HomeMy WebLinkAbout1997 11 24 Consent Item A ~..,)\ COMMISSION AGENDA ITEM A REGULAR CONSENT X INFORMATIONAL ~emheL24,-.-l.2.2L Meeting MGR K~T )t-~ Authorization REQUEST: Public Works DepartmentJUtility Division Requesting Authorization to Approve Change Order #1 to the Contract Agreement for the Improvements to Lift Station #7W. PURPOSE: The purpose of this Board item is to request authorization to approve Change Order #1 in the amount of$16,175.71 to the contract agreement with Prime Construction Group, Inc. for the renovation to Lift Station #7W for an increased authorized amount of$80,475.71 plus a 5% contingency. CONSIDERATIONS: This change order is needed to authorize an increase to the Lift Station #7W contract amount due primarily to having an emergency need for a "line stopper" to be installed in the 20" wastewater force main. The conditions requiring the "line stopper" were not known at the time of bid. Change order #1 also includes the addition of two aboveground pump electrical disconnects for improved safety to personnel entering the underground pump dry pit. This project was approved as Consent Agenda item "B" at the August 25, 1997 City Commission meeting. The previously authorized contract amount was $64,300 plus a 10% contingency. The contractor, Prime Construction Group, Inc. of Orlando, began work on November 5, 1997. During the pump replacement process on November 12th, it became apparent that the 24 year old 12" gate valves needed to isolate the flow from the 20" force main would not shut off completely. Without a means to isolate the force main, , November 24, 1997 Consent Agenda Item A Page2_ the full two miles of 20" force main would drain back into the dry pit and overflow into Gee Creek. There was also no place to pump the sewage to complete the pump installation. The most feasible option was to have a "line stopper" installed which entails tapping the force main and using a hydraulically operated bladder to stop the flow. The tap can be reused if needed in the future. The cost for this was determined to be $14,220 including the "line stopper" subcontractor's costs and the contractor costs. This work was deemed to be an emergency because the bypass pumping created a noise problem for abutting residents and a risk of overflowing raw sewage into Gee Creek. The contractor was told to proceed and the emergency work was completed on November 14 allowing the renovation work to continue. The second component of the change order is the addition of two aboveground pump electrical disconnects at a cost of$I,955.71. The original design specifies the pump disconnects to be located at the pump in the dry pit. Due to the potential of water being in the dry pit, it was suggested by the electrician that two additional aboveground disconnects would provide an additional safety measure for personnel entering the pit. FUNDING: This project was budgeted in the Utility Enterprise Fund Renewal and Replacement line code (3600-59110) at $100,000. The additional cost of change order #1, $16,175.71, brings the total contract amount to $80,475.71. There is no increase to the $3,000 Construction Administration costs for CPR Engineers, Inc. The funds for this project will be expended within 30 days of approval. Qr..igin.aLCQJJ1r..ac.t Ch~Qr..der...Jll LQtaLReq.u.es.t Construction $64,300.00 $16,175.71 $80,475.71 Contingency JEA31LQQ(1 0%) _$.Q..oo _$A.Q2l.12( 5%) Total $70,730.00 $16,175.71 $84,499.50 November 25, 1997 Consent Agenda Item A Page 3- RECOMMENDATION: I am recommending that authorization be given to approve Change Order #1 in the amount of$16,175.71 to the contract agreement with Prime Construction Group, Inc. for the renovation to Lift Station #7W for an increased authorized amount of$80,475.71 plus a 5% contingency to be from the Utility Enterprise Fund Renewal and Replacement line code (3600-59110). IMPLEMENTATION SCHEDULE: The project will be completed by November 26, 1997. Funds will be expended by December 31, 1997. ATTACHMENTS: 1. Change Order # 1 COMMISSION ACTION: :. ~} Attachment No. 1 CONTRACT CHANGE ORDER Change Order No. L- Engineer Project No. --.-#97-023 Project Title: Lift. Station #7W Improvements Contractor: Prime Construction Group..-Inc. Reason for Change Add ele.c.t.rkaLdisc.<l1111e.cts-'lll.d_p_erfomLemergenc...y.J.ine-51op.p.age on FM Breakd_own of Proposed Chang~nd Basis for P~ent (Includes pertinent drawings, specifications, and documentation where necessalY) Item No. and Description Change in Contract Cost +H 1. Furnish and Install Two 60 Amp discOlmects in stainless steel $1,955.71 NEMA 4X enclosure. 2. Furnish and Install a single 20" Line Stop on Force Main $14,220.00 including all labor and materials. (1) Total Proposed Change in Contract +( -) $ (2) Original Contract Price $ (3) Total All Previous Change Orders(Change Order No.1 thru-L) $ tun5.71 Q4.3..0.D.00 o (4) New Contract Price(Total ofItem 1,2 & 3) $ 80,flS..71 Recommended By Engineer: Date Accepted By Contractor: Date Accepted By Owner: Date