Loading...
HomeMy WebLinkAbout1996 02 12 Consent Item B COMMISSION AGENDA ./ ITEM B REGULAR CONSENT X INFORMATIONAL February 12, 1996 Meeting y/- MGRA'J-VV /DEPT /' Authorization REQUEST: Public Works Department/Utility Division is Requesting Authorization to Enter into a Contract Agreement for the Construction of Well #6. PURPOSE: The purpose of this Board item is to authorize the City Manager to enter into a contractual agreement with American Drilling, Inc. for the construction of Well #6 at a cost of$130,000 plus a 10% contingency. CONSIDERATIONS: The construction of Well #6 is needed to provide a backup well for Water Treatment Plant #2 which is located in the Highlands. On December 6, 1995, bids for Bid #96-004 Well #6 Construction were opened. The low bidder was American Drilling, Inc. of Lutz, Florida with a bid of$130,000.00. The check of American Drilling's references found no problems. Well #6 will be the second well for Water Treatment Plant #2. WTP#2 is located on Sheoah Boulevard in the Highlands near the tennis courts. Both the other two water plants have at least one backup well. Well #6 would be constructed east of Sheoah Boulevard and north of Cleam Court in a large common area. The piping and electrical conduit are already in place. FUNDlNG: This project was budgeted in the current fiscal year under the Utility Departments Capital Improvement Budget (#56310) at an estimated cost of$95,000. We have saved enough on other capital improvement projects to cover the $35,000 cost differential. Funds for this item will be expended within 150 days of issuance of the Notice To Proceed. RECOMMENDATION: I am recommending that the City Manager be authorized to enter into a contractual agreement with American Drilling, Inc. For the construction of Well #6 at a cost of$130,000 plus a 10% contingency. The project would be fimded out of the Utility Department Capital Improvement line code. IMPLEMENTATION SCHEDULE: The contract time for this project is 150 days with an estimated completion date of August 1, 1996. No disturbance to the water supply or traffic flow in the area is anticipated. Actual drilling should take approximately 30 days. Residents in the area will be notified prior to construction. ATTACHMENTS: 1. Agreement Form 2. City Clerk Bid 96-004 Summary 3. Consulting Engineer Recommendation COMMISSION ACTION: I. ", . . ir' ('\ i r--- I ." Attachment' No.1 SECTION 00500 ..;.,.--~. .~~~ = :;II ,:l .~ '" I .... I"~' '" .~ ';~II!. .-.1.... .. Ii ::- iilll J:;j ~~ "', ?~y~Y~~!'!1$ AGREEMENT FORM 1. GENERAL. 1.01 THIS AGREEMENT, made this _ day of / 199.6 by and between (1) the City of Winter Sprinos , hereinafter called the Owner, and (2) American Drillinq Inc. doingbusinessasa (3) / and hereinafter called the Contractor. 1.02 The Owner and Contractor agree as follows: A. Contract Documents --; 1- The Contract Documents consist of this Agreement; all Technical, General, and Supplementary Conditions and Sections contained in the Project Manual; the Drawings as listed on the Bid Form and Index to Drawings; all Addenda issued prior to and all Change Orders issued after execution of this Agreement. These form the Contract and all are as fully a part of the Contract as if attached to this Agreement or repeated herein. 'I' .-~." i, :,,~.; .~~- -'~""""~!:':.: ~.., ....To.,.."'. -~~~.~_~;;1~' B. Scope of Work .. -. The Contractor shall perform all work required by the Contract Documents for the construction of Water Supplv Well No.6 .g .