been in service for 18 years as a reserve unit and a special call unit for areas that have no fire hydrants. 11lls is due to its large water carrying capacity 1300 gallons, most pumpers carry only 750 gallons. lIDs unit will be surplused. . Staff/Personnel: No additional personnel is associated with this project OperationIMaintenance: Replacement vehicle - No additional operations or maintenance costs Capital Outlay: $ 280,000 TOTAL: $ 280,000 RELATIONSHIP TO OTIlER PROJECfSIPLANS AND THE COMPREHENSIVE PLAN: None PROPOSED METI-IOD OF FINANCING: General Fund - Vehicles . 1999-2000 CAPITAL OUTLAY PROJECT REQUEST FORM DEP ARTMENT: Fire PROJECT NAME: Building of Fire Station # 3 LOCATION: SR 434 and Creeks Bend subdivision area SERVICE AREA: SR 434 North East end of the City PROJECf NUMBER: 02-2210-001 PROJECf PRIORITY: 4 IS PROJECf A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT: No CATEGORY CLASSIFICATION: Concurrency: Non-concurrency (Public Safety): X Other Services (Non-concurrency, Non-Public Safety): . DESCRIPTION I JUSTIFICATION FOR CAPITAL OUTLAY AND ANY ASSOCIATED OPERATING BUDGET IMPACT: The building of this 3rd fire Station is due to the proposed Commercial growth in the area of SR 434 near the Greenway. If this area should develop as we anticipate Fire Station # 2 will not be able to efficiently handle the additional call1oad in that area as well as have an acceptable response time of 5 minutes or less. This Fire Station would be the result of growth and we anticipate revenue from impact fees to help fund this project. StafflPersonnel: This Station would require 18 additional personnel Operation/Maintenance: Additional associated building maintenance and utilities charges Capital Outlay: $ 800,000 for the Station TOTAL: $ 800,000 plus maintenance, utilities and additional personnel RELATIONSHIP TO OTHER PROJECfSIPLANS AND TIlE COMPREHENSIVE PLAN: SR 434 commercial development PROPOSED METHOD OF FINANCING: General Fund and Impact fees . . . . 1999-2000 CAPITAL OUTLAY PROJECT REQUEST FORM DEP ARTMENT: Fire PROJECf NAME: Additional Engine for the new Station # 3 LOCATION: SR 434 and Creeks Bend subdivision area SERVICE AREA: SR 434 North East section of the City PROJECf Nill.1BER: 02-2210-002 PROJECf PRIORITY: 4 IS PROJECf A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT: No CATEGORY CLASSIFICATION: Concurrency: Non-concurrency (Public Safety): X Other Services (Non-concurrency, Non-Public Safety): DESCRIPTION I JUSTIFICATION FOR CAPIT AL OUTLAY AND ANY ASSOCIATED OPERATING BUDGET IMP ACf: The purchase of this new pumper is a result of proposed growth in the SR 434 corridor. Due to the location of Station # 2 at 850 Northern way we feel the response time to this area will be unacceptable and the call1oad will be increased. We anticipate commercial growth due the completion of the widening ofSR 434. This 3rd pumper will be serving this commercial area and will be serving as back up to the Tuscawilla area as well as the west side of the City, Stafflpersonnel: Personnel is projected in the New Station # 3 project OperationIMaintenance: Additional vehicle maintenance and operational cost will be anticipated. Capital Outlay: Pumper = $ 300,000 plus mnintenance and operational cost. Plus $45,000 for additional equipment needed to put the unit in service. TOTAL: $ 345,000 RELATIONSHIP TO OrnER PROJECTSIPLANS AND TIlE COMPREHENSIVE PLAN: SR 434 commercial development PROPOSED METHOD OF FINANCING: . General fund and Impact fees . 1999- 2000 CAPITAL OUTLAY PROJECT REQUEST FORM DEP ARTMENT: Fire PROJECT NAME: Additional Rescue for the new Station # 3 LOCATION: SR 434 and Creeks Bend subdivision area SERVICE AREA: SR 434 North East section of the City PROJECT NUMBER: 02-2210-003 PROJECT PRIORITY: 4 IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT: No CA TEGOR Y CLASSIFICATION: Concurrency: Non-concurrency (Public Safety): X Other Services (Non-concurrency, Non-Public Safety): . DESCRIPTION / JUSTIFICA nON FOR CAPITAL OUfLA Y AND ANY ASSOCIATED OPERATING BUDGET IMPACf: The purchase of this new rescue is a result of proposed growth in the SR 434 corridor. Due to the location of Station # 2 at 850 Northern Way we feel the response time to this area will be unacceptable and the call load will be increased. We anticipate commercial growth due the completion of the widening ofSR 434, This 3rd rescue will be serving this commercial area and will be serving as back up to the Tuscawilla area as well as the west side of the City. Staff7Personnel: Personnel is projected in the New Station # 3 project. OperationIMaintenance: Additional vehicle maintenance and operational cost will be anticipated. Capital Outlay: Rescue = $ 150,000 plus maintenance and operational cost. Plus $40,000 for additional equipment needed to put the unit in service, TOTAL: $ 190,000 RELATIONSHIP TO OTHER PROJECTS / PLANS AND THE COMPREHENSIVE PLAN: SR 434 commercial development PROPOSED METHOD OF FINANCING: General fund and Impact fees . Incorporated ~ 1959 ~~ \oRtD~ FISCAL YEAR 1999/2000 ~~ DANIEL J. KERB, CHIEF OF POLICE 1 1 ii (~~ ,~ 7 . . . CAPITAL OUTLAY PROJECTS Project Item Year 1 Year 2 Year 3 Year 4 Year 5 Total FY 99/2000 FY 2000/01 FY2001/02 FY2002l03 FY2003/04 Police HeadQuarters Expansion $0,00 $0,00 $165,000.00 $0,00 $0.00 $165,000.00 Vehicle Replacement $0.00 $0.00 $104,000,00 $104,000,00 $104,000.00 $312,000,00 TOTAL $0.00 $0.00 $269,000.00 $104,000.00 $104,000,00 $477,000,00 Operating Impact Total Police HeadQuarters Expansion $0.00 $0.00 $0,00 $0,00 $0.00 $0.00 Increases for maintenance & repairs of building, utility, telephone, ianitorial, and office supplies TOTAL $0,00 $0,00 $0,00 $0.00 $0,00 $0,00 Revenue Source Total Impact Fees $0,00 $0.00 $165,000.00 $0,00 $0,00 $165,000,00 General Fund $0.00 $0.00 $104,000.00 $104,000.00 $104,000,00 $312,000.00 TOTAL $0,00 $0.00 $269,000.00 $104.000.00 $104,000.00 $477.000,00 Approval Date: Start Date: Completion Date: 1999-2000 . CAPITAL OUTLAY PROJECT REQUEST FORM DEPARTMENT: Police PROJECT NAME: Public Safety Complex .Expansion LOCA nON: 300 North Moss Road SERVICE AREA: 300 North Moss Road PROJECT NUMBER: 00-2110-002 PROJECT PRIORITY: 4 IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT: NO CATEGORY CLASSIFICATION: Concurrency: Non-concurrency (Public Safety): X Other Services (Non-concurrency, Non-Public Safety): . DESCRIPTION / JUSTIFICA nON FOR CAPITAL OUTLAY AND ANY ASSOCIATED OPERATING BUDGET IMPACT: The continuing growth of the City will require the Police Department to increase the level of service provided to meet the needs of the community, This increase will take the form of new programs created to enhance the Community Policing philosophy, as well as increasing personnel in current services to meet expected increases in calls for service and investigation, To meet these needs, the Police Department must complete the unfinished space of the facility, which were planned for future needs and partially constructed at: the time the structure was built. Due to the age of the fleet and the number of miles the vehicles travel each year there will be a need to replace 5 vehicles a year starting FY 2001/2002, Each vehicle will cost $20,800,00 with a total cost of $104,000,00 per year, Staffi'Personnel: The Police Department is currently exploring new ways to provide additional services or improve existing services to the community, This project deals with workspace that will be needed for personnel who will already be in place at the time the expansion is needed. No additional personnel needs are associated with this project. OperationlMaintenance: JIncrease in the finished areas of the facility will require corresponding increases for additional telephone service, utility expenses, repair and maintenance of the building, janitorial supplies, and offIce supplies. Based on current figures available, the projected increases would total $14,400 for the first year, and then recur for the following years as increases in the annual budget. Capital Outlay: $477,000.00 . TOTAL: $477,000.00 RELATIONSHIP TO OTHER PROJECTS / PLANS AND THE COMPREHENSIVE PLAN: None PROPOSED METHOD OF FINANCING: Public Safety Impact F(:es General Fund FISCAL YEAR 1999/2000 CHUCK PULA, PARKS & RECREATION DIRECTOR 1 ~~ ~,~ . . CITY OF \Iv.. ,.=R SPRINGS PARKS AND RECREATION DEPARTMENT CAPITAL IMPROVEMENT PROGRAM . Project # " .... J~roJ~'.-"":~~,:?:/:,/:~i,';;t i~'~:~~1~~~;:1 t~~~i~obj'j :;::i~1~~lJ~;t ,:;i~~~;t6~; ~;!~~~~1i:~~': ;::f.:,~~~::'\::{;J37~~!"J)'~.'~'... '. .oP(!~t,il'lg . .~. Totals - ..,.:..,.......~~~:~\; ': ;" '1~pact, .' . :: C' .....;. ..'......:' .," /..'.'C :!: :':',;;","\'~'::..:.".;\ :.".' . . Central Winds Park $ 170,000 Bond $ 8,500 $ 178,500 Moss Park $ 510,000 Bond $ 25,500 $ 535,500 Sam Smith Park $ 270,000 Bond $ 13,500 $ 283,500 Sunshine Park $ 430,000 Bond $ 21,500 $ 451,500 Trotwood Park $ 680,000 Bond/FRDAP Grant $ 34,000 $ 714,000 T orcaso Park $ 400,000 Bond $ 20,000 $ 420,000 Winding Hollow Park $ 140,000 Bond $ 7.000 $ 147,000 Central Winds Parking Lot Re-Pave $ 30,000 General Fund $ - $ 30,000 F-250 Class Pickup Truck $ 25,000 General Fund $ 1,250 $ 26,250 Lighting for Soccer Fields $ 300,000 Rental Fees x 10yrs. $ 15,000 $ 315,000 Community Center Land Acquisition $ 150,000 Gen Funds/Grant $ - $ 150,000 John Deere Reel Mower $ 32,000 General Fund $ 1,610 $ 33,610 Truf Vacumn Agi-Meter $ 10,800 General Fund $ 500 $ 11,300 T oro Top Dresser $ 10,500 . General Fund $ 500 $ 11,000 Community Center $1,500,000 Bond Issue $ 75,000 $ 1,575,000 John Deere 60" Deck Mower $ 15,000 General Fund $ 750 $ 15,750 Ford F150 4x2 Extended Cab $ 25,500 General Fund $ 1,275 $ 26,775 Toro Sand Pro $ 13,000 General Fund $ 650 $ 13,650 New Irrigation System CWP $ 75,000 General Fund $ 3,750 $ 78,750 New Playground CWP $ 75,000 General Fund $ 375 $ 75,375 VermeerTurbo Brush Chipper $ 25,000 General Fund $ 1,250 $ 26,250 CWP Swimming Pool $ 2,500,000 Bond/Grants $ 125,000 $ 2,625,000 T oro Work Cart w/PTO $ 18,000 General Fund $ 900 $ 18,900 TOTALS $ 2,955,000 $ 203,300 $ 1,553,500 $ 175,000 $ 2,518,000 $ 357,810 $ 7,762,610 PROPOSED PROJECT EXPENrnTURES BY YEAR Prcip .xls 8/17/99 . 1999-2000 CAPIT AL IMPROVEl\'IENT PROJECT REQUEST FORM DEP ARTl\1ENT: PARKS AND RECREATION PROJECT NAME: Local Parks Construction and Renovation Projects LOCATION: Trotwood, Torcaso, Moss, Sunshine, Sam Smith, Central Winds Park and Winding Hollow Park SERVICE AREA: Entire City PROJECT NUMBER: PROJECT PRIORITY: 1 IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? Yes CATEGORY CLASSIFICATION: Concurrency: Yes . Non-concurrency: Other Services: (Non-concurrency, Non-Public Safety): DESCRIPTION /JUSTIFICA TION FOR CAPITAL IMPROVEMENT AND ANY ASSOCIA TED OPERATING BUDGET IMPACT: These parks are now serving at best 20% or less as they could. Most are old and in ill repair. Also new construction is needed for the expanding youth baseball and soccer programs. RELATIONSHIP TO OTHER PROJECTS/PLANS AND THE COMPREHENSIVE PLAN: Not necessary as existing parks are justified as primary in the inventory of service. PROPOSED METHOOD OF FINANCING: 1.4 Million from bonds and $200,000.00 FRDAP Grant for Trotwood park. $300,000.00 from rental fees over 10 years for soccer field lighting. . e FISCAL YEAR 1999/2000 KIPTON LOCKCUFF, P.E. ~ UTILITY/PUBLIC WORKS DIRECTOR ~ . . . I I I I I I I I WATER & SEWER REVENUE GENERATION FUND - FUND BALANCE FY94 FY95 FY98 FY97 FY98 FY99 FYOO FY01 FY02 FY03 FY04 FYOS AC1\JAL. ACTUAL ACTUAL ACTUAL. ACTUAL CURRENT PROPOSED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED =JBl~ lITV REVENUES: INTEREST $5,970 $8,542 $0 $0 $0 $8,500 $9,500 $0 $0 $0 $0 $0 $50,. $51,313 $37.353 $58,706 $59,480 $51.008 $51.008 $51.ooe $51,008 $51,006 $51,006 $51.006 TOTA!. REVENUES $56.. $59.855 $37.353 $58,706 $59.480 $59,506 $60,506 551,006 $51,006 $51,006 $51,006 $51,006 PERCENT INCREASE .o.301L 5,32'11. -80.24'1(, 38.3~ 1~ 0,04" 1.65'1(, -18,63'1(, 0,00'1(, O.QO'I(, 0.00% 0.00'1(, EXPENSES: ICAPlTAL OUTlAY SO $0 $0 $0 $0 $33,387 $0 $100.000 $550,000 $50,000 $50,000 $50,000 TOTAL EXPENSES $0 $0 SO $0 $0 533,387 $0 $100,000 $550.000 $50,000 $50,000 $50.000 PERCENT INCREASE 0,00'1(, 0.00'1 0.00'll. O,()()'l(, 0.00'l6 100,QO'I(, 0.00'lf. 100.QO'I(, 81.82'll. -1000,00% o .QO'I(, O,OO'l(, REVENUES OVER (UNDER) EXPENSES $56,_ $58.855 $37.353 $58,706 $58,480 $28,119 $60.506 ($48.994) ($498,994) $1.006 $1.006 $1,006 BEGINNlNO FUND BALANCE $211,183 $267,851 $327,706 $365.059 $423,765 $483.245 $509,364 5569,870 $520,876 $21,882 $22.888 $23,694 ENDING FUND BALANCE $267.851 $327,706 $385,059 $423.765 $483,245 $509,364 $569,870 $520.878 $21,882 $22,888 $23,894 $24,900 8f2O/99 Sheet 14 . . . I I WATER AND SewER UTlUTY RENEWAL AND REPACEMENT FUND - FUND BALANCE FY98 FY99 FYOO FY01 FY02 FY03 FY04 FY05 ACTUAL CURRENT PROPOSED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED P ~AND~ & DlI:DI . FUND REVENUES: INTEREST $4,503 $4,800 $4,800 $0 $0 $0 $0 $0 !NTERFUND TRA.tllSFERS-IN $12,754 $126 574 S140.310 $235,000 $100,000 $100,000 $100,000 $100,000 TOTAL REVENUES $17;157 $131,374 $145,110 $235,000 $100,000 $100,000 $100,000 $100,000 PERCENT INCREASE -1.00% 86.86% 9.47% EXPENSES CAPITAl OUTlAY $35,690 $122,000 $112,000 $235,000 $100,000 $100,000 $100,000 $100,000 INTERFUND TRANSFERS-OUT $0 $9,374 $0 $0 $0 $0 $0 $0 TOTAL EXPENSES $35,690 $131,374 $112,000 $235,000 $100,000 $100,000 $100,000 $100,000 I PERCENT INCREASE 0.00% REVENUES OVER (UNDER) EXPENSES $0 $0 $33,110 $0 $0 $0 $0 $0 BEGINNING FUND BALANCE $260,429 $278,862 $288,236 $321,346 $321,346 $321,346 $321,346 $321 ,346 ENDING FUND BALANCE $278,862 $288,236 $321,346 $321,346 $321,346 $321,346 $321,346 $321,346 ~1I6 . . . PUBLIC WORKS - GENERAL FUND PROPOSED EQUIPMENT EXPENDITURES BY YEAR Pro ect am. $0 Prior Vehicles Dum Truck TOTAL $97 000 $22 000 $0 o PROPOSED EQUIPMENT REVENUE SOURCE BY YEAR Revenue ProJect projected Year 1 Year 2 Yur3 Year 4 YearS Total Prior Source Number 99/00 00/101 General Fund 02-4410-03 $22000 $0 $22,000 $0 $44 000 General Fund 02-4410-02 $75 000 $0 $0 $0 $75000 TOTAL $0 $0 $97 000 $0 $22.000 $0 $119.000 Approval Date: Start Date: Completion Date: 713OJ9N798CIP .XLS ) .' .J ) ) . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Public Works PROJECT NAME: Vehicles LOCATION: Administration SERVICE AREA: City PROJECT NUMBER: #02-4410-03 PROJECT PRIORITY: Replacement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? ') No DESCRIPTION/JUSTIFlCA nON: This is for the replacement of Public Works operations vehicles. The fund source for the replacement of one vehicle per year is alternated between General Fund and the Transportation Improvement Fund. RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: No relationship with other projects. PROPOSED METHOD OF FINANCING: General Fund .i .' ..J IMPACT ON OPERATING BUDGET BY YEAR: Staff7Personnel $0 OperationlMaintenance $3,500 Capital Outlay $66,000 TOTAL: $69,500 Offsetting Revenue: $0 NET OPERATING IMPACT: $69,500 IMPACT ON REVENUE: No impact on revenue, 6117199-xx-4410.03.wpd eJ ::......, ! . \ . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Public Works PROJECT NAME: Dumo Truck LOCATION: Administration SERVICE AREA: City PROJECf NUMBER: #02-4410-02 PROJECf PRIORITY: Replacement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No DESCRIPTION/JUSTIFICA TION: This is for the replacement of the Public Works dump truck. The existing 12 yard tandem axle dump truck was purchased in 1987 and needs to be replaced. RELA TIONSHlP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: No relationship with other projects, PROPOSED METHOD OF FINANCING: General Fund ) . ./ ) .) IMPACT ON OPERATING BUDGET BY YEAR: Staff!Personnel $0 OperationIMaintenance $0 Capital Outlay $75,000 TOTAL: $75,000 Offsetting Revenue: $0 NET OPERATING IMPACT: $75,000 IMPACT ON REVENUE: No impact on revenue. 6/J0I99-02-44I 0-2.wpd . . . I I I I I I I I I I I I I I I I I I I I I I STORMWATER UTILITY FUND - FUND BALANCE I I I I FY94 FY95 FY96 FY97 FY98 . FY99 FYOO FYOl FY02 FY03 FY04 FY05 I I ACTUAl ACTUAl ACTUAl ACTUAl ACTUAl CURRENT PROPOSED PROJECTED . P.ROJECTED PROJECTED PROJECTED PROJECTED STORMWATER UTItTY FUND REVENUES: I INTEREST $4,564 $9,019 $5,896 $2,197 $2,586 $1,300 $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 USER CHARGES $285,591 $288,419 $298,562 $318,480 $325,453 $360,000 $360,000 $340,000 $345,000 $350,000 $355,000 $360,000 I TOTAl REVENUES I $290,155 $297,438 S304,458 $320,677 $328,039 $361,300 $381,000 $341,000 $346,000 $351,000 $356,000 $361,000 PERCENT INCREASE 44.16% 2.45" 2.36%. 5.33% 2.30% 10.14% -0.08" -5.54" 1.47" 1.45% 1.42% 1 .4O'llo I EXPENSES I CAPITAl PROJECTS $0 $36,319 $219,en $122,273 $128,142 $45,639 $90,000 $30,000 $126,000 $122,000 $98,000 $92,000 RECURRING EXPENSES $n,51 0 $318,631 $207,108 $197,452 $255,396 $245,194 $301,661 $250,000 $250,000 $250,000 $250,000 $250,000 EQUIPMENT I $0 $24,000 $55,000 $55,000 $55,000 $0 $0 I TOTAl EXPENSES I $n,51 0 $354,950 $427,078 $319,725 $383,538 $290,833 $415,661 $335,000 $431,000 $427,000 $348,000 $342,000 I PERCENT INCREASE -21.61" 357.94" 16.89'l(, -33.58" 16.64% -31.88% 30.03" -24.08" 22.27" -094% -22.70"A> -1.75% I REVENUES OVER(UNDER) EXPENSES $212,645 ($57,512) ($122.620) $952 ($55,499) $70,467 ($54,661 ) $6,000 ($85,000) ($76,000) $8,000 $19,000 I I BEGINNING FUND BALANCE $75,453 $288,098 $230,586 $107,966 $108,918 $53,419 $123,886 $69,225 $75,225 ($9,775) ($85,n5) (sn,775) I I ENDING FUND BALANCE $288,098 $230,586 $107,966 $108,918 $53,419 $123,886 $69,225 $75,225 ($9,775) ($85,775) ($77,775) ($58,775) I I ~ I I 7130199-SHEET 3 I I . . . '- -' STORMWA TER UTILITY PROPOSED PROJECT EXPENDITURES BY YEAR Project Project Projected Year 1 Year 2 Year 3 Year 4 Year 5 Total Prior Name Number 99100 00101 01/02 02103 03/04 04/05 Wade StTrash Removal Structure 00-4413-01 $90 000 $90 000 No Name Creek Swale & Culver1B 05-4413-06 $92,000 $92 000 Little Lake Howell RCP Culvert 01-4413-02 $30 000 $30 000 little Lake Howell Box Culvert 02-4413-03 $126 000 $126000 Gee Creek Sedimentation Pond 03-4413-04 $122 000 $122000 No Name Creek Drainaae Swales 04-4413-05 $98 000 $98,000 TOTAL $90 000 $30.000 $126.000 $122 000 $98 000 $92.000 $558.000 $0 PROPOSED PROJECT REVENUE SOURCE BY YEAR Revenue Project Pr Year 1 Year 2 Year 3 Year 4 Year 5 Total Prior Source Number 99100 00101 01/02 02/03 03104 04105 Stormwater Utilitv Fee 00-4413-01 $90 000 $90,000 Stormwater UbTrtv Fee 05-4413-06 $92,000 $92,000 Stormwater Utility Fee 01-4413-02 $30 000 $30 000 Stormwater Utility Fee 02-4413-03 $126,000 $126,000 Stormwater Utility Fee 03-4413-04 $122000 $122 000 Stormwater Utility Fee 04-4413-05 $98,000 $98,000 TOTAL $90.000 $30.000 $126.000 $122 000 $98 000 $92.000 $558.000 $0 . . . STORMWATER unUTY PROPOSEDEQ~MENTEXPENorrURES8YYEAR Equipment Project Profected Year 1 Year 2 Year 3 Year 4 Year 5 Total Prior Name Number 99/00 00101 01102 02103 03104 04105 MultiPuniOse Vehicle 01-4413.10 $42.000 142.000 Vac Con 01-4413-11 $55.000 $55.000 $65 000 $185000 Bobcat 00-4413-12 $24,000 $24,000 TOTAL $24 000 $97000 $55000 $55.000 $0 $0 $231 000 $0 PROPOSED EQUIPMENT REVENUE SOURCE BY YEAR Revenue -~. Year 1 Year 2 Year 3 Year 4 YearS Total Prior Source Number 99/00 00101 01102 02103 03104 04105 Stormwater utilffV Fee 01-4413-10 k2.000 542.000 Stormwater 0tiJitV Fee 01-4413-11 $55.000 $55.000 $55 000 $185 000 Stormwater Utility Fee 00-4413-12 $24,000 $24,000 TOTAL $24.000 $97.000 $55.000 $55.000 $0 $0 $231.000 $0 Approval Date: Completion Date lWlW8 9Hi~IP.JCLS .1 CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Public WorkslStonnwater PROJECT NAME: Wade Street Trash Removal Structure LOCATION: Cross Creek at Wade Street SERVICE AREA: City PROJECT NUMBER: #00-4413-01 .. ,.., PROJECT PRIORITY: Planned Addition .) IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUmEMENT? No CATEGORY CLASSIFICATION: Other Services DESCRlPTION/JUSTIFICA TION: This project provides for the installation ofa.trash removal structure in an existing drainage channel known as Cross Creek for compliance with NPDES permit conditions. The trash structure will capture debris from storm-water runoff prior to discharge to surface waters. The project will be partially funded by a $30,000.00 grant from The St. Johns River Water ) Management District's Stonnwater ManagementCost-Sharing Program. . ) .' RELA TIONSHIP TO OTHER PROJECTfPLANS AND THE COMPREHENSIVE PLAN: Corrects an existing deficiency PROPOSED METHOD OF FINANCJNG: Stormwater Utility Fee IMP ACT ON OPERA TJNG BUDGET BY YEAR: StafflPersonnel $ 0 OperationIMaintenance $ 0 ,\ I Capital Outlay $ 90,000 ) TOTAL: $ 90,000 . Offsetting Revenue: $ 0 NET OPERATING Il\1P ACT: $ 90,000 IMPACT ON REVENUE: No impact on revenue. ) 00-4413-Ol.wpd 5/18/99 . . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Public WorkslStonnwater PROJECT NAME: No Name Creek Swale & Culvert Improvements LOCA TION: Ranchlands SERVICE AREA: City PROJECT NUMBER: #05-4413-06 PROJECT PRIORI1Y: Planned Addition IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT ? No . CATEGORY CLASSIFICATION: Other Services DESCRIPTION/JUSTIFICA nON: This project is for the construction of positive drainage swales with culverts, and the installation of additional culverts at selected sites in the Ranchlands. This project was identified in the Stormwater Master Plan 5 Year CIP. RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: .> . Adopted in the Stonnwater Master Plan, PROPOSED METHOD OF FINANCING: Stormwater Utility Fee .: "'....,) . .> .) IMPACT ON OPERATING BUDGET BY YEAR: Staft/Personnel $0 Operation/Maintenance $0 Capital Outlay $92,000 TOTAL: $92,000 Offsetting Revenue: $0 NET OPERATING IMPACT: $92,000 IMPACT ON REVENUE: No impact on revenue, OS-4413-06.wpd S/19/99 . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEP ARTMENT: Public WorkslStormwater PROJECT NAME: Little Lake Howell RCP Culvert LOCATION: Oak Forest - Chokecherry Drive SERVICE AREA: City PROJECT NUMBER: #01-4413-02 PROJECT PRIORITY: Planned Addition IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No . CATEGORY CLASSIFICATION: Other Services DESCRIPTION/JUSTIFICA TION: This project is for the construction of an additional culvert for added flow from the tributary to Little Lake Howell Creek from Dunmar Estates. This project was identified in the Stormwater Master Plan 5 Year CIF, RELATIONSHIP TO OTHER PROJECfIPLANS AND THE COMPREHENSIVE PLAN: Adopted in the Stormwater Master Plan. ) PROPOSED METHOD OF FINANCING: Stormwater Utility Fee . . ,) . ) . IMPACT ON OPERATING BUDGET BY YEAR: Staftlpersonnel $0 OperationIMaintenance $0 Capital Outlay $30,000 TOTAL: $30,000 Offsetting Revenue: $0 NET OPERATING IMPACT: $30,000 IMPACT ON REVENUE: No impact on revenue. o 1-4413'{)2. wpd 5/18//99 . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Public WorkslStormwater PROJECT NAME: Little Lake Howell Box Culvert Replacement LOCA TION: Oak Forest -Winter Springs Boulevard SERVICE AREA: City PROJECT NUMBER: #02-4413-03 PROJECT PRIORITY: Replacement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No . CATEGORY CLASSIFICATION: ',," ..\ Other Services DESCRIPTIO N/JU STIFICA TION: This project is for the replacement of the existing culverts and headwalls with a double 3' X 61 box culvert for additional capacity. This project was identified in the Stormwater Master Plan 5 Year ClP. RELATIONSHIP TO OTHER PROJECfIPLANS AND THE COMPREHENSIVE PLAN: Adopted in the Stormwater Master Plan. PROPOSED METHOD OF FINANCING: ) . Stormwater Utility Fee . . ) . IMPACT ON OPERATING BUDGET BY YEAR: Statl7Personnel $0 OperationlMaintenance $0 , Capital Outlay TOTAL: Offsetting Revenue: $126,000 $126,000 $0 NET OPERATING IMPACT: $126,0 00 IMPACT ON REVENUE: No impact on revenue, 02-4413.oJ.wpd 5/18199 . .l . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEP ARTMENT: PROJECT NAME: LOCATION: Public WorkslStormwater Gee Creek Sedimentation Pond Moss Road Bridge over Gee Creek SERVICE AREA: City PROJECT NUMBER: #03-4413-04 PROJECT PRIORITY: Planned Addition IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No CATEGORY CLASSIFICATION: Other Services DESCRIPTION/JUSTIFICA TION: This project is for the construction ofa sedimentation/stonn water pond upstream of the Moss Road bridge to prevent further siltation of the Gee Creek channel. This project was identified in the Stormwater Master Plan 5 Year CIP, RELA TIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: Adopted in the Stormwater Master Plan. PROPOSED METHOD OF FINANCING: ) Stormwater Utility Fee . . 'j . ) . IMPACT ON OPERATING BUDGET BY YEAR: Staff/Personnel $0 OperationlMaintenance $0 Capital Outlay $122,000 TOTAL: $122,000 Offsetting Revenue: $0 NET OPERATING IMPACT: $122,000 Il\1PACT ON REVENUE: No impact on revenue. 03-44 I3~4wpd 5/18199 . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Public WorkslStormwater PROJECT NAME: No Name Creek Draina1!e Swales LOCA TION: North Orlando Sections 2 and 2A SERVICE AREA: City PROJECT NUMBER: #04-4413-05 PROJECT PRIORITY: Repair/Replacement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No . CATEGORY CLASSIFICATION: Other Services DESCRIPTION/JUSTIFICA TION: This proj~ct is for the regrading and reshaping of the roadside drainage swale system in North Orlando Sections 2 and 2A. The swale drainage system is approximately twenty years old and has been altered from the original design by the development of the homes in this area. This project was identified in the Stormwater Master Plan 5 Year CIP, RELA TIONSHIP TO OTHER PROJECT/PLANS AND THE COMPREHENSIVE PLAN: ) . Adopted in the Stormwater Master Plan. . . "l . ) . PROPOSED METHOD OF FINANCING: Stormwater Utility Fee IMPACT ON OPERATING BUDGET BY YEAR: Stafflpersonnel $0 OperationIMaintenance $0 Capital Outlay $98,000 TOTAL: $98,000 Offsetting Revenue: $0 NET OPERA TING IMPACT: $98,000 IMPACT ON REVENUE: No impact on revenue, 04-4413..()j,wpd 5118199 . .J .) CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: PROJECT NAME: LOCA nON: SERVICE AREA: PROJECT NUMBER: ROJECT PRIORITY: Public WorkslStonnwater Multi Purpose Vehicle Administration City 01-4413-10 Planned Addition IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No DESCRIPTION/JUSTIFICATION: The multi purpose vehicle is needed for the maintenance of stonnwater facilities, Many of the facilities are off-road in difficult areas to access. We are limited in our current capability to perform this task due to space entry difficulties and manpower limitations. This unit's capabilities permit the operator to access the sites quickly and to work effectively in these restricted areas. RELATIONSHIP TO OTHER PROJECT/PLANS AND THE COMPREHENSIVE PLAN: None PROPOSED MEmOD OF FINANCING: Stormwater Utility Fee .) .) . .) IMPACT ON OPERATING BUDGET BY YEAR: Staff/Personnel $0 OperationIMaintenance $0 Capital Outlay $42,000 TOTAL: $42,000 Offsetting Revenue: $0 NET OPERATING IMPACT: $42,000 IMPACT ON REVENUE: No impact on revenue, 00-4413-Ol.wpd . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Public WorkslStormwater PROJECT NAME: Vacuum Storm Drain C/eQnerUn;t LOCATION: Administration SERVICE AREA: City PROJECT NUMBER: 01-4413-11 ROJECT PRIORITY: Planned Addition IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No . DESCRIPTION/JUSTIFICATION: The storm drain vacuum cleaning unit is needed for the removal of sand and debris from the gravity storm drain manholes and collection points. We are limited in our current capability to perform this task due to space entry regulations and manpower liriritations. This vacuum unit removes materials by sucking them into a vacuum tank. All cleaning operations can be performed from the surface by a single individual. RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: None PROPOSED MEmOD OF FINANCING: Stormwater Utility Fee . . . . IMPACT ON OPERATING BUDGET BY YEAR: StatI7Personnel $0 Operation/Maintenance $ 1,000 Capital Outlay $164,000 TOTAL: 5165,000 ($55,OOO/yr for 3 years) Offsetting Revenue: $0 NET OPERATING IMPACT: (5165,000) IMPACT ON REVENUE: No impact on revenue, 00-4413~ l.wpd . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: PROJECT NAME: LOCATION: SERVICE AREA: PROJECT NUMBER: ROJECT PRIORITY: Public W oiks/Stormwater Bobcat Administration City 01-4413-12 Planned Addition IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? . No DESCRIPI10N/JUSTIFICA TION: A Bobcat (small skiploader) is needed for the maintenance of stormwater facilities, We are limited in our current capability to quickly perform the task ofloadinglunloading trucks and trailors and to perform pick-up operations due to space difficulties and manpower limitations. This unit's capabilities permit the operator to load and unload vehicles quickly and to work effectively in moving heavy objects in restricted areas, RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: None PROPOSED MEmOD OF FINANCING: Stormwater Utility Fee . . IMPACT ON OPERATING BUDGET BY YEAR: Staft7Personnel $0 Operation/Maintenance $0 Capital Outlay $24,000 TOTAL: $24,000 Offsetting Revenue: $0 NET OPERATING IMPACT: $24,000 IMPACT ON REVENUE: . No impact on revenue, 004413-12-7130J99,wpd . .- . -----. .-. -;,.' .- PROPOSED POTABLE WATER PROJECT EXPENOIT IRES BY YEA R Project Project Current ProJected Year 1 YUl2 Vear3 Veal' 4 Yllarei Total Name NumMr 9811S tSIOO 0010 1 01102 02103 03104 04105 Tu&kBYiIlIa Road Wlllllf Lilla 00-3600.18 $2:50 000 $250 000 CllloOOe Conv, To Liquid G WTP#2 00-3600-:58 $30,000 $30,000 Rani WTPll Chlorlnll Eouln OQ..3600-57 $25,000 $25,000 WTPI1 Brlck wen 00-3800-:58 $40,000 $40,000 1wrPt2-#3 WeR EmeraellCV POWIlr 00-3800-:59 $20,000 $20,000 Test WaU'4 QO.3699-60 $10,000 $10,000 WTPI1 Stontge Tenk Oomll RSSlHfaclng 01-3600.11 $25,000 525,000 WTP#1,2&3 Chlor1nll Convel'$lon 03-3600-03 $250,000 ~,ooo IvJelIl4 WT?# 1 East 02-3800-12 $250,000 szso,OQO \VfP#1 Pecked TOWll~ 04-3600-02 $2,000,000 $2,000,000 Addnlonel Pumos lIlld Conlrols WTPtl 05.3800-10 $12:5,000 5125,000 TOTAl. TOTAl. SO $376,000 125,000 $260,000 $260,000 $2.000,000 $125,000 $3,026,000 .. PROPOSED PROJECT REVENUE SOURCE BY YEAR R....enue Project CUlTellt Pro/ec:1IMI Year 1 y.., 2 Yur3 Veal' .. Yur 5 Total Source Number 98I9lI i9I'OO OCW1 01102 02J03 03104 04101 , U,C.F. 00-3600-18 $2:50,000 5250,000 U,E.F, 00-3600-:56 $30,000 $30,000 U,E.F, 00-3600-57 $25,000 $25,000 U.E.F, 00-3600-58 $40,000 $40,000 U.E.F. 00-3600.59 $20,000 520,000 U.E.F. 00-3600-60 $10,000 510,000 RlIlRF 01-3600-11 $2:5.000 $25,000 U.E,F, 03-36OO-a3 $250,000 $250,000 U.E.F, 02-3&00-12 $250,000 $250,000 U.E.F. 0~2 $2.000,000 $2.000,000 U,E.F, 05-3600.10 $125,000 $125,000 TOTAL TOTAL. SO $376,000 S21,ooo $2SO,ooo $260,000 S2,OOO,ooo 5125,000 $3,025,000 Approvel Dele: Completion Dele: ~198OP.xlS . , ':'>J . ) ) . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Utility PROJECT NAME: Tuskawilla Road Utilitv Improvements LOCA nON: Tuskawilla Road SERVICE AREA: . City PROJECT NUMBER: #00-3600- 18 PROJECT PRIORITY: Planned Expansion IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No DESCRIPTION/JUSTIFICA nON: This project is to install water main extensions, force main crossings, reclaimed water line crossings and future sleeves during the construction ofTuskawilla Road. This project will be incorporated into the County's roadway construction job. RELATIONSHIP TO OTHER PROJECfIPLANS AND THE COMPREHENSIVE PLAN: This project will be constructed in conjunction with Seminole County's Tuskawilla Road improvements. PROPOSED METHOD OF FINANCING: :.' Capital - Utility Construction Fund, . , .. ) .. IMPACT ON OPERATING BUDGET BY YEAR StaIDPersonnel $0 $0 $250,000 $250,000 $0 Operation/Maintenance Capital Outlay TOTAL: Offsetting Revenue: NET OPERATING IMPACT: $250,000 IMPACT ON REVENUE: .. "1 No impact on revenue. 00-3600-16.wpd . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Utility PROJECT NAME: Chlorine Conversion @ WTP#2 WCA nON: 700 Sheoah Blvd. SERVICE AREA: West PROJECT NUMBER: 00-3600-56 PROJECT PRIORITY: Planned Experiment IS PROJECT A CAPITAL IM:PROVEMENT ELEMENT REQUIREMENT? No e) DESCRIPTION/JUSTIFICA nON: ) . Installing a liquid chJorine (sodium hypochJorite) system as the fint step in elimination gaseous chlorine. RELATIONSHIP TO OTHER PROJECTIPLANS AND TEE COMPREHENSIVE PLAN: Water plant improvement PROPOSED METHOD OF FINANCING: Capital - Utility Enterprise Fund. IMPACT ON OPERATING BUDGET BY YEAR: . . ) . StaIDPersonnel Operation/Maintenance Capital Outlay TOTAL: Offsetting Revenue: NET OPERATING IMPACT: IMPACT ON REVENUE: No impact on revenue. 00-3600-.56.wpd $0 $0 $30,000 $30,000 $0 ($30,000) 1 . ,..;.,:.,' " . i . ) ) . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Utility PROJECT NAME: Replace WTP#l Chlorine Equipment LOCATION: 851 Northern Way SERVICE AREA: East PROJECT NUMBER: 00-3600-57 PROJECT PRIORITY: Planned Replacement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No DESCRIPTION/JUSTIFICA nON: Replace the chlorine equipment at WTP #1 RELATIONSHIP TO OTHER PRO.rtCTIPLANS AND THE COMPREHENSIVE PLAN: Water plant maintenance PROPOSED MEmOD OF FINANCING: Capital - Utility Enterprise Fund, . IMPACT ON OPERATING BUDGET BY YEAR: Staff/PersoIUlel OperationIMaintenance Capital Outlay TOTAL: Offsetting Revenue: NET OPERATING IMPACT: IMP ACf ON REVENUE: . ,.) No impact on revenue. .. ) . 00-3600-S7wpd ) $0 $0 $25,000 . $25,000 $0 ($25,000) . ..::,...,,:.} ) . ) . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Utility PROJECT NAME: Water Treatment Plant #1 Brick Wall LOCATION: 851 Northern Way SERVICE AREA: East PROJECT NUMBER: 00-3600-58 PROJECT PRIORITY: Planned Improvement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No DESCRIPTION/JUSTIFICA nON: Replace the chain link fence and hedgerow with a brick waiL RELA TIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: Water plant improvement. PROPOSED METHOD OF FINANCING: Capital - Utility Enterprise Fund, ) . IMPACT ON OPERATING BUDGET BY YEAR: Staff/Personnel Operation/Maintenance Capital Outlay TOTAL: Offsetting Revenue: NET OPERATING IMPACT: IMPACT ON REVENUE: . .. .; No impact on revenue, . ) . 00-3600-~8wpd $0 $0 $40,000 $40,000 $0 ($40,000) ) . ....:'.::." ) . . CAPIT AL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Utility PROJECT NAME: Emer~encv Power Connection, WTP#2 & #3 Wells LOCATION: 110 West Bahama Rd. and 700 Sheoah Blvd, SERVICE AREA: West PROJECT NUMBER: 00-3600-59 PROJECT PRIORITY: Planned Improvement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No DESCRIPTION/JUSTIFICA nON: Install an emergency power cOlBnection on the wells at WTP #2 and WTP #3 so the emergency portable generator can operate the wells. RELA TIONSHIP TO OTHER PROJECf/PLANS AND THE COMPREHENSIVE PLAN: Emergency preparedness. PROPOSED METHOD OF FINANCING: .> Capital - Utility Enterprise Fund. I . . ) ) . IMPACT ON OPERATING BUDGET BY YEAR: Staff/Personnel OperationIMaintenance Capital Outlay TOTAL: Offsetting Revenue: NET OPERATING IMPACf: IMPACf ON REVENUE: ) No impact on revenue. 00-3600.59wpd $0 $0 $20,000 $20,000 $0 ($20,000) . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: PROJECT NAME: LOCA nON: SERVICE AREA: PROJECT NUMBER: PROJECT PRIORITY: Utility Test Well #4 WTP #1 East 00-3600-60 Planned Improvement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? .) No DESCRIPTlON/JUSTIFICA nON: Construct test well in preparation for the installation of well #4. RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: Planned potable water capital improv'ement. PROPOSED METHOD OF FINANCING: Capital - Utility Enterprise Fund. ) . . IMPACT ON OPERATING BUDGET BY YEAR: StatllPersonnel $0 Operation/Maintenance $0 Capital Outlay $10,000 TOTAL: $10,000 $0 ($10,000) Offsetting Revenue: NET OPERATING IMPACT: IMPACT ON REVENUE: . c-") No impact on revenue. . 00-3600-00.wpd ) . . CAPITAL IMPROVEMENT PROJECT REOUEST FORM DEPARTMENT: Utility PROJECT NAME: WTP #1 Storalle Ttlltk Dome Resurfacilu! LOCATION: WTP #1 - 851 Northern Way SERVICE AREA: City PROJECT NUMBER: #01 ~3600-11 PROJECT PRIORITY: Repair/Replacement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No . DESCRIYfION/JUSTIFICATION: This project is for the resurfacing of the interior dome of the one million gallon potable water storage tank at WTP # I, The concrete surface is beginning to spall and needs to be recoated. RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: This project will enable us to maintain the existing level of service and will extend the life of the storage tank. PROPOSED MEmOD OF FINANCING: Capital ~ Utility Renewal and Replacement Fund . . IMPACT ON OPERATING BUDGET BY YEAR Staff7Personnel $0 Operation/Maintenance $0 Capital Outlay $25,000 TOTAL: $25,000 Offsetting Revenue: $0 NET OPERATING IMPACT: ($25,000) . IMPAcr ON REVENUE: No impact on revenue. Ol.]600-11,wpd . ..' ~"'" ,..) .) ) . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: PROJECT NAME: LOCATION: SERVICE AREA: PROJECf NUMBER: PROJECf PRIORflY: Utility Chlorine Convet'$ion WTP #1 WTP #1 - 851 Northern Way City #03-3600-03 RepairlReplacement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No DESCRIPTlON/JUSTIFICA nON: Construct a liquid chlorine (sodium hypochlorite) feed and generation system to replace the gaseous chlorine system. RELATIONSHIP TO OTHER PROJECfIPLANS AND THE COMPREHENSIVE PLAN: Planned improvement. PROPOSED METHOD OF FINANCING: Capital - Utility Enterprise Fund -. . ) . IMPACT ON OPERATING BUDGET BY YEAR Sta.IDPersonnel $0 OperationIMaintenance $0 Capital Outlay $250,000 TOTAL: $250,000 Offsetting Revenue: $0 NET OPERA TING IMPACT: ($250,000) IMPACT ON REVENUE: No impact on revenue. 02-J600-0J,wpd . ,.-'.:. .) " e\ ) . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Utility PROJECT NAME: Water Supp/v Well #4 LOCATION: WfP #1 SERVICE AREA: City PROJECT NUMBER: #02-3600-12 ROJECT PRIORITY: Planned Expansion IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT: Yes DESCRDnnON/JUS~CATION: This project is for a fourth water supply well at WTP #1, that is located on Northern Way in Tuscawilla. This well is needed to ensure an adequate volume of water is available. This project has been postponed from its originally scheduled date because of pump improvements that were made to Well #1 increasing the pumping volume and delaying the need for Well #4, RELATIONSHIP TO OTHER PROJECf/PLANS AND THE COMPREHENSIVE PLAN: This project is identified in the CIE of the Comprehensive Plan, PROPOSED METHOD OF FINANCING Capital - Utility Enterprise Fund, . IMPACT ON OPERATING BUDGET BY YEAR Staff/Personnel $0 OperationIMaintenance $0 Capital Outlay $250,000 TOTAL: $250,000 Offsetting Revenue: $0 NET OPERATING IMPACT: $250,000 IMPACT ON REVENUE: . No impact on revenue, 02-J600-12.wpd ) . . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Utility PROJECT NAME: Packed Towers. WTP #1 LOCATION: WTP #1 - 851 Northern Way SERVICE AREA: City PROJECT NUMBER: #04-3600-02 PROJECT PRIORITY: IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? .,;.:,.",,; No \ . DESCRWTION/JUSTIFICATION: Construct packed towers at WTP # 1 which use air to remove hydrogen sulfide from the new potable water. This will reduce chlorine demand and improve the water taste and odor. RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: Water quality improvement project. . PROPOSED METHOD OF FINANCING: Capital - Utility Enterprise Fund ) \ . . . ) .l IMPACT ON OPERATING BUDGET BY YEAR Staff7Personnel $0 Operation/Maintenance $ 5,000 Capital Outlay $2,000,000 TOTAL: $2,000,000 $0 ($2,000,000) Offsetting Revenue: NET OPERATING IMPACT: IMPACT ON REVENUE: No impact on revenue, 04-360().()2. wpd . "j .- ) . CAPITAL IMPR.OVEMENT PROJECT REQUEST FORM DEPARTMENT: PROJECT NAME: LOCATION: SERVICE AREA: PROJECT NUMBER: PROJECT PRIORITY: Utility Additional PumDs and Controls-WTP #1 WTP #1 - 851 Northern Way East #05.3600-10 Repair/Replacement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No DESCRIPTION/JUSTIFlCA nON: Construct a fourth pump and associated controls at WTP # 1 RELA TIONSHIP TO OTHER PROJECfIPLANS AND THE COMPREHENSIVE PLAN: This project will enable us to maintain the existing level of service of potable water. PROPOSED METHOD OF FINANCING: Capital - Utility Enterprise Fund . IMPACT ON OPERATING BUDGET BY YEAR StaffJPersonnel $0 Operation/Maintenance $0 Capital Outlay $125,000 TOTAL: $125,000 Offsetting Revenue: $0 ....\ ...,.... NET OPERATING IMPACT: ($125tOOO) ..i IMPACT ON REVENUE: . No impact on revenue. 05.3600-10,wpd ) .) . PROPOafD SANITARY SEWER EXP&NDlTUREa r6Y YEAR '": Project YaI" Year 2 YIIlIt'3 nar4 YearS TofaI Numbel 8MJO 01102 02103 03104 04.105 Install Liner @ VWlRF 00-3600-19 $37,000 $37000 Replace Lampson BkMIer 00-3600-23 $30.000 $30,000 Lift Stillion a Plant OQ.36OO.27 $80,000 $80,000 $80,000 $240,000 T elemetry@$"80,OOOIyr EWRF Underground EIactricaI Rehab 00-3600-61 $25,000 $25,000 East WRF Sand Remowl 00-3600-62 $50,000 $50,000 Design East Force Main QO.36OO.63 $28,000 $28,000 Sewer Line Restoration C!l $1oo,OlXlIyr 00-3600-38 $!iO,ooo $100,000 $100,000 $100,000 $100,000 $100,000 $550,000 'WWRF SUrge Tank 01-3800-30 $900,000 $900,000 WWRF AIr Une Addition 01.3800-33 $5(1,000 $50,000 WWRF Plant 1 Painting 01.3800-37 $110.000 $110,000 WWRF Belt Pre8a 02.J600.34 $250,000 $250,000 EWWR Belt Press 02.3600-35 $250,000 $250,000 Scrubber for Gas Chlorine BIdg EWRF 02-3600-21 $100,000 $100,000 Sc;rubber b' Gas Chlorine Bldg 02.3000-22 $100,000 $100,000 WWRF Automatic Bar Screen EWRF Q3.38CX).20 $100,000 $100,000 West Force Main Rerouting 05-3600-24 $105,000 $105,000 East Force Main Rerouting 05-3600-28 $150,000 $150,000 TOTAL S3OO,ooo " ,240,000 S880,ooo S2OCI.ooo "00,000 1355.000 $3,075.000 . . . I"ROPOSED PROJECT REVENUE SOURCE ~, 'fEAR . Raw.nue project Projected Year 1 Vear 2 Year 3 Vear 4 Vear 5 Total SocIRe Number - 00101 00f02 02103 03104 04J05 U.E.F. 00-J600.19 $37,000 $37,000 Rti)RF 00-3600-23 $30,000 $30,000 U.E.F. 00-3600-27 $80,000 $80,000 $80,000 $240,000 U.E.F. QO-36OO.61 $25,000 $25,000 U.E.F. 00-3600-62 $50,000 $50,000 U.E.F. CJO.36OO..63 528,000 $28,000 R@RF 00-3600-36 $50,000 $100,000 $100,000 $100,000 $100,000 $100,000 $550,000 U.E.F. 01-361>>-30 $900,000 $900,000 R.G.F. 01.J600.33 $50,000 RftRF 01-3600-37 $110,000 $110,000 R.G.F. 02.J600.34 $250,000 $250,000 R.G,F. 02.J600.35 $250,000 $250,000 U.E.F. 02-3600-21 $100,000 $100,000 U.E.F. 02-3600-22 $100,000 $100,000 U.E.F. 03-36QO.20 $100,000 $100,000 U.E.F. lJ5..36Ol).24 $105,000 5105,000 U.E.F. 05-3600-28 5150,000 $150,000 TOTAL S3OO._ 11.240.000 -- $2CIO,ooo ltoO,OOO 1355.000 13.075,000 Approval Date: Completion Date: iI2:ltI8M788C1P .xu . CAPITAL IMPROVEMENT PROJECT REQUEST FORM D EP ARTMENT: Utility PROJECT NAME: West Water Reclamation Facility Pond Relinin~ LOCATION: West WRF SERVICE AREA: West PROJECf NUMBER: 00-3600-19 PROJECT PRIORITY: Planned Improvement IS PROJECf A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No .) DESCRIPTION/JUSTIFICATION: Install a membrane lining in the reject pond to eliminate exfdtration into the groundwater. RELATIONSHIP TO OTHER PROJECfIPLANS AND THE COMPREHENSIVE PLAN: Wastewater Plant Improvement PROPOSED METHOD OF FINANCING: Capital - Utility Enterprise Fund. IMPACf ON OPERATING BUDGET BY YEAR: Stati7Personnel $0 ..1 OperationIMaintenance $0 . Capital Outlay TOTAL: Offsetting Revenue: NET OPERATING IMPACf: IMPACT ON REVENUE: No impact on revenue. "') 00-3600-19wpd . ) . $37,000 $37,000 $0 ($37,000) . CAPITAL IMPROVEMENT PROJECT REOUEST FO~ DEPARTMENT: Utility PROJECT NAME: West Water Reclamation Facilitv Blower Reolacement LOCATION: West WRF SERVICE AREA: West PROJECT NUMBER: 00-3600.23 PROJECT PRIORITY: Planned Improvement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No . DESCRIPTION/JUSTIFICATION: Replacement or the third blower at the West WRF RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: Wastewater plant maintenance PROPOSED METHOD OF FINANCING: Capital - Utility Renewal and Replacement Fund. . IMPACf ON OPERATING BUDGET BY YEAR: Staft7Personnel SO OperationlMaintenance SO . . . Capital Outlay TOTAL: Offsetting Revenue: NET OPERATING IMPACT: IMPACT ON REVENUE: No impact on revenue. lJO.3600-23wpd $30,000 $30,000 SO (S30,000) . CAPITAL IMPROVEMENT PROJEcr REQUEST FORM DEPARTMENT: Utility PROJECT NAME: lift Station and Pl(lllt Telemetry LOCATION: City Wide SERVICE AREA: All PROJECT NUMBER: 00-3600-27 PROJECT PRIORITY: Planned Improvement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? '..) No \ . DESCRIPTION/JUSTIFICATION: Install SCADA teJemetry system for monitoring lift station and plant alanns and controls. RELATIONSHIP TO OTHER PROJECTIPLANS AND THECOMPREBENSIVE PLAN: System Improvement PROPOSED METHOD OF FINANCING: Capital - Utility Enterprise Fund. ). IMPACT ON OPERATING BUDGET BY YEAR: StatI7Personnel $0 . Operation/Maintenance $0 .' Capital Outlay TOTAL: Offsetting Revenue: NET OPERATING IMPACT: IMPACT ON REVENUE: No impact on revenue. ..:i':';:..:l 00-3600-27 wpd .1 . ) $80,OOO/year for 3 years $80,000 (Year 2000) $0 ($80,000) . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: PROJECT NAME: LOCATION: SERVICE AREA: PROJECT NUMBER: PROJECT PRIORITY: Utility East Water Reclamation Facilitv Unde1pround Electrical Rehabilitation 1560 Winter Springs Blvd. East 00-3600-61 Planned Improvement . IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No DESCRIPTION/JUSTIFICA TION: Relocate the electrical power service to the East WRF from overhead to underground. RELA TIONSHIP TO OTHER PROJECflPLANS AND THE COMPREHENSIVE PLAN: Emergency preparedness PROPOSED METHOD OF FINANCING: ) Capital - Utility Enterprise Fund. . .1 IMPACT ON OPERATING BUDGET BY YEAR: Staff/Personnel $0 OperationiMaintenance Capital Outlay TOTAL: Offsetting Revenue: NET OPERATING IMPACT: IMPACT ON REVENUE: .,.:.,.~ No impact on revenue. .., ) . 00-3600-61 wpd $0 $25,000 $25,000 $0 ($25,000) -. CAPITAL IMPROVEMENT PRQJECf REQUEST FORM DEPARTMENT: Utility PROJECT NAME: East Water Reclamation Faci/itv Sand Removal LOCATION: East WRF SERVICE AREA: East PROJECT NUMBER: 00-3600-62 PROJECT PRIORITY: Planned Improvement .J .' IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No DESCRIPTION/JUSTIFICA nON: Removal of accumulated sand in the East wastewater treatment plant. RELATIONSHIP TO OTHER PROJECI'IPLANS AND THE COMPREHENSIVE PLAN: Planned maintenance PROPOSED METHOD OF FINANCING: ) Capital - Utility Enterprise Fund. . . . . IMPACT ON OPERATING BlIJDGET BY YEAR: Statl7Personnel $0 OperationlMaintenance $0 Capital Outlay S50,000 TOTAL: Offsetting Revenue: NET OPERATING IMPACT: IMPACT ON REVENUE: $50,000 $0 ($50,000) No impact on revenue. 00-J600.62wpd . eAPIT AL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Utility PROJECT NAME: LOCATION: SERVICE AREA: PROJECT NUMBER: PROJECT PRIORITY: East Force Main Desi2n East Wastewater Collection System East 00-3600-63 Planned Improvement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? .) No DESCRIPTION/JUSTIFICA nON: Design of the improvements to the East wastewater coUection system necessary to accommodate future development. RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: Preparation for future growth. PROPOSED METHOD OF FINANCING: ) Capital - Utility Enterprise Fund. . \ . .' . IMPACT ON OPERATING BUDGET BY YEAR: StafflPersonnel OperationIMaintenance Capital Outlay TOTAL: Offsetting Revenue: NET OPERATING IMPACT: IMPACT ON REVENUE: No impact on revenue. 00-3600-63.wpd ) $0 $0 $28,000 $28,000 $0 ($28,000) . CAPITAL IM:PROVEMENT PROJECT REQUEST FORM DEPARTMENT: Utility PROJECT NAME: Sewer Line Restoration LOCATION: Citywide SERVICE AREA: City PROJECf NUMBER: #20-3600-36 PROJECT PRIORITY: Repair/Replacement ., ') IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT: .; No , . DESCRIPTION/JUSTIFICA nON: This project is to annually reline portions of the wastewater collection system. RELA TIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: Planned refurbishment. PROPOSED METHOD OF FINANCING: Renewal and Replacement Fund ) . CAPITAL IMPROVEMENT PROJECT REOUEST FORM DEPARTMENT: Utility PROJECT NAME: East WRF Belt FilteI' Press LOCATION: East WRF SERVICE AREA: City PROJECT NUMBER: #02-3600-35 PROJEer PRIORITY: Planned Expansion IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT: No . DESCRIPTION/JUSTlFICA TION: This project is for the construction of a belt filter press at the East WRF. The belt filter press is needed to handle the volume of solids being generated by this facility. A sludge vacuum bed is currently utilized which is labor intensive and also requires several days drying time. A higher solids content is achieved with the belt press which will reduce the volume of solids handled by employees and by the sludge hauler. RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: This project will allow the treatment plant to handle increased solids attn1>utable to growth. PROPOSED METHOD OF FINANCING: . Utility Revenue Generation Fund. . . . IMPACT ON OPERATING BUDGET BY YEAR: Stafl7Personnel SO OperationIMaintenance $0 Capital Outlay S2S0,OOO TOTAL: $250,000 Offsetting Revenue: NET OPERATING IMPACT: SO ($250,000) IMPACT ON REVENUE No impact on revenue. 