HomeMy WebLinkAbout1996 05 13 Consent Item C , COMMISSION AGENDA ITEM c REGULAR CONSENT X INFORMATIONAL May 13~ 1996 Meeting MGR I! /vh1 /DEPT ;IV Authorization REQUEST: Public Works DepartmentlUtility Division Requesting Approval to piggyback off of the City of Port Orange's Bid #92-24 for the Relining of Gravity Sewer Mains. PURPOSE: The purpose of this Board item is to request approval to piggyback off of the City of Port Orange's Bid #92-24 for the relining of gravity sewer mains by Madsen/Barr Corporation at a cost of $98,226.00. CONSIDERATIONS: The City of Winter Springs has an ongoing program to reduce infIltration/inflow in the gravity sewer system. Infutration/inflow causes increased flow during wet weather periods which reduces availability of treatment plant capacity and increases treatment costs. The City has for the last four years relined approximately one mile per year of leaking gravity sewer mains. The relining process installs a high density polyethylene liner in the main which eliminates all joints in the relined main. Joints are the primary source infutration from groundwater. The City of Port Orange has valid contract #92-24 through June 27, 1997 for sewer main relining on a unit cost basis. The bid has been annually awarded to Madsen/Barr Corporation since 1992 with no increase in the bid unit costs. The City of Winter Springs has used the services ofMadsen/Barr Corporation for the last four years with no increase in the unit cost price piggybacking off of the City of Port Orange's 1992 '\ May 13, 1996 Consent Agenda Item C Page 2... bid. The unit cost is $37.00 per foot for 8" pipe, $40.00 per foot for 10" pipe, and $180.00 for each service line conneciton. We are proposing for the current scope of work to include the relining of 730 feet of 10" pipe, I, 778 feet of 8" pipe, and the reconnection of 18 service laterals. The work will be performed on Alton Road, Shore Road, Sheoah Boulevard and First Street. The total cost will be $98,226.00. FUNDING: Monies are budgeted in the Utility Enterprise Fund Renewal and Replacement line code (3600-59110) for this project. $100,000 has been allocated for sewer main relining which is sufficient for the scope of work. RECOMMENDATION: I am recommending that the authorization be given to piggyback off of the City of Port Orange's Bid #92-24 to utilize the services of Madsen-Barr Corporation for sewer main relining at a cost of $98,226.00 to be paid from the Renewal & Replacement line code (3600-59110). IMPLEMENTATION SCHEDULE: This work will completed within thirty days of receipt of a purchase order. Funds will be expended by June 30, 1996. No disruption of traffic will occur on Sheoah Boulevard, Alton Road, Shore Road and First Street during this project. ATTACHMENTS: 1. Madsen-Barr Corporation Agreement Letter for Contract Extension COMMISSION ACTION: 4072609318 MADSEN/BARR-ALLWASTE 050 P02 MAY 01 '96 12:12 ~ . ~ MADSEN/BARR-allwaste, Inc. 109 Applewood Drive · Longwood, FL 32750 (407) 260-9668 · FAX: (407) 260-9318 April 22, 1996 Mr. Randy Stevens. P. E. Public Utilities Director City of Port Orange P.O. Drawer 291038 Port Orange, FL 32128.1038 RE: Bid #92-24 Sewer Pipe Lining Dear Mr. Stevens: Madsen/Barr-allwaste, Inc. agrees to extend the unit prices in our current open-end contract with the City of Port Orange for another 12 month period through June 27, 1997. Although there have been increases in both the cost of pipe and our licensing fees, CSR Pipeline Systems (previously Pipe Liners , Inc. and Quail Pipe Corp.) has agreed to work with us in honoring these units for an additiona/12 months. The current unit prices are as follows: Furnish & Install 6" Liner (less than 500 LF) (500 to 1,000 LF) (more than 1,000 LF) $ 39.00/LF $ 37.00/LF $ 35.00/LF Furnish & InstallS" Liner (less than 500 IF) (500 to 1,000 LF) (more than 1,000 LF) $ 40.00/lF $ 3S.50/LF $ 37.00/LF Furnish & In5ta1l10" Liner (less than 500 IF) (500 to 1,000 LF) (more than 1,000 LF) $ 43.00/LF $ 41.50/LF $ 40. OO/LF U-7J...E r~(, IPE " .1 TRfNCHLESS PIPELINE RECONSTRUCTION 4072609318 MRDSEN/BARR-ALLWASTE 050 P03 MAY 01 '96 12:12 r. -'j: Furnish & Install 12" Liner. (less than 500 LF) (500 to 1,000 LF) (more than 1,000 LF) $ 60.00/LF $ 58.50/LF $ 56.00/LF Reconnect existing services using internal cutter 4" Reconnect existing services using internal cutter 6" $ 180.00/EA $ 180.00/EA . Prices for 12" liner have been added to the original contract. The Cities of Winter Park, Winter Springs and Edgewater are among the municipalities that use the Port Orange contract to "piggy-back" lining work, Again, with the cooperation of CSR Pipeline Systems, we are also able to extend these prices to them and others. We hope this meets with your approval. Assuring you of our cooperation at all times... MH/mep Attachments Cc: Robert H. Madsen, MBA Gordon Anthony. MBA Sandy Pellittieri, CSR Bob Fisher, CSR