HomeMy WebLinkAbout1997 05 12 Consent Item F COMMISSION AGENDA ITEM F REGULAR CONSENT X INFORMATIONAL May 12. 1997 Meeting MGR ((~DEPT /~ Authorization REQUEST: Public Works Department Requesting Authorization to Enter into a Contractual Agreement for Street Resurfacing PURPOSE: The purpose of this Board item is to request authorization to enter into a contractual agreement with MacAsphalt for street resurfacing at a cost of $88,483.30 plus a 10% contingency. CONSIDERA TIONS: This project is needed to resurface City streets to extend their useful life. Bids for this resurfacing project were opened on March 19, 1997 under Bid # 97-006. The low bidder was Mac Asphalt of Winter Haven, Florida, with a bid $88,483.30. The project scope of work includes resurfacing, manhole adjustment rings, blue hydrant reflectors. Streets included in this years contract are Brentwood Drive, Meadowbrook Drive, Tuscora Drive (from Northern Way north to the proposed trail), Riunite Circle, George Street, Albert Street, David Street, Bennett Street, Edwin Street, Charles Street, and Frank Street. FUNDING: The project was budgeted in the current fiscal year in the Transportation Improvement Fund Capital Improvement line code (56310) at an estimated cost of $69,400. However, $40,000 was also budgeted for a Public Works Compound design which will not May 12, 1997 Consent Agenda Item F Page ..2 be expended this year and can be used for this project. Funds would be expended over the next 120 days. RECOMMENDATION: It is recommended that authorization be given to enter into a contractual agreement with MacAsphalt for street resurfacing at a cost of $88,483.30 plus a 10% contingency payable from the capital improvements line code (56310) of the Transportation Improvement Fund. IMPLEMENTA TION SCIffiDULE: The scope of work will be completed within 120 days of approval. A TT ACHMENTS: 1. City Clerk Summary - Bid #97-006 2. Proposal and Agreement COMMISSION ACTION: Attachment No. 1 CITY OF WINTER SPRINGS, FLORIDA 1126 EAST STATE ROAD 434 WINTER SPRINGS, FLORIDA 32708-2799 Telephone (407) 327.1800 Project Title: STREET RESURFACING Bid Number: 97-006 Bid Opening Date: MARCH 19, 1997 The bid opening was called by: J.P. PETRENCSIK Bid Opened: 2:00 P.M. Bid Closed: 2: 15 P.M. Present as witness: Nancy V obornik, Purchasing Secretary Chris Murphy, Stormwater Utility Manager Bid Bond Required: YES Performance Bond Required: YES Three Bids Received: 1. MARTIN PAVING COMPANY, 1801 SOUTH NOVA ROAD, SOUTH DAYTONA, FLORIDA 32119-1733 IN THE AMOUNT OF $88,818.38. 2. ORLANDO PAVING COMPANY, P.O. BOX 547186, ORLANDO, FL 32854-7186 IN THE AMOUNT OF $101,473.20. 3. l\tIACASPHALT, P.O. BOX 1819, WINTER HAYEN, FLORIDA 33882-1819 IN THE AMOUNT OF $88,483.30. cc: Purchasing Department City Manager Public Works Department BID NO. 97-006 Attachment No. 2 Page -.JL of~ PROPOSAL AND AGREEMENT It is intended that payment for all work done under the Contract Documents, including the furnishing of all labor, equipment and materials and the performing of all operations in connection with the construction of NEW WEARING COURSE OF NO LESS THAN ONE (1) INCH OF COMPACTED TYPE I or S-3 ASPHALTIC CONCRETE ON CERTAIN DESIGNATED CITY STREETS will be made under the following pay items. Other work for which there is not a pay item will be considered included in the contract Unit Price for the various pay items and no additional compensation will be allowed. A mix design will be required to be submitted to the City Engineer for approval. If recycled asphalt-concrete is used, it must be less than 30 percent and must be shown on the mix design. The Owner reserves the right to alter the Plans, extend or shorten the improvement, add such incidental work as may be necessary, and increase or decrease the quantities of work to be performed to accord with such changes, including the deduction or cancellation of anyone or more of the Pay Items. Such changes shall not be considered as a waiver of any conditions of the Contract nor to invalidate any of the provisions thereof. A supplemental agreement between the contractor and the Owner will be required when such changes involve a net increase or decrease in the total amount of the original contract of more than twenty-five percent (25 %). Should such changes result in changes in the quantities of the work to be performed, the Contractor will accept payment according to Contract Unit Prices for such items of work as appear in the original contract. The work will be done in compliance with the contract Documents and paid for under the Pay Items herein listed. Quantities shown on the Plans shall govern over those shown herein. The contractor shall take no advantage of any apparent error or omission in the Plans or Specifications, and the Engineer shall be permitted to make such corrections and interpretations as may be deemed necessary for the fulfillment of the intent of the contract Documents. The undersigned agrees that his Bid as stipulated herein shall be valid for a period of thirty (30) days from that date of this Bid opening. The proposal guaranty of the three lowest bidders shall be held for that period or until an award of the contract is made. The undersigned agrees to start construction of this project within 30 calendar days after notice of award of contract and notice to proceed, and to guarantee completion of the work within 45 calendar days thereafter. BID NO. 97-006 Page n-. of29- FOR THE CONTRACTOR FOR THE CITY OF WINTER SPRINGS SIGNA TURE SIGNA TURE NAME Ronald W. McLemore NAME TITLE City Manager TITLE NAME OF CONTRACTOR DATE ADDRESS NOTARY PUBLIC