HomeMy WebLinkAbout1996 09 09 Consent Item A COMMISSION AGENDA ITEM A REGULAR CONSENT X INFORMATIONAL September 9. 1996 Meeting MGR ftt/r' /DEPT I~~ Authorization REQUEST: Public Works Requesting Authorization to Enter Into a Contract Agreement for the Replacement of the Hayes Road Bridge and Associated RoadwaylDrainage Improvements PURPOSE: The purpose of this Board item is to request authorization to enter into a contract agreement with Prime Construction Group, Inc. for the replacement of the Hayes Road Bridge and associated drainage improvements at a cost of$348,800.00 plus a 10% contingency. CONSIDERATIONS: This project is needed to prevent further damage to public and private property. The project scope of work is for the replacement of the Hayes Road bridge over Gee Creek including the pedestrian walkway, raising the Hayes Road/Alton Road intersection approximately 1.2 feet, and eliminating the open drainage ditch from that intersection. The bridge, constructed in 1961, has been detennined to be ''functionally obsolete" according to the 1996 DOT bridge inspection report. The pedestrian walkway was identified as a flow restriction for the 25 year storm event in the Gee Creek study by Singhoffen & Associates. It is our intent to salvage the steel walk bridge for possible use by the Parks Department at Moss Road Park. The Hayes Road! Alton road intersection is low and has traditionally been the first road to be closed during major storm events including twice in 1995. As Hayes Road is September 9, 1996 Consent Agenda Item A Page -2 the only current collector road serving the North Orlando Ranches area from the north, it is imperative that this road remain open during times of emergencies. Bids for #96-022 were opened August 21, 1996. The low bidder was Prime Construction Group, Inc. of Orlando with a low bid of$348,800.00. Prime Construction Group, Inc. has previously satisfactorily performed several stormwater and utility projects for the City and is currently finishing the Utility Emergency Power Improvements project. FUNDlNG: Funds are available in the Capital Projects line code of the Transportation Impact Fee Fund for this project. The bid cost is $348,800.00 which is below the engineer's estimate of$380,000. The funds for this project will be expended within 180 days of issuance of the Notice To Proceed. RECOMMENDATION: It is recommend that authorization be given to enter into a contract agreement with Prime Construction Group, Inc. For the replacement of the Hayes Road bridge and associated drainage improvements at a cost of$348,800.00 plus a 10% contingency. IMPLEMENTATION SCHEDULE: This work will be completed within 180 days of issuance ofa Notice To Proceed. We expect to receive the St. John's River Water Management District construction permit September 9, 1996 September 9, 1996 Consent Agenda Item A Page.], October 31, 1996. Construction is anticipated to begin in the December/January time frame. Hayes Road at the bridge will be closed for up to 90 days. Signs will be posted prior to closure and a detour route will be provided by the contractor. ATIACHMENTS: 1. Agreement Form 2. City Clerk Bid #96-022 Tabulation 3. Consultants Recommendation 4. Typical Installation Process for Con Span Type Bridge COMMISSION ACTION: Attachment No. 1 r SECTION 00500 I AGREEMENT FORM I 1. GENERAL 1.01 THIS AGREEMENT, made this _ day of , 199_0 by and between (1) the City of Winter Springs 0 hereinafter called the OWNER, and (2) doing business as a (3) , and hereinafter called the CONTRACTOR. 1.02 WHEREAS, the OWNER and the CONTRACTOR are desirous of entering into an Agreement for cm:tu:i:n of a by CONTRACTOR for OWNER. NOW, THEREFORE, for and in consideration of the mutual promises hereinafter exchanged the parties agree as follows: 1. Contract Documents - The Contract Documents consist of this Agreement; all Technical, General, and Supplementary Conditions and Sections contained in the Project Manual; the Drawings as listed on the Bid Form and Index to Drawings; all Addenda issued prior to and all Change Orders issued after execution of this Agreement. TIlese form the Contract and all are as fully a part of the Contract as if attached to this Agreement or repeated herein. 2. Scope of Work - The CONTRACTOR shall perform all work required by the Contract Documents for the construction of Haves Road Bridae Replacement 3. Contract Time - The CONTRACTOR shall begin work within ten (10) days after the issuance of a written Notice to Proceed and shall complete the work within one hundred fifty (180) calendar days from the date of the Notice to Proceed. 4. Liauidated Damaaes - OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not substantially complete within the time specified in Paragraph 3 above, plus any extensions thereof allowed in accordance with the General Conditions. They also recognize the delays, expense, and difficulties Involved in proving in a legal arbitration proceeding the actual loss suffered by OWNER if the Work is not substantially complete on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER $500.00 for each day that expires after the time specified in Paragraph 3 for final completion until the work is finally complete. 5. Contract Price. Lump Sum Contract - The OWNER will pay the CONTRACTOR in current funds for the performance of the work, subject to additions and deductions by Change Order, the Total Contract Price of Dollars ($ ). Payments will be made to the CONTRACTOR based on the Lump Sum Bid amount, the Schedule of Values, and subject to completion of the work, in accordance with the Contract Documents. (1) OWNER (2) CONTRACTOR (3) Sole Proprietor, Partnership, or Corporation 00500-1 NOTE: If the Contractor intends to install pipe by some other method than trenching under the definitions found in the Florida Trench Safety Act (90-96, Laws of Florida), he shall so indicate by outlining in the space provided below the method he proposes and how it will comply with the Florida Trench Safety Act and related OSHA Standards for the Owner's evaluation. The Cost of accomplishing the work by any alternate methods to trenching is included in the bid prices shown in the Contractor's Proposal. Outline of Alternate Method: Submitted, signed and sealed this _ day of ,19_. CONTRACTOR By: Name Title Business Address ATTEST: Signature Seal END OF SECTION 00430-2 Attachment No.2 CITY OF WINTER SPRINGS, FLORIDA 1126 EAST STATE ROAD 434 WINTER SPRINGS. FLORIDA 32708-2799 Telephone (407) 327-1800 PROJECT TITLE: Hayes Road Bridge Replacement BID NUMBER: 96-022 BID OPENING DATE: August 21, 1996 The bid opening was called by: J.P. Petrencsik Title and Time: Purchasing Director Bid opening was closed: 2:03 p.m. 2:10 p.m. Present as witness: Christopher Murphy, Stonnwater Utility Manager Terry Zaudtke. Consulting Engineer Nancy Vobomik. Purchasing Secretary Bid Bond Required: YES Performance Bond Required: YES --------------------------------------------------------------------------------------------------------------------------------- Four Bids Received: 1. Gibbs & Register, Inc., III N. Orange Avenue, Suite 1440, Orlando, FL 32801 in the amount of$359,000.00. 2. Encore Construction Company, P.O. Box 151510, Altamonte Springs, FL 32715 in the amount of$398,000.00. 3. Prime Construction Group, Inc., 5528 Force Four Parkway, Orlando, FL 32839 in the amount of$348,800.00. 4. Central Florida Underground, Inc., 990 Miller Drive, Altamonte Springs, FL 3270 I in the amount 0[$355,000.00. -=rftiM~ Martha Jenkins, u City Clerk cc; Utility Department City Manager Purchasing Department Attachment No.3 Conklin, ~orter and Holmes @ LQ) ENGINEERS, INC. a 1104 E. ROBINSON STREET ORLANDO, FLORIDA 32801-2092 TEL 407-425-0452 FAX # 407 -648- 1036 August 26, 1996 Mr. Ron McLemore City Manager City of Winter Springs 1126 East S.R. 434 Winter Springs, Fl. 32708 RE: City of Winter Springs - Hayes Road Bridge Improvements Bid No. CPR Project No. W0464.00 Dear Mr. McLeMore: . On Wednesday, August 21, 1996, the City received bids for the Hayes Road Bridge Improvements. Copies of the bids were made and provided to us for review. The following is a summary of the bidders and their associated bid prices: Contractor Base Bid Price Prime Construction Group, Inc. $ 348,800.00 Central Florida Underground $ 355,000.00 Gibbs & Register $ 359,000.00 Encore $ 398,000.00 Engineer's Estimate of Probable Construction Cost $ 380,000.00 The bid was for a lump sum cost for a new bridge, roadway improvements, drainage improvements and associated work. Therefore, no bid tabulation is provided. Prime Construction Group has performed previous work for the City and CPH. Their work for the City has been above average and has been performed in a timely manner. In their most recent project for the City, they are constructing the Emergency Power Improvements for the City's water and wastewater facilities. A review of references and other data reveals that they are capable and competent contractor and that they are able to perform the project work. Conklin, ~orter and Holmes ENGINEERS, INC. a 1104 E. ROBINSON STREET @ rc=)) ORLANDO, FLORIDA 32801-2092 P TEL 407-425-0452 FAX #407-648-1036 In summary, we have no objection to the City's award of this project to Prime Construction Group, Inc. based on available information and their base bid price of$348,800.00. If you have any questions, please give me a call. Sincerely, 1MZ/arnl W0464910.mcl/tmzJd3 ~SPAN" BRIDGE SYSTEMS 800/526-3999 The Process 3 7:~~; . .. .~. ~'~~~"~ , .. '- "'':;~'' Manufacture Quality is assured through controlled conditions for plant-produced concrete products. 7 Joint Seal Commercia.1 joint wrap is applied as a seal between precast units. t:J I I I I I I I I I I I I I I I I 4 Transportation Entire structure arrives on schedule ready for installation. 8 Wingwalls Setting of precast wingwalls completes bridge. Design State of the art design procedures utilize advantages of unique shape. 5 Foundation Strip footings or slab base can be either cast in place or precast. 9 Backfill Structure stiffness and vertical walls of unit allow backfill to be placed rapidly and effectively. 2 Reinforcing Reinforcing cages are pre-assembled to meet site-specific requirements. 6 I ,. {:"-' .~\. '/~';.~~'t~." !I!~';r..;---'-; ~~o-'~ ,- ~~~'~',.:.~"," - ~. ~. . ./-';~""::-' ....,-..-- ..\'.~ I./~:'" .-~.::-<.. I . ~~~ \ J ',.;Ait -'" . '.';"1:' ' .. ~,.' ~'ft;! .1:1 .o~" I . I - . - ,...',""'" 1 *' \ (.'".. . . ::..",,~_~~'~ -. I':.~- ..!$!>..~.' -: '......"i:1 _t i: ~ 1~~ ~:~ . - . . Installation Precast units are quickly and precisely set in place. 10 )::0 rl' rl' OJ (") ::l" 3 ()) ::l rl' :z o . ~ Finished bridge It is economical, durable, quickly installed and looks great.