Loading...
HomeMy WebLinkAbout1996 06 10 Informational Item B COMMISSION AGENDA ITE M B REGULAR CONSENT INFORMATIONAL X June 10. 1996 Meeting MGR ,11/'" IDEPT IJI- Authorization REQUEST: Public Works Department/Stormwater Division Providing an Update of the Proposed Emergency Stormwater Piping Replacement at 444/446 A1derwood Court. PURPOSE: The purpose of this Board item is to keep the City Commission informed as to the progress of the emergency stormwater pipe replacement at 444/446 Alderwood Court as authorized at the May 13, 1996 City Commission meeting. CONSIDERATIONS: The City Commission authorized emergency repairs to the stormwater piping system at 444/446 Alderwood Court at the May 13, 1996 City Commission at a cost of up to $40,000. The City currently had a contract with the low bidder of Bid #96-006, Prime Construction Group Inc., for the Shore Road Culvert Replacement and stormwater piping installation at the Grove Counseling Center on Old Sanford Oviedo. A change order to the original contract was negotiated with Prime Construction Group for $39,843.00 to perform the emergency repairs. The original estimate was approximately $43,500 but we were able to lower the contract price by the City supplying the pipe material and concessions by the contractor. We may be able to provide the 12" replacement pipe at no cost by reusing the 12" PVC water or reclaimed water mains that the S.R 434 contractor is replacing that are only 3 years old. As stated at the City Commission meeting, we need a 15' drainage easement from both resident to perform the necessary work. We have located a 15' drainage easement June 10, 1996 Informational Agenda Item B Page-2- for 444 Alderwood Court dedicated in 1982 to apparently perform repairs. The necessary easement was forwarded to 446 Alderwood Court for execution on May 22, 1996. The scope of work for the repairs is mobilization, swveying, wellpoint dewatering, installation of240 feet of 12" pipe, headwall installation, manhole installation, grouting existing pipe, and concrete and asphalt restoration. Weare tentatively scheduled to commence construction on June 24, 1996 provided the necessary easement has been executed and recorded. IMPLEMENTATION SCHEDULE: The replacement of the stormwater pipe is scheduled to commence on June 24, 1996 and will take approximately three weeks. There will be no disruption of traffic other than the driveways of the two affected residents. Construction traffic will approach the site from Alderwood Street via Murphy Road. ATTACHMENTS: 1. Change Order #1 to Project #96-006 2. Prime Construction Group Inc. Emergency Repair Quote COMMISSION ACTION: None required. ~ Attachment No.1 /1' ..'\ of CONTRACT CHANGE ORDER Change Order No, 1 Engineer Project No. 96-006 Project TItle: Shore Road Culvert R~lacement & Old Sanford/Oviedo Road Ditch Tnwrovements Contractor: Prime Construction GrolW. Inc. Reason for Change , Alderwood Court. Added scqpe of work to current contract - Stormwater r~airs at Breakdown ofPrqposed Changes and Basis for P~ent (Includes pertinent drawings, specifications, and documentation where necessary) Item No. and Description Change in Contract Cost +(-) 1. Materials and Labor to perform emergeny repairs to $39,843,00 stormwater drainage system at Alderwood Court. (See Attached Breakdown) (1) Total Proposed Change in Contract +(-) Recommended By Department Head: ~ ;faJ/j/~L , ,-- $ 39.843.00 $ 97,500.00 $ -0- $ 137.343.00 Date 03ff? Date S' ))3 /9t " -? Date ~/) )J.;/'1t (2) Original Contract Price (3) Total All Previous Change Orders (4) New Contract Price(Total of Item 1) Accepted By Contractor: ~ ~ Accepted By Owner: , Attachment No.2 .. . Prime Construction Group, Inc. Ga28 Force POur Parkway PH (407) ....... 0rtancI0, FL __ FX f407)-.e182 . P.O. Box ssaecJ7 0r1and0, R. ~ ' Florida Ucenses CGC ~7!04 cuc~ May 13. 1998 Mr. KIp L.ockuIr. P.E City otWmfer Springs PH 327.2669 FX 327-0942 REVISED QUOTE Reference: Emergency Storm Repair at CamphcrNood and Alderwood Dear Kip: 11te breekdawn d CDSIS 110 canslnJct the abcMJ refl8Nneed pfOjec:t is as foI(Qws: McbiIizaticn 1 LS. LABOR: Projea Manager SUperU~ e Man Crew 4 Man Cr8w labor Burden 0 48% 1 Wk 3Wk 2Wk 1 Wk 21.B71.~ Equlpmem Superintendents Pidwp Small Tgcjs. Sump Pumps RubberTn Loader Backhoe Traek ~Y&lDrfor Pipe Crew Loader wi Forks far PIpe Crew WelIpoint lleader RentaI1lnstalJatio Wellpaint Pump Rental ~ Pump Rentat Fuel Mise Barricades MateJ1a1 12'" SCR ~ &mn CIaIn PIpe Z40 LNFT 0Nner 1D Purchase this pipe at a price of approximately ..88 per lnft and furnish tor.... by Prime Construction Group 3Wks ,1 LS. 1 Week 2Wk 2Wks 2eo lFNT 2 Week 2 Week 750 Gafs 1 LS. 12,251.60 SIDrm Manholes Sane Under Slrudures 1Z" HeadwaJf Mud and Bricks Loads of Import Fill Rowable Fill Material Sales Tax 1 Each 4 Tons 1 Each 1 LS. 3 Each 15 CUYO 2,920.00 ZQ'd dnO!l9 SH():) 3WI!ld Z8t8 9S8 ~Q~ Z 8~:tt 96/~t/~e ~ \; &ubconIIact SuNey Wcdc In Fiefd Office Preparation cf Sur.<ery Haul off Debris. Asphalt. Cane. Saw, Chip 0 Exist Structure eonaete Drive 8" Conc:n!te Sidewalk 4"" Repface CUrb (HandwoIk) Sodding . Wood Fence Replacement Chain Unk Fence Replacement SQwcut Asphalt Reptace Base Repfaca Asphalt Asphalt Placement Subc:ontr8dDr a.5 Hour 4.5 Hour 8 Load 1 Each 350 Sqft 2SO Sqft 30 lnft 2BO SQYO 30 LNFT 40 lNFT 1 LS. 270 Sqyd 32 Tons 1 LS. 3.000.00 $39.843.00 Please contaa us if you have any questions. Please issue us a pun::hase onjer and reference tf1is proposal in order that we may ecpedite this project. Sincerely. Reynolds C. Holiman VIce President ('0'... AnOM9 ~NO~ 3WIMd zata 9~a ~e~ Z 6~:It 9~/~t/~e