HomeMy WebLinkAbout1997 07 14 Regular Item D
C()MMISSION AGENDA
ITEM
D
REGULAR X
CONSENT
INFORMATIONAL
~l4. 1997
Meeting
MGR ;{~~r
.iuthorization
REQUEST: Public Works Department is Requesting Consideration of Modifications to the
draft Traffic Circulation Element Update of the Comprehensive Plan
PURPOSE: The purpose of this Board item is to request the City Commission consider
modifications to the Traffic Circulation Plan Update relating to Shore Road based on
input received at the May 19, 1997 workshop and subsequent Commission meetings.
CONSIDERA TIONS:
The City has retained a consultant, Conklin, Porter & Holmes Engineers, Inc., to
update the Traffic Circulation Element of the Comprehensive Plan based on the need to
review the feasibility of several of the proposed transportation projects. A draft of the
proposed traffic plan was reviewed at a May 19, 1997 City Commission workshop and a
consensus was reached on all items with the exception of Winter Springs Boulevard and the
Shore Road extension. The addition of three turn lanes on Winter Springs Boulevard in lieu
of the four laning of a section of Winter Springs Boulevard was conceptually approved at the
June 23, 1997 City Commission meeting. The alternatives presented at the same meeting for
the north Shore Road extension were unacceptable and returned to staff for reevaluation.
The north Shore Road Extension is not a "level of service" dictated project but is
recommended to promote traffic circulation. No deficiency exists or is projected to occur by
this project being deleted. The objection raised by the City Commission to this project is
concern related cut through traffic to Lake Drive and/or Tuskawilla Road. The staff was
directed to reevaluate the Shore Road extension due to the need for intersection
improvements and the desire to provide alternate access to the properties adjacent to the
July 14, 1997
Regular Agenda Item D
Page ..2..
existing terminus to Shore Road. One of the properties between Shore Road and S. R. 434
may develop as a church and the City Commission was concerned about the traffic impact
on the neighborhoods. An outlet on S.R. 434 would reduce the traffic through the
neighborhood. It is lOur opinion that in order for the Shore Road/S.R. 434 intersection
improvements to be eligible for transportation impact fee funds, that the north Shore Road
extension must be included in its entirety although it could be phased.
A modified alternative (#3) is proposed which would allow Shore Road to be built in
two phases. Phase One would be built in the next two to three years and include the S.R.
434 intersection improvements and the north half of the extension. Phase Two would be
built in 2010 with the condition that a physical disconnection be constructed on Panama
Road between Fisher Road and Shore Road to eliminate this cut through route. This is
described in more detail in the attached letter from our consultant.
ISSUE ANALYSIS
North Shore Road Extension
The collection of transportation impact fees provides funds for improvements to the
collector road network. In order for improvements to the Shore Road/S.R. 434 intersection
to be funded from the transportation impact fee, the extension of Shore Road north to this
intersection ultimately needs to occur.
Allia:Jlative #1 - Delete the north Shore Road extension from the Traffic
Circulation Plan update. Upon approval, this would also delete this project from the
currently adopted Comprehensive Plan. No LOS deficiencies would occur due to the
deletion of this project. However, impact fees could no longer be used to fund any
improvements for the road.
Alternative #2 - Include the extension of Shore Road as a collector road to
S.R. 434 including intersection improvements as a single project. The estimated cost
is $235,000. The project would be constructed utilizing transportation impact fees in
approximately the year 2002 or sooner if other projects are reprioritized.
July 14, 1997
Regular Agenda Item D
Page -1
Alternative #3 - Include the northern extension of Shore Road to S.R. 434 as
a two phased project. Phase I would consist of approximately 500 lineal feet of
roadway with intersection improvements at S.R. 434 at an estimated cost of
$150,000. This could be constructed in 1999 or 2000. Phase II would consist of an
additional 500 lineal feet of roadway to connect to the existing end of Shore Road at
an estimated cost of $105,000. A condition of Phase Two is that a physical
disconnection would occur at the Panama Road/Shore Road intersection so that no
traffic from Fisher Road could get to Shore Road via Panama Road. This alternate
would also delete Shore Road south of Bahama Road and Panama Road between
Fisher Road and Shore Road as collector roads.
FUNDING
No funds are needed at this time.
RECOMMENDATION:
It is recommended that the City Commission direct staff to incorporate Alternative
#3 for the north Shore Road Extension (extend Shore Road to S.R. 434 as a two phased
project closing Panama Road when the second phase is constructed) into the update of the
Traffic Circulation Element of the Comprehensive Plan and proceed to the Planning and
Zoning Board with those revisions.