~ ~ - ~~!t~t~,. :~~~;".:~," C. Contract Time The Contractor shall begin work within 10 days after the issuance of a written Notice to Proceed and shall complete the work within 150 calendar days from the date of the Notice to Proceed. Installation of the well pump may occur after the contract completion date at no additional expense to the Owner. D. liquidated Damages ,. , . . ._'-~'._-~~~.' .....,......._-..-_~'""""'.'_'.L. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not substantially complete within the time specified in Paragraph C above, plus any extensions thereof allowed in accordance with the General Conditions. They also recognize tha delays, expense and difficulties involved in proving in a legal arbitration proceeding the actual loss suffered by OWNER if the Work is not substantia,lIy complete on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER $200.00 for each day that expires after the time specified in Paragraph C for final completion until the work is finally complete. E., Contract Price <:~~~~~;"-'. ----------- ~~ _~_'""""_=.;or....'__.'. 0-- __..______ _ The Owner will pay the Contractor in current funds for the performance of the work, subject to additions and deductions by Change Order, the Total Contract Price of 0 n e h tJ n d r p rt t h i r t y tho usa n d Dollars ($130.00 O..OBayments will be made to the Contractor for actual constructed quantities on the 6asis of the Schedule of Unit Prices included as a part of the Bid which shall be as fully a part of the Contract as if attached or repeated herein, and subject to completion of the work, in accordance with the Contract Documents. 00500-1 .j) jI(- ~. ._-::;tl .r---.. ( , (~ ~\ ;i:'Jal1l' f1 ... ',:g .$ " :.::r:. ;J '" F. Payments The Owner will make payments as provided in the General Conditions and Supplementary , ..Conditions. ' ~. :t ~.. "" G. Engineer The Project has been designed by Conklin, Porter & Holmes-Engineers, Inc., referred to in the documents as the Engineer, whose authority during the progress of construction is defined in the General Conditions and Supplementary Conditions. 1.03 ' IN WITNESS WHEREOF, the parties hereto have executed this Agreement the day and year first above written. CONTRACTOR: " ~ i American Drillinq Inc. Name of Firm (Seal) By (Signature and Title) Attest OWNER: City of Winter Springs Name of Owner (Seal) By (Signature and Title) Ronald W. McLemore, City Manager Attest '. ... r;".. _~.."WI'll~al!Q'".;o..,.:.;. ~ END OF SECTION ;Sl!~,r.;,. 00500-2 \ ' ; .-.., ( ( Attac~qlent No.2 "\, '\~~ CITY OF WINTER SPRINGS, FLORIDA 1126 EAST STATE ROAD 434 WINTER SPRINGS, FLORIDA 32708-2799 Telephone (407) 327-1800 PROJECT TITLE: Water Supply Well No.6 BID NUMBER: 96-004 BID OPENING DATE: December 6.1995 The bid opening was called by: J.P. Petrenscik Title and Time: Purchasing Director 2:04 p.m. Bid opening was closed: 2: 1 0 p,m. Present as witness: Doug Taylor. Assistant Utility Director N ancv V ohomik. Purchasing Secretary Bid Bond Required: YES Performance Bond Required: NO ---------------------------------------------------------------------------------------------------------~----------------------- Two Bids Received: 1. Meredith Environmental Services, P.O. Box 585648, Orlando, FL 32858-5648 in the amount of$145, 167.00. 2. American Drilling, Inc., 14811 N. 12th St., Lutz, FL 33549 in the amount of$130,000.00 1~~Clm ~ : cc: Utilities City Manager Purchasing L . ~.. . ~- .;. ..' Attac~ment No.3 ,'--'" I \ \ ( Conklin, I ~orter and Holmes @ ~ ~ ENGINEERS, INC. o 1104 E. ROBINSON STREET ORLANDO, FLORIDA 32801-2092 TEL 407 -425-0452 FAX # 407-648-1036 January 3, 1996 ~r. John Govoruhk City ~anager City of Winter Springs 1126 E. S.R. 434 Winter Springs, Florida 32708 RE: City of Winter Springs - Water Supply Well No.6 Bid No. 96-004 CPH Project No. W0446.01 Dear Mr. Govoruhk: On Wednesday, December 6, 1995, the City received