HomeMy WebLinkAboutPrime Construction Group Contract Change Order No. 2 -1997 01 04 7 ~';A.'(f"; " CI f~k. CONTRACT CHANGE ORDER Change Order No. 2 Engineer Project No. #97-023 Project Title: Lift Station #7W Improvements Contractor: Prime Construction Group, Inc. Reason for Change Replace inoperable 12" gate valves and rewire lighting and exhaust fan for lift station drywell Breakdown of Proposed Changes and Bac:;is for Payment (Includes pertinent drawings, specifications, and documentation where necessary) Item No. and Description Change in Contract Cost +(-) 1. Remove 12" Gate Valves and install 6" Plug valves $2,239.15 2. Electrical upgrades including new circuit, lighting, wiring and $1,760.00 conduit with receptacles and refeeding exhaust fan. (1) Total Proposed Change in Contract +(-) $ 3,999.15 (2) Original Contract Price $ 64,300.00 (3) Total All Previous Change Orders(Change Order No.1) $ 16,175.71 (4) New Contract Price(Total ofltem 1,2 & 3) $ 84,474.86 Recommended By Engineer: Date ///~/!8 Accepted By Contractor: Date I /'L-;/18 Accepted By Owner: Date /-.J '). -'ff /4-- ~ City of Winter Springs Projeot # LS #1W Improvements (In OFIW'IN~f( SP.~I~GS urr ST>N. '1 W"MRAOVElMiBNlIS CPA tW04AS!. Q~ Change Order #2 Description Worl<ed on opening and closing valve on Pump #2 discharge. Tried using City's hydraulic pump to open cheekvalve. Material: 8x4 flanges to connect pump: No Charge City brought jet pump, opened cl1eck valve but could not close it. Went to City at 1 :00 PM to discuss problem. Worked on locating FM and bypass connection to FM. Removed every other bolt on 12" discharge valves. Cut 55 rods for owner furnished valves, helped set up Iwdraulie pump, removed 12" gate valves, cleaned and scraped flange faces of City furnished valves. Removed two (2) 12" suction valves and prepped 6" plug valves and installed. TOTAL LABOR 75 hours Labor (Including burden) @ $15.00Jhr Filler Flanges Bypass Pump Date 11/11/97 I 'v . ~.;:; J. 1""' . C/ c: # Men # Hours Total 2 10 20 11/12/97 11/13/97 11/13/97 11/14/97 11/17/97 $ 1,125.00 $ 219.00 $ 580.00 $ 1,924.00 Contractor's Fee 15% $ 288.60 $ 2,212.60 Bond Premium $ 26.55 Total Adjusted Cost to Install New Valves on Suc/DischargG $ 2,239.15 Plus Electrical upgrades including new circuit, new lighting wiring and conduit with recepticles and refeedlng existing fan. S 1,760.00 TOTAL. CHANGE ORDER #2 $ 3,999.15 2 2 2 8 2.5 4 4 3 6 16 5 4 16 3 12 75