HomeMy WebLinkAbout1996 06 10 Informational Item B
COMMISSION AGENDA
ITE M
B
REGULAR
CONSENT
INFORMATIONAL X
June 10. 1996
Meeting
MGR ,11/'" IDEPT IJI-
Authorization
REQUEST: Public Works Department/Stormwater Division Providing an Update of the
Proposed Emergency Stormwater Piping Replacement at 444/446 A1derwood
Court.
PURPOSE: The purpose of this Board item is to keep the City Commission informed as to the
progress of the emergency stormwater pipe replacement at 444/446 Alderwood
Court as authorized at the May 13, 1996 City Commission meeting.
CONSIDERATIONS:
The City Commission authorized emergency repairs to the stormwater piping
system at 444/446 Alderwood Court at the May 13, 1996 City Commission at a cost of up
to $40,000. The City currently had a contract with the low bidder of Bid #96-006, Prime
Construction Group Inc., for the Shore Road Culvert Replacement and stormwater piping
installation at the Grove Counseling Center on Old Sanford Oviedo. A change order to
the original contract was negotiated with Prime Construction Group for $39,843.00 to
perform the emergency repairs. The original estimate was approximately $43,500 but we
were able to lower the contract price by the City supplying the pipe material and
concessions by the contractor. We may be able to provide the 12" replacement pipe at no
cost by reusing the 12" PVC water or reclaimed water mains that the S.R 434 contractor
is replacing that are only 3 years old.
As stated at the City Commission meeting, we need a 15' drainage easement from
both resident to perform the necessary work. We have located a 15' drainage easement
June 10, 1996
Informational Agenda Item B
Page-2-
for 444 Alderwood Court dedicated in 1982 to apparently perform repairs. The necessary
easement was forwarded to 446 Alderwood Court for execution on May 22, 1996.
The scope of work for the repairs is mobilization, swveying, wellpoint dewatering,
installation of240 feet of 12" pipe, headwall installation, manhole installation, grouting
existing pipe, and concrete and asphalt restoration. Weare tentatively scheduled to
commence construction on June 24, 1996 provided the necessary easement has been
executed and recorded.
IMPLEMENTATION SCHEDULE:
The replacement of the stormwater pipe is scheduled to commence on June 24,
1996 and will take approximately three weeks. There will be no disruption of traffic other
than the driveways of the two affected residents. Construction traffic will approach the
site from Alderwood Street via Murphy Road.
ATTACHMENTS:
1. Change Order #1 to Project #96-006
2. Prime Construction Group Inc. Emergency Repair Quote
COMMISSION ACTION:
None required.
~
Attachment No.1
/1'
..'\
of
CONTRACT CHANGE ORDER
Change Order No, 1
Engineer Project No. 96-006
Project TItle: Shore Road Culvert R~lacement & Old Sanford/Oviedo Road Ditch Tnwrovements
Contractor:
Prime Construction GrolW. Inc.
Reason for Change
, Alderwood Court.
Added scqpe of work to current contract - Stormwater r~airs at
Breakdown ofPrqposed Changes and Basis for P~ent
(Includes pertinent drawings, specifications, and documentation where necessary)
Item No. and Description Change in Contract
Cost +(-)
1. Materials and Labor to perform emergeny repairs to $39,843,00
stormwater drainage system at Alderwood Court.
(See Attached Breakdown)
(1) Total Proposed Change in Contract +(-)
Recommended By Department Head:
~
;faJ/j/~L
, ,--
$ 39.843.00
$ 97,500.00
$ -0-
$ 137.343.00
Date 03ff?
Date S' ))3 /9t
"
-? Date ~/) )J.;/'1t
(2) Original Contract Price
(3) Total All Previous Change Orders
(4) New Contract Price(Total of Item 1)
Accepted By Contractor: ~ ~
Accepted By Owner:
,
Attachment No.2
..
.
Prime Construction Group, Inc.
Ga28 Force POur Parkway PH (407) .......
0rtancI0, FL __ FX f407)-.e182
. P.O. Box ssaecJ7
0r1and0, R. ~ '
Florida Ucenses
CGC ~7!04
cuc~
May 13. 1998
Mr. KIp L.ockuIr. P.E
City otWmfer Springs
PH 327.2669
FX 327-0942
REVISED QUOTE
Reference: Emergency Storm Repair at CamphcrNood and Alderwood
Dear Kip:
11te breekdawn d CDSIS 110 canslnJct the abcMJ refl8Nneed pfOjec:t is as foI(Qws:
McbiIizaticn 1 LS.
LABOR:
Projea Manager
SUperU~
e Man Crew
4 Man Cr8w
labor Burden 0 48%
1 Wk
3Wk
2Wk
1 Wk
21.B71.~
Equlpmem
Superintendents Pidwp
Small Tgcjs. Sump Pumps
RubberTn Loader Backhoe
Traek ~Y&lDrfor Pipe Crew
Loader wi Forks far PIpe Crew
WelIpoint lleader RentaI1lnstalJatio
Wellpaint Pump Rental
~ Pump Rentat
Fuel
Mise Barricades
MateJ1a1
12'" SCR ~ &mn CIaIn PIpe Z40 LNFT
0Nner 1D Purchase this pipe at a price of approximately ..88 per lnft
and furnish tor.... by Prime Construction Group
3Wks
,1 LS.
1 Week
2Wk
2Wks
2eo lFNT
2 Week
2 Week
750 Gafs
1 LS.
12,251.60
SIDrm Manholes
Sane Under Slrudures
1Z" HeadwaJf
Mud and Bricks
Loads of Import Fill
Rowable Fill
Material Sales Tax
1 Each
4 Tons
1 Each
1 LS.
3 Each
15 CUYO
2,920.00
ZQ'd
dnO!l9 SH():) 3WI!ld
Z8t8 9S8 ~Q~ Z 8~:tt 96/~t/~e
~
\;
&ubconIIact
SuNey Wcdc In Fiefd
Office Preparation cf Sur.<ery
Haul off Debris. Asphalt. Cane.
Saw, Chip 0 Exist Structure
eonaete Drive 8"
Conc:n!te Sidewalk 4""
Repface CUrb (HandwoIk)
Sodding .
Wood Fence Replacement
Chain Unk Fence Replacement
SQwcut Asphalt
Reptace Base
Repfaca Asphalt
Asphalt Placement Subc:ontr8dDr
a.5 Hour
4.5 Hour
8 Load
1 Each
350 Sqft
2SO Sqft
30 lnft
2BO SQYO
30 LNFT
40 lNFT
1 LS.
270 Sqyd
32 Tons
1 LS. 3.000.00
$39.843.00
Please contaa us if you have any questions. Please issue us a pun::hase onjer and reference
tf1is proposal in order that we may ecpedite this project.
Sincerely.
Reynolds C. Holiman
VIce President