bids for Water Supply Well No.6 at the various locations. Copies of the bids were made and provided to us for review. The following is a summary of the bidders and their associated bid prices: Contractor Base Bid Price . American Drilling $ 130,000.00 Meredith Environmental Services $ 145,167.00 Engineer's Estimate of Probable Construction $ 93,100.00 Cost A complete bid tabulation of all bids received is attached for your information. The majority of the additional cost for this project (above estimate) is attributable to the requirements of SJRW~D for the 4" test well. As can be seen in the summary, the two bids were very competitive, lUld within 11.0 percent of each other. ., .... .. r', ....-. , , American Drilling has not performed work for the City or any client of CPH and therefore we have no working knowledge of the contractor. A review of references and other data reveals that they are a capable and competent contractor and that they are able to perform the project work. No mathematical errors or mistakes were found in our review of the submitted bids. In summary, we have no objection to the City's award of this project to American Drilling based on available information and their base bid price of $130,000. If you have any questions, please give me a calL Sincerely, CONKLIN, PORTER & HOLMES - ENGINEERS, INC. ~ Terry M. Z dtke, P.E., DEE Senior Vice President TMZ/ja Enclosure: Bid Tabulation W0446Ol.GOV/d3 '!> 1.;,' American Meredith Engineering CONTRACTOR Drilling, Inc. Envir, Services Estimate Lutz Orlando BID Description Unit Quantity Unit Total Unit Total Unit Total ITEM Cost Cost Cost Cost Cost Cost TEST WELL 4 INCH DIAMETER 1 Mobilization! Demoobilization LS 1 7,420,00 7,420.00 1,400.00 1,400.00 1,000,00 1,000,00 2 F&I - 4" Well Casing FT 100 15.00 1,500,00 12.00 1,200,00 10,00 1,000.00 3 Drilling Open Borehole FT 400 8.00 3,200,00 6.00 2,400.00 5.00 2,000.00 4 Water Quality and Analysis Each 8 250.00 2,000.00 1,000,00 8,000.00 250.00 2,000,00 5 Geo h sical Well Surve LS 1 2000.00 2 000,00 2 500,00 2,500.00 2 000.00 2000,00 WATER SUPPL Y WELL NO.6 6 Mobilization! Demobilization LS 1 12,000,00 12,000,00 20,000,00 20,000.00 10,000.00 10,000.00 7 F & I - 24" Well Casing FT 100 83,00 8,300.00 62,00 6,200.00 65.00 6,500.00 8 Drilling Open Borehole - 23" FT 110 23,00 2,530.00 45.00 4,950,00 20.00 2,200,00 9 F & I - 16" Well Casing FT 210 28,00 5,880,00 ' 46.00 9,660,00 25.00 5,250.00 10 Grout 16" well Casing Sack 270 12.00 3,240.00 33.00 8,910.00 10.00 2,700,00 11 Drilling Open Borehole - 15" FT 220 16.00 3,520,00 26.00 5,720.00 15,00 3,300.00 12 F & I and ~emove Test Pump LS 1 2,500,00 2,500.00 4,500,00 4,500,00 2,500.00 2,500.00 I 13 Well Development Hour 24 90,00 2,160.00 125.00 3,000,00 90,00 2,160,00 ,~ 14 Aquifer Performance Test LS 1 7,500.00 7,500.00 6,480.00 6,480,00 5,000.00 5,000.00 15 Physical/Chemical Sampling and Testing LS 1 4,000.00 4,000.00 3,500.00 3,500,00 3,500.00 3,500.00 16 Disinfection LS 1 1,000,00 1,000.00 400.00 400,00 500,00 500,00 17 Bacteriological Testing LS 1 2,000,00 2,000.00 600.00 600.00 500.00 500.00 18 Priority Pollutant Testing LS 1 3,000.00 3,000.00 1,200.00 1,200,00 1,000,00 1,000.00 19 Punp and Motor Each 1 6,000,00 6,000.00 11,850.00 11,850.00 5,000.00 5,000.00 20 Well Column LF 70 175.00 12,250.00 71,60 5,012,00 70.00 4,900,00 21 Concrete Pedestal, etc, LS 1 20,000.00 20,000.00 23,310,00 23,310.00 20,000,00 20,000.00 22 Electrical LS 1 18000.00 18000.00 14375,00 14375,00 10000,00 10000,00 Total $130000,00 $145167,00 $93010,00 Additive Item 1 LS 1 2 000,00 2000,00 2500.00 2500,00 2000.00 2000,00 Additive Item 2 LF 500 10,00 5,000,00 12.00 6000.00 10,00 5000,00 Bid Bond Yes Yes N!A t ·