Loading...
HomeMy WebLinkAbout1999 02 22 Consent Item C COMMISSION AGENDA ITEM C Consent xx Information Public Hearin!!: Reeular February 22. 1999 Meeting MGR. ~~/Pf' REQUEST: Community Development Department, Land Development Division, requesting the Commission approve the acceptance of the water and sewer system, the reclaimed water system, the stormwater management system and the roads for public ownership and maintenance, Winding Hollow Unit 5. PURPOSE: The purpose of this Agenda Item is to accept the water and sewer system, the reclaimed water system, the stormwater management system and the roads for public ownership and maintenance, These improvements are located in Unit 5 of Winding Hollow subdivision (south of State Road 434 and midway between City Hall and the State Road 419/State Road 434 intersection). APPLICABLE CODE: Code Section 9-76(b) Maintenance Bond. When requesting to record a plat, for which the improvements have been installed, inspected and approved by the City Engineer, and when the city is being asked to accept such improvements, the subdivider will provide a maintenance bond payable to the City guaranteeing the performance of required and installed improvements for two (2) years after the date of completion and acceptance by the City, executed and enforceable in the same manner as the corporate or surety completion bond, The bonds will be ten (10) percent of the estimated construction cost of all improvements to be owned and maintained by the City, As an alternative to the provision of a corporate or surety bond, the subdivider may provide the deposit of equivalent cash in an escrow account with the City, or a letter of credit drawn on an approved institution, drawn in a form approved by the City Attorney, February 22, 1999 CONSENT AGENDA ITEM C Page 2 FINDINGS: ]) Winding Hollow Unit 5 was approved for recordation by the City Commission at their meeting of October 26, ] 998, 2) Unit 5 has been inspected by the City Engineer and the work was done in general conformance to the approved engineering plans, 3) The "Trotwood Connector" has not been built at this time due to the City appointed landscape architect not completing the task assigned, The City has a Performance Letter of Credit in the amount of$76, 120,00 to ensure completion of the "Connector", The developer has also agreed not to sell lots 39] and 392 until after the "Connector" has been completed and accepted by the City, 4) The City Engineer has determined that the construction cost for Unit 5 to be $872,445,95 (10% of this cost being $87,244,60), 5) The developer has submitted a maintenance bond in the amount of $87,250.00 which exceeds the required ten percent (10%) required for a maintenance bond, RECOMMENDA TION: The recommendation is that the City Commission approve the acceptance of the water and sewer system, the reclaimed water system, the stormwater management system, the lighting and the roads located in Winding Hollow Unit 5 for public ownership and maintenance with the caveat that lots 391 and 392 cannot be sold until the "Trotwood Connector" has been completed and accepted by the City, ATTACHMENTS: January] 2, 1999 - City Engineer Letter to Michael Todd and Mark Evans January ]4, 1999 - Mark Evans Letter to City Engineer February 16, 1999 - City Engineer Letter to Michael Todd February 22, 1999 CONSENT AGENDA ITEM C Page 3 February 16, 1999 - City Engineer Memo to Land Development Coordinator February 16, 1999 - Land Development Coordinator Memo to City Attorney - Proposed Maintenance Bond COMMISSION ACTION: