Loading...
HomeMy WebLinkAboutPrime Construction Group Contract Change Order No. 1 -1996 03 20 CONTRACT CHANGE ORDER Change Order No. Engineer Project No. W0464.01 Project Title: Hayes Road Bridge Replacement Contractor: Prime Construction Group. Inc. Reason for Change: Field required changes and additional work requested by Owner. Breakdown of Proposed Changes and Basis for Payment (Includes pertinent drawings, specifications, and documentation where necessary) V~ Item No. and Description Change in Contract Cost + (-) Additions and deletions as outlined in the attached letter. $ 9,358.03 (1) Total Proposed Change in Contract Cost +(-) (2) Original Contract Price (3) Total All Previous Change Orders (4) New Contract Price (Total of Item 1 & Item 4) $ 9.358.03 $ 348.800.00 $ 0.00 $ 358.158.03 Recommended By Engineer: :~i'~• Date: ~/ Z~! ~, Accepted By Contractor: f Date: 3'Z's Accepted By Owner