02-J6lJO.1S .wpd ..1 .j ) .l CAPITAL IMPROVEMENT PROJECT REOUEST FORM DEPARTMENT: Utility PROJECT NAME: East WRF Scrubber LOCATION: East WRF SERVICE AREA: City PROJECT NUMBER: #02-3600-21 PROJECT PRIORITY: Planned Expansion IS PROJEcr A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No DESCRlPTION/JUSTIFICA nON: Construct a gas scrubber system to contain and control leaks of gaseous chlorine. RELATIONSHIP TO OTHER PROJECT/PLANS AND WE COMPREHENSIVE PLAN: Preventative safety improvement. PROPOSED METHOD OF FINANCING: Utility Enterprise Fund. .' IMPACT ON OPERATING BUDGET BY YEAR: Staff7Personnel $0 OperationIMaintenance $0 Capital Outlay $100,060 TOTAL: $100,000 Offsetting Revenue: $0 NET OPERATING IMPACT: ($100,000) IMPACT ON REVENUE .::>.'.") No impact on revenue. .) ) .\ 02-3600-21 :wpd . CAPITAL IMPROVEMENT PROJECT REOUEST FORM DEPARTMENT: Utility PROJECT NAME: West WRF Scrubber LOCA TION: East WRF SERVICE AREA: City PROJECT NUMBER: #02-3600-22 PROJECT PRIORITY: Planned Expansion IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No . i DESCRlPTION/JUSTIFICA nON: Construct a gas scrubber system to contain and control leaks of gaseous chlorine. RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: Preventative safety improvement. , PROPOSED METHOD OF FINANCING: Utility Enterprise Fund. IMPACT ON OPERATING BUDGET BY YEAR: StaffIPersonnel $0 ) - OperationIMaintenance $0 ) . Capital Outlay $100,000 . .' ) .1 TOTAL: $100,000 . $0 ($100,000) Offsetting Revenue: NET OPERATING IMPACT: IMPACT ON REVENUE No impact on revenue. 02-3600-12 .wpd . . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Utility PROJECT NAME: East WRF Bar Screen LOCATION: East WRF SERVICE AREA: City PROJECT NUMBER: #03-3600-20 PROJECT PRIORITY: Planned Expansion IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No DESCRlPTION/JUSTIFICA TION: Construct a bar screen at the East WRF to remove non-organics from the wastewater. RELA TIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: Planned improvement. PROPOSED METHOD OF FINANCING: Utility Enterprise Fund. IMPACT ON OPERATING BUDGET BY YEAR: Staff/Personnel $0 OperationIMaintenance $0 ) Capital Outlay $1.00,000 TOTAL: $100,000 . Offsetting Revenue: $0 \ . '. .~) ) . ) . NET OPERATING IMPACT: ($100,000) IMPACT ON REVENUE No impact on revenue. 03-3600-20.wpd .> e ...!,::-:;;:.~.:'.. ei ) . CAPITAL IMPROVEMENT rROJECf REQUEST FORM DEPARTMENT: Utility PROJECT NAME: West Force Main Reroutine LOCATION: Western Portion of Winter Springs SERVICE AREA: West PROJECT NUMBER: #05-3600-24 PROJECT PRIORITY: Repair/Replacement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No DES CRIPTION/JU STIFlCA TION: Construction of new force mains to accommodate and optimize wastewater flows to the WRF from new developments. RELATIONSHIP TO OTHER JPROJECTIPLANS AND THE COMPREHENSIVE PLAN: This project will enable us to maintain the existing level of service. PROPOSED METHOD OF FINANCING: Capital - Utility Enterprise Fund. . ) . ) . IMPACT ON OPERATING BlJ1[)GET BY YEAR: StaIDPersonnel OperationIMaintenance Capital Outlay TOTAL: Offsetting Revenue: NET OPERATING IMPACT: JMPACf ON REVENUE: No impact on revenue. OS-3600-24.wpd ) $0 $0 $105,000 . $105,000 $0 . ($105,000) . ':"\."';' . ) ) . CAPITAL IMPROVEMENT PROJECT REOUEST FORM DEPARTMENT: Utility PROJECT NAME: East Force Main Rerouting LOCATION: Eastern Portion of Winter Springs Resurfacing SERVICE AREA: City PROJECT NUMBER: #05-3600-28 PROJECT PRIORITY: Repair/Replacement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No DESCRIPTION/JUSTIFICA TION: This project is for the rerouting of the wastewater flows originating from the Western and Northern areas of the East system. Our goal is to reduce the amount ofre-pumping and reduce the load on some conveyance lines: RELATIONSHIP TO OTHER PROJECfIPLANS AND THE COMPREHENSIVE PLAN: This project will enable us to maintain the existing level of service. PROPOSED METHOD OF FINANCING: Capital - Utility Enterprise Fund. ) . .",;1. \ I ) . ) ) . IMPACT ON OPERATING BUDGET BY YEAR: StafflPersonnel OperationIMaintenance Capital Outlay TOTAL: Offsetting Revenue: NET OPERATING IMPACT: IMPACT ON REVENUE: No impact on revenue. 0.5-3600-28.wpd $0 $0 $150,000 . $150,000 $0 ($150,000) . . . IMPACT ON OPERATING BUDGET BY YEAR: Staff/Personnel $0 OperationIMaintenance $0 Capital Outlay S50,OOO-'00/SI OO,OOO/yr TOTAL: SSO,ooo-'oolSl00,OOO/yr Offsetting Revenue: NET OPERATING IMPACT: $0 $50,000- 'oo/$loo,ooO/yr IMPACT ON REVENUE: No impact on revenue. 20-3600-36.wpd . I . . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Utility PROJECT NAME: West Water Reclamation Facilitv Sune Tank LOCATION: West WRF - 1000 West S.R. 434 SERVICE AREA: City PROJECT NUMBER: #01-3600-30 PROJECT PRIORITY: PI armed Expansion IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No DESCRIPTION/JUSTUFICA nON: This project is for the construction of a surge tank at the West WRF. A surge tank is needed to attenuate the increased flows that occur with growth. The surge tank equalizes the peak flows so that hydraulic surges and overloads do not upset the plant. RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: This project will allow the treatment plant to handle increased peak flows associated with growth. PROPOSED METHOD OF FINANCING: 1997 Utility Construction Fund ) . IMPACT ON OPERATING BUDGET BY YEAR: . Stafi7Personnel $0 OperationIMaintenance $ Capital Outlay $900,000 TOTAL: $9OOtooo Offsetting Revenue: $0 NET OPERATING IMPACT: $900,000 IMPACT ON REVENUE: No impact on revenue. .....:...\ ,; . Ol-3600-30.wpd - ). \ . . CAPITAL IMPROVEMENT PROJECT REOUEST FORM DEPARTMENT: Utili~ PROJECT NAME: West WRF Air Line AdditiOll LOCATION: West WRF SERVICE AREA: Western Portion of City PROJECT NUMBER: #01.3600-33 PROJECT PRIORITY: Existing Deficiency IS PROJECT A CAPITAL IM1PROVEMENT ELEMENT REQUIREMENT? No . DESCRIPTION/JUSTIFICATION: This project is for the addition of a parallel air line from the blowers to the treatment plant. The existing single air line can not handle the air volume when all three blowers are running. RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN This project will enable the wastewater treatment plant to handle the increased flows associated . ~ with wet weather. PROPOSED METHOD OF FINANCING: Utility Revenue Generation Fund. . . . . IMPACT ON OPERATING BUDGET BY YEAR: Staff/Personnel $0 OperationIMaintenance SO Capital Outlay $50,000 TOTAL: $50,000 Offsetting Revenue: $0 NET OPERATING IMPACT: ($50,000) IMP~CT ON REVENUE: No impact on revenue. OI-3600-JJ.wpd . CAPITAL IMPROVEMENT PROJECT REOUEST FORM DEPARTMENT: Utility PROJECT NAME: WWJ(F Plant #1 PaintinH LOCATION: West Water Reclamation Facility SERVICE AREA: City PROJECT NUMBER: #01-3600-37 PROJECT PRIORITY: Repair/Replacement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT: No . DESCRIPTlON/JUSTIFICA noN: This project is to sandblast and repaint plant #1 at the West WRF. This steel structure exhibits extensive corrosion and needs to be refinished. RELATIONSHIP TO OTHER PROJECTIPLANS AND TEE COMPREHENSIVE PLAN: None. PROPOSED METHOD OF FINANCING: Renewal and Replacement - Utility Enterprise Fund. . IMPACT ON OPERATING BUDGET BY YEAR Staft7Personnel SO .- Operation/Maintenance Capital Outlay TOTAL: Offsetting Revenue: NET OPERATING IMPACT: $0 $110,000 $110,000 SO ($110,000) IMPACT ON REVENUE: No impact on revenue. . OI-3600-37wpd . . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Utility PROJECT NAME: West WRF Belt Filter Press LOCATION: West WRF - 1000 West S.R. 434 SERVICE AREA: City PROJECT NUMBER: #02-3600-34 PROJECT PRIORITY: Planned Expansion IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT: No . DESCRIPTION/JUSTIFICATION: This project is for the construction of a belt filter press at the West WRF. The beh filter press is needed to handle the vonume of solids being generated by this facility. A sludge vacuum bed is currently utilized which is labor intensive and also requires several days drying time. A higher solids content is achieved with the belt press which will reduce the volume of solids handled by employees and by the sludge hauler. RELA TIONSBIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: This project will allow the treatment plant to handle increased solids attributable to growth. PROPOSED METHOD OF FllNANClNG: . Utility Revenue Generation Fund. . . . IMPACT ON OPERATING BUDGET BY YEAR: Staff/Personnel $0 OperationIMaintenance $0 Capital Outlay $250,000 TOTAL: $150,000 Offsetting Revenue: SO NET OPERATING IMPACT: ($250,000) IMPACT ON REVENUE No impact on revenue. 02.3600-34.wpcI .,-' ",-"," . . PROPOSED RECLAIMED WATER PROJECT EXPENDITURES BY YEAR Project Project Current Projected Year 1 Year % Year 3 Year 4 Year 5 Toul Number 98/99 99/00 00/01 01102 02/03 OJIM 04/05 Reclaimed Water Dlst. Impr. . oo.3aD-43 $3SO,OOJ $:EO,OOJ Seneca Blvd. WS Improvement No Terraces Q3.3EiCX).51 $70,OOJ $70,00J See #4 04-3&X>-55 $5D,00J $5D,OOJ Surface Water AugmentaUon TOTAL $0 $3SO,OOJ $0 $0 $70,CXXl $&X).a::JJ $0 $92O,OOJ PROPOSED PROJECT REVENUE SOURCE BY YEAR Revenue Project Current Projected Vear1 Year 2 Year 3 Year 4 Year 5 Total Source Number 18/99 99/00 00101 01102 02103 03/04 04J06 U.E.F. ro36OO-43 $3SO,a::JJ $3S),OOJ U.E.F. CJ3..3ElD..61 $70,OOJ $70,OOJ U.E.F. 04-3ElX)..55 $&X) em $Em,em TOTAL $0 $35O,em $0 $0 $70,CXXl $5OO,em $0 $92O,em Approval Dale: CompIellon Date: Start Dale: 61~798C1".XLS . .) . ). . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: PROJECT NAME: LOCATION: Utility Reclaimed Water Distribution Improvements - Seneca Blvd Northeast Tuscawilla SERVICE AREA: Eastern Portion of City PROJECT NUMBER: #00-3600-43 PROJECT PRIORITY: Planned Expansion IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No DESCRlPTION/JUSTIFlCA nON: This project is for the construction of an extension to the reclaimed distribution system to serve the Seneca Boulevard area of the City. This project is proposed as part of the East Reclaimed Water Distribution System Master Plan. RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: This project will assist us in pursuing our goal of reducing the potable water per capita consumption. PROPOSED METHOD OF FINANCING: .:.. Capital - Utility Enterprise Fund. \ . .\ .) IMPACT ON OPERATING BUDGET BY YEAR StaffJPersonnel $0 OperationlMaintenance $0 Capital Outlay $350,000 TOTAL: $350,000 Offsetting Revenue: NET OPERATING IMPACT: IMPACT ON REVENUE: There will a reclaimed water revenue increase of approximately $3,600 from this project. However, there will also be a decrease of approximately $8,000 in potable water revenues. There will also be a positive impact on future potable water capital demands due to the reduction in potable water volume requirements. OO-3600-43.wpd ) . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: PROJECT NAME: Utility Reclaimed Water Distribution Imorovements - N. O. Terraces Section #4 LOCATION: North Orlando Terraces, Section 4 SERVICE AREA: West PROJECT NUMBER: #03-3600-51 PROJECT PRIORITY: Planned Expansion IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? . No DESCRIPTION/JUSTIFICATION: This project is for the construction of an extension to the reclaimed distribution system to serve residential customers. This project is proposed as part of the West Reclaimed Water Distribution System Master- Plan. RELATIONS~ TO OTHER PROJECTIPLANS AND THE c::;OMPREHENSIVE PLAN: This project will assist us in pursuing our goal of reducing the potable water per capita consumption. PROPOSED METHOD OF FINANCING: ) Capital- Utility Enterprise Fund. . . . ) . IMPACT ON OPERATING BUDGET BY YEAR StaIDPersonnel $0 OperationIMaintenance $0 Capital Outlay $70,000 TOTAL: $70,000 Offsetting Revenue: NET OPERATING IMPACT: IMPACT ON REVENUE: There will a reclaimed water revenue increase of approximately $3,600 from this project. However, there will also be a decrease of approximately $8,000 in potable water revenues. There will also be a positive impact on future potable water capital demands due to the reduction in potable water volume requirements. O)'36ro-Rwpd . ./ . . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Utility PROJECT NAME: Reclaimed Surface Water Auementanon LOCA TION: Central Wmds Park SERVICE AREA: City PROJECT NUMBER: #04-3600-55 PROJECT PRIORITY: Planned Expansion IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No DESCRIPTION/JUSTIFlCA TION: This project is proposed as part of the West Reclaimed Water Distribution System Master Plan and augments the reclaimed water supply which, at present, is insufficient to meet the proposed master plan requirements. RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: This project will assist us in pursuing our goal of reducing the potable water per capita consumption. PROPOSED METHOD OF FINANCING: Capital - Utility Enterprise Fund. . IMPACT ON OPERATING BUDGET BY YEAR StatI7Personnel $0 OperationIMaintenance $0 Capital Outlay $500,000 TOTAL: $500,000 Offsetting Revenue: NET OPERATING IMPACT: '."".':") IMPACT ON REVENUE: , . ) ) . 04-3600-SS.wpd . . . PROPOSED EQUIPMENT EXPENDITURES BY YEAR Project Project Projected Year 1 Year 2 Year 3 Year 4 Year 5 . Total Name Number 99/00 00/01 01/02 02/03 03/04 04105 Vehicle Reolacement 20-3600-64 $75,000 $75,000 $75,000 $75,000 $75,000 $75,000 $450,000 Sewer Cleaning Vacuum Unit 01-3600-66 $165,000 $185,000 Backhoe 03-3600-67 $75,000 $75,000 Other Eauioment 20-3600-65 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $200,000 TOTAL $125,000 $290,000 $125,000 $200,000 $125,000 $125,000 $890,000 PROPOSED PROJECT REVENUE SOURCE BY YEAR Revenue Project Projected Year 1 Year 2 Year 3 Year 4 Year 5 Total Source Number 99/00 00/01 01/02 02103 03/04 04/05 Utility Enterprise Fund 20-3600-64 $75,000 $75,000 $75,000 $75,000 $75,000 $75,000 $450,000 Utility Enterprise Fund 01-3600-66 $165,000 $165,000 Utility Enterprise Fund 03-3600-67 $75,000 $75,000 Utility Enterprise Fund 20-3600-65 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $200,000 TOTAL $125,000 $290,000 $125,000 $200,000 $125,000 $125,000 $890,000 Approval Date: Start Date: Completion Date: 8116199-9798CIP .XLS . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Utility PROJECT NAME: Vehicle Replacement LOCA TION: Administrative SERVICE AREA: City PROJECT NUMBER: #20-3600-64 PROJECT PRIORITY: Replacement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? ..... J No .} DESCRIPTION/JUSTIFICA nON: Vehicles need to be replaced to maintain the fleet. Future years will require alternating between purchasing two and three vehicles per year based on twenty five vehicles with a ten year life expectancy. RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: None PROPOSED METHOD OF FINANCING: ) Capital Equipment - Utility Enterprise Fund. .. ) . . IMPACT ON OPERATING BUDGET BY YEAR: StafflPersonnel $0 Operation/Maintenance $0 Capital Outlay $75,000/yr TOTAL: $75,000/yr Offsetting Revenue: $0 NET OPERATING IMPACT: ($75,000)/yr -'.".'. IMPACT ON REVENUE: . No impact on revenue. :20-3600-64.wpd ). ) . . CAPITAL IMPROVEMENT PROJECT REOUEST FORM DEPARTMENT: Utility PROJECT NAME: Sewer Cleaner Vaccum Unit LOCA TION: Administration SERVICE AREA: City PROJECT NUMBER; #01-3600-66 PROJECT PRIORITY: Planned Addition IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? 1:-':..-':) No .) DESCRIPTION/JUSTIFICATION: The sewer cleaning vacuum unit is needed for the removal of sand and debris from the gravity sewer and lift stations. We are limited in our current capability to perform this task due to space entry regulations and manpower limitations. This vacuum trailer removes materials by sucking them into a vacuum tank. All operations can be performed from the surface by a single individual. The vacuum trailer could also be used to clean stonn drains. RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: None PROPOSED METHO)[) OF FINANCING: ) .l Capital Equipment-Utility Enterprise Fund. .'. IMPACT ON OPERATING BUDGET BY YEAR: StaffiPersonnel $0 OperationIMaintenance Capital Outlay TOTAL: Offsetting Revenue: NET OPERATING IMPACT: ",..,:,) IMPACT ON REVENlUE: . No impact on revenue. .1 Ol-3600-66.wpd $ 1,000 $164,000 $165,000 $0 ($165,000) . CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Utility PROJECT NAME: Backhoe LOCATION: West WRF SERVICE AREA: City PROJECT NUMBER: #03-3600-67 PROJECT PRIORITY: RepairlReplacement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? . ..:j No .\ DESCRIPTION/JUSTIFlCA nON: This backhoe is needed to replace the 1988 backhoe currently used at the West WRF for sludge loading and minor repairs. It costs approximately $5,000 to $7,000 per year to maintain this equipment. The normal life expectancy ofa backhoe is 10 to 12 years. RELA TIONSHlP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: None PROPOSED METHOD OF FINANCING: Capital Equipment - Utility Enterprise Fund. \ ) 1 . . ) . ) . IMPACT ON OPERATING BUDGET BY YEAR StaIDPersonnel $0 OperationIMaintenance $ Capital Outlay $75,000 TOTAL: $75,000 Offsetting Revenue: NET OPERATING IMPACT: $0 ($75,000) IMPACT ON REVENUE: No impact on revenue. 03-3600-67.wpd . ..:\ } .'. .' CAPITAL IMPROVEMENT PROJECT REQUEST FORM DEPARTMENT: Utility PROJECT NAME: Equipment E.x"enclitures LOCATION: Administrative SERVICE AREA: City PROJECT NUMBER: #20-3600-65 PROJECT PRIORITY: Replacement IS PROJECT A CAPITAL IMPROVEMENT ELEMENT REQUIREMENT? No DESCRIPTION/JUSTIFICATION: Equipment needs to be replaced and new equipment added to keep abreast of the future workload and needs. RELATIONSHIP TO OTHER PROJECTIPLANS AND THE COMPREHENSIVE PLAN: None PROPOSED METHOD OF FINANCING: Capital Equipment - Utility Enterprise Fund. . . .', '...') . . .) .l ) IMPACT ON OPERATING BUDGET B:V YEAR: StatI7Personnel $0 OperationIMaintenance $0 Capital Outlay $50,OOO/yr TOTAL: $50,OOO/yr Offsetting Revenue: $0 NET OPERATING IMPACT: ($50,000)/yr IMPACT ON REVENUE No impact on revenue. 20-3600-65 .wpd ) . APPENDIX A C.I.E. LEVEL OF SERVICE STANDARDS The principal criterion for capital improvements will be level of service (LOS) standards, quantitative indicators of the amount of service provided by a facility or type of facility. The City's need for capital improvements is largely detennined by the LOS standards adopted in its Comprehensive Plan. In accordance with Objective C, Policy 1 of the Capital Improvements Element, Development approvals shall not degrade the following Level of Service Standard adopted by the City of Winter Springs: TRAFFIC CIRCULATION S.R. 434,419 Peak Hour LOS "D" . Tuscawilla Road (thru 1996) Peak Hour LOS "E" Municipal Collector Roads Peak Hour LOS "D" RECREATION AND OPEN SPACE Community Parks 1. 6 acres per 1,000 Neighborhood Parks Northwest Sector 5.9 acres per 1,000 South Central 5.3 acres per 1,000 Southeast 6.9 acres per 1,000 SOLID WASTE Future LOS 3.771bs./capita/day WATER Current LOS 143 gcpd . . SEWER LOS 100 gcpd STORM WATER (DRAINAGE) Water quality treatment shall be provided for a volwne equivalent to 1/2 inch of depth over the entire site or the runoff from the first inch of rainfall on the entire site, consistent with Chapter 17-25 F.A.C. All stonnwater discharge facilities shall be designed so as to not degrade the receiving water body below the minimwn conditions necessary to assure the suitability of water for the designated use of its classification as established in Chapter 17-302 F.A.C. All treatment and disposal facilities are required to meet the design and performance standards established in Chapter 17-25 Sections 17-25.025 and 17-25.035 F.A.C. . . . ) ..i ./ APPENDIX B INVENTORY OF EXISTING REVENUE SOURCES Wmter Spring's major fund categories and their use as funding mechanisms for both the operating and capital improvements budget are described as follows: General Fund - The General fund is used to account for all transactions of a governmental unit which are not accounted for in another fund. Special Revenue Funds - Special Revenue Funds are used to account for loan proceeds and revenues form specific taxes or other earmarked revenue sources that are legally restricted to expenditures for specific purposes. Enterprise Funds - Enterprise Funds are used to account for City services that are operated in a manner similar to private business enterprises, that is, where the stated intent is that the cOsts (expenses, . including depreciation) of providing goods or services to the general public on a continuing basis be financed or recovered primarily through user charges, or where periodic detennination of revenue earned, expenses incurred, and/or net is deemed appropriate for capital maintenance, public policy, management control, accountability or other purposes. In order to effectively plan for needed capital improvements and to systematically arrange for necessary financing through the budgeting process, a logical preliminary step is to inventory all major sources of funding to Wmter Springs. The following revenue sources comprise a working inventory, and shall include but not be limited to the following: A Property Taxes (ad Valorem) - Property taxes are based on a millage rate [one mill is the equivalent of$ 1.00 per $ 1,000 of assessed value or .1%) which is applied to the total taxable value of all real property. B. Franchise Fees - Franchise fees are levied upon a company in return for the privilege of doing business within the City's jurisdiction. The rates are established through negotiated contracts for each franchise. Currently the City has franchise agreements covering gas, electric, telephone and cable utilities. C. Licenses. Permits and Fines - All businesses which operate within the City are required to apply for an occupational license. Building permits are required for all construction. The City receives from Seminole County a portion of all traffic citations issued within the City. D. Interest Income - Interest income is revenue earned on funds that have invested by the City. E. Other Chan?es for ServiceslUser Fees - Charges for services provided by the City that are paid . . . F. H ) by the users to fully or partially cover the costs incurred to provide the service. These fees include but are not limited to: special fees placed on developers for processing various plans, administrative fees for new annexation, and enterprise fund charges for delivering water and. sewer selVlce. Utility Taxes - Utility taxes are taxes assessed on the users of water, electric, gas, propane and telephone. The City currently levies a utility tax rate of 8%. G. Miscellaneous Revenue - Miscellaneous revenue includes the minor revenues covering the rental of City facilities, sale of surplus property and refunds otherwise not distributable. Intergovernmental Revenues - Intergovernmental revenues are funds collected by the state or County and shared with other local governmental units. I. Special Sources of Revenue - Depending on priorities assigned by the City Commission and the availability of other revenue sources, it may be necessary to seek additional funding mechanisms. The following sources of revenue represent local options available to the City to finance required capital improvements: 1. Impact Fees - These fees are charged concurrent with new development and are designed to contribute towards payments for infrastructure needs, but not operational costs, which directly result from new development. These fees must be equitably allocated to the specific group(s) which will directly benefit from the capital improvement, and the assessment levied must fairly reflect the true cost of these improvements. 2. Special Assessments - Like impact fees, special assessments are levied against residents, agencies or districts who directly benefit from the new service or facility. When 51 % of the owners of real estate who would benefit from an improvement, petition for the improvement, the owners will be assessed 100% of the cost of the improvement. 3. Borrowing - The extremely high cost of many capital improvements requires local govenunents to occasion~y resort to borrowing, either through short-term or long- term financing. short-term financing, perhaps through local banks, is one option available to raise required revenue for periods of, perhaps, one to five years. The more customary method, however, is to authorize long-term bond issues, normally for five to forty years. The following are examples of types of bond issues that the City may use: a. General Obligation Bonds - These bonds are backed by the full faith and credit of the local government and must be approved by voter referendum. They offer low interest for canying less risk since they are secured by government taxjng power. Since the g~neral fund is obligated to serve first, the funds raised by their sale should be used only for projects benefitting the entire City. b. Revenue Bonds - Funds raised from revenue bonds may be used for projects . .. ') .' ) . benefitting a narrower group than the entire City because the charges collected from the users of the improvement are applied directly to the debt service on these bonds. In this respect the projects are self supporting. Revenue bonds pay higher interest and their issuance may be approved by the City Commission without voter approval. c. Industrial Revenue Bonds - Though the local government issues these bonds, the debt is actually assumed by the companies or industries who use the revenues for conStruction of plants or facilities. Because they are tax-exempt and therefore low interest, industries are attracted to this interaction with the public sector. Local government can transfer the actual liability to private interest while garnering employment and economic benefits for the community. Florida Statutes place limits on the issuance of revenue bonds by local governments. d. State/Federal Sources - The City, like other local governments in Florida, receives annual disbursements from the state government to supplement its operating and capital budget revenues. In contrast to revenue sources in the previous section which are levied, collected, and disbursed all at the localleve~ funds in this section are 1) generated locally, but collected and returned to the City by the State; 2) adopted as local option tax or license fee, collected and returned by the State; 3) shared from state general revenues; 4) receipt of revenues from federal, state, or other local sources in the form of grants. State sources of revenue for the City include: state revenue sharing in which the municipal portion is funded through an 11 cent cigarette tax and municipal gas tax; a state sales tax of 6%, a portion of which is returned to municipalities based on population; and mobile home licenses, alcoholic beverage tax and motor fuel tax refunds. e .' . h '.) , , eJ e ,APPENDIX C POPULA nON PROJECTIONS The following chart and table are from the City's Comprehensive Plan (Vol 1 of2; Figure LU-F9). (/) u c ~ 20 ::J o .r=. I- ESIlMATED AND PROJECfED POPULATION 1970THROUGH 2010 40 37537 30 10 o APR 70 APR 75 APR 80 APR 85 APR 90 APR 95 JAN 2000 JAN 05 JAN 10 Data analyzed 1/27/92. Population Estimates and Projections - 1970 to 2010 Description 1970 1980 1990 1997 2010 ----------- ------- ------- ------- ------- ------- Population est./proj. 1,161 10,350 22,683 28,865 37,5)7 Period growth rate N/A 7 9 i.: 4 H 119.16\ 27.25\ 30.04\ Annualized growth rate N/A 24.45\ 8.16\ ).50\ 2_041; ) Source: \-Jinter Spt-ings Planning Department . .....':..;.') . ) .. As can be seen from Figure LU-F9 "Estimated and Projected Population (1970 through 2010) the population projection for the City for January, 2000 is 30,673, slightly above the 29,265 that City staff has estimated for July, 1999 utilizing the University of Florida Bureau of Economic and Business Research figures combined with the City's building permits for single family residential. In view of the closeness ofthe projection done in 1992 and the estimate done for July, 1999, the data and analysis of the Comprehensive Plan is valid and as a result, the improvements discussed in the various elements of the Comprehensive Plan are still valid.