Loading...
HomeMy WebLinkAbout1997 12 08 Consent Item D f, " COMMISSION AGENDA ITEM D REGULAR CONSENT X INFORMATIONAL December 8, 1997 Meeting MG~tv--roEPT /#- Authorization REQUEST: Public Works Department Requesting Authorization to Execute a Change Order for the Paving of Bahama Road West of Moss Road. PURPOSE: The purpose of this Board item is to request approval of a Change Order to the Hayes, Panama, and Moss Road Paving project with Bergeron Land Development, Inc. for the paving of a section of Bahama Road west of Moss Road for an amount not to exceed $25,000.00. CONSIDERA nONS: The approval of this change order is needed to pave a 350 foot section of Bahama Road which is difficult to maintain due to the installation of a sanitary sewer manhole. This section is currently dirt and is bounded on the west by a paved section on Bahama Road near the water plant and on the east by the Moss Road/Bahama Road intersection which will be paved as part of the current project to pave portions of the Moss, Hayes and Panama collector roads. Prior to beginning the construction of the current collector road improvement project, the property owner at the corner of Moss and Panama Roads paid for the installation of a gravity sanitary sewer system to serve his property for potential future development. The sanitary sewer was extended eastward on Bahama Road to Moss Road and south from there. A sanitary sewer manhole was installed adjacent to 102 Bahama Road in an unpaved section of Bahama Road. Bergeron Land Development, Inc. was awarded the collector road paving project December 8, 1997 Consent Agenda Item D Page 2.. at a cost of $449,000 plus 10% contingency and they are approximately 50% complete. To date, two change orders have been issued totaling $10,083.23 for additional driveway culverts and additional water main. The construction cost for this change order is estimated to be $21,768.55 which is about $62 per linear foot. The cost for the collector road work is approximately $105 per linear which included drainage, recreational trails, and some utility work. No trails, sidewalks or sodding are included in the change order. If approved and subsequently completed, the Public Works Department would continue the sidewalk on the north side of Bahama Road to Moss Road. ISSUE ANALYSIS: The existence of the sanitary sewer manhole in the middle of the unpaved section of Bahama Road creates problems in maintaining this section of Bahama Road. The current dirt road maintenance program includes grading or box blading twice per_week. The manhole is a fixed structure which detracts from our ability properly crown the road and it may become a safety hazard. The abutting resident has filed a written complaint about this condition. It is only a matter of time before the manhole, grader or box blade is damaged. No other dirt roads maintained by the City have a fixed structure in the middle of the road. FUNDING: The section of Bahama Road west of Moss Road is not a collector road and therefore is not eligible to be funded from the transportation impact fee. Sufficient funds are in the Transportation Improvement Fund reserve account for these improvements. The Transportation Improvement Fund is traditionally the source of funds for pavement resurfacing, however, to my knowledge they have not been previously used to pave dirt roads. The not to exceed change order amount of $25,000 would be incorporated into the 1997/1998 budget revision as a Transportation Improvement fund capital improvements project (140-56310). December 8, 1997 Consent Agenda Item D Pagel RECOMMENDATION: It is recommended that the City Commission approve a Change Order to the contract with Bergeron Land Development, Inc. for a not to exceed amount of $25,000 for the paving of the dirt section of Bahama Road west of Moss Road payable from the Transportation Improvement Fund reserves. IMPLEMENTATION SCHEDULE: Upon approval, the contractor will begin work within the week. Paving is currently scheduled for the end of January, 1998. This project will be added to the Transportation Improvement Fund capital improvements projects when the 1997/1998 budget is revised. ATTACHMENTS: 1. Change Order estimate from Bergeron Land Development, Inc. COMMISSION ACTION: DEC-01-1997 02:48 BERGERON LAND DEV '(.'.r-..:0;' '-'-""/' " .,. / ..,,--/ . "r:. .'rD' ';.':":'~~; '::: .,;:: i.r-" ',r\".. '~:G. :.~ i': \',! . J!:'\ ' :.:,:.,.'.~._.~...;,.. "'rl., :r.' I." :'-'m' ''',.: ....'r' :I'" '.. . '; \:. ~.' 20-::' ".. .;',':'i:~;..,.".,., ,'..:" ~.. '''.', '.. I _, . .., '" ., . . . . , . LANO DEVELOPMENT, INC. .' P.01 Attachment No. 1 2710 Michigan Avenue Kissimmee, Fl. 34744 Office (407) 932~1610 Fax Number: (407) 932-0465 December 1, 1997 City of Winter Springs 1126 East SR 434 Winter Springs, FL 32708-1800 Attention: Mr. Kipton D. Lockcuff: P,E. Re: CPH Project No. W0458.00 Hayes Road, Moss Road and Panama Road Roadway, Drainage and Watennain Improvements Seminole County - BLD Job # 757 Subject: Extension of Bahama Road (West) to Existing Pavement Dear Sir: As requested in our telephone ccnversation of this morning, Bergeron Land Development will extend Bahama Road West for approximately 350' to meet the existing street. Our work will include ClAW the Specifications) regy-ading, stabilizing 12" of sub base, placement ofnbbon curb, 8" limerock, and 1.5" asphalt paving. Subtotal of Additional Work 5% on Subcontracted Work 15% on BLD Work Grand Total: This price is valid for '" ~~ys only. $19,203.00 157.45 2.408.10 $21,768.55 Please issue a Notice to Proceed on this extra as soon as possible. We can provide additional Bahia sodding at $1.50/SY. Sincerely, ~L Glen C. Kolb Project Manager BLDI757/L TR020 cc: C.F. File, Exec. Reading File. Engr. Reading File TOTAL P.01 12-01-97 03:52 PM POI