IMPLEMENTA TION:
The Traffic Circulation Element will be submitted to the Local Planning Agency
(P&Z) for consideration. The Comprehensive Plan Amendment will then be brought before
the City Commission for approval and transmittal to the Department of Community Affairs.
July 14, 1997
Regular Agenda Item D
Page ..A.
ATTACHMENTS:
1. Traffic Study letter from CPH of July 3, 1997 with Map.
COMMISSION ACTION:
July 3, 1997
Attachment No. 1
Conklin, ~orter and Holmes
@ ~ ENGINEERS, INC.
o 1104 E. ROBINSON STREET
ORLANDO. FLORIDA 32801.2092
TEL 407 -425-0452
FAX # 407.648-1036
Mr. Ron McLemore
City Manager
City of Winter Springs
1126 East S.R. 434
Winter Springs, Florida
32708
RE: Traffic Study - Shore Road Alternative
CPH Project No. W0459.00
Dear Mr. McLemore:
Attached please find an alternate 2010 Future Traffic Circulation Map per our discussion on
Shore Road. This map shows Shore Road as a collector from S.R. 434 to Bahama Road. The
section of Shore Road from Bahama Road to Panama Road has been removed from the map as a
designated collector. The section of Panama Road from Fisher Road to Shore Road has also
been removed as a designated collector. Based on this map, this section of roadway would
remain as a dirt road and be unimproved.
Shore Road will be a two-phased project with the first phase constructed in the next two to three
years and the second phase constructed in the year 2010. In the event that Phase II of Shore Road
is constructed, a physical disconnection of Panama Road will be performed at the Panama
Road/Shore Road intersection by means of a landscaped berm or other similar construction. A
cul-de-sac would also be constructed at the end of Shore Road.There are two homes on Panama
Road between Fisher Road and Shore Road which will require service out to the west.
We believe this map/configuration offers available alternate solution for the inclusion of Shore
Road as a collector road and the future connection of Shore Road at the S.R. 434 and S.R. 419
intersection. We will be present at the July 14, 1997 commission meeting to answer any
questions that the Commission may have on this alternate.
Sincerely,
CONKLIN, PORTER AND HOLMES - ENGINEERS, INC.
~2~
Senior Vice President
TMZ/ja
cc: Kipton Lockcuff, P.E.
Revisedlw045900.MCUd4
~-
~
Q
..."""~-~'-- ..........,
.../
CITY OF WINTER SPRINGS
2010 FUTURE TRAFFIC
elRCUlA TION MAP
....~.
./~.
----- ~,~-=.-:-:>r~.
/i
i
\
I
Jrsu?
..---..
co
'-'
I!
,
\\
~~ ~;
:i.
.::' ~
/.'. S8J
....:.... "'0<..<. Bt.",.
{4f"
>-
~
,,'L'
~
-N-
~
lAl<E OR. .
...............(4y......t
.................
<(
:2
,..
""
. '\
\.
..\
Conklin ~orter and Holmes
~ [p) EJIIQIIIEERS, IIIC.
lIo-t ( RC:6lHSCN SntttT
Ol;U..IoOO. f\.o:MA ~CC\
Tn. 4:}7 42~0452
"~";:7 G4,&-1o..)!l
EXISTING ROADWAYS
AR1ERI.AL ROADWA Y$
COlLECTOR ROADWAYS
STATE AND COUNTY FUNDED
-.-.-.- STATE FUNDED
IMPROVEJ.lEN'TS
. .............. COUNTY ruNOEO
IMPRO~~ENTS
MUNICIPAL IMPACT FEE FUNDED
OE~LCffR FUNOED
IM?RO~~ENTS
IMPACT fEE
IMPRO~~ENTS
FUNCTIONAL CLASSIFICATION
P A PRlNClPAL ARTERIAL
M A MINOR ARTERIAL
R A RURAl ARTERIAl
Me MMJR COlLECTOR
eM C COUNTY MINOR COLLECTOR
tlOTE, ALL HIGHUGHTEO ROADS NOT lA8mo
ME J.lUNJOPAl CCUECTORS.
NUMBER OF LANES
( 4) UUMB(R OF ROADWAY LANES
NOTE: ROADWAYS NOT lABELED HAVE TVvO LANES.
SCAlE; NT$
OAT'(; 6-27-97
2010 FUlURE TRAFFIC
CIACULA nON MAP
..()8 NO.: W'J..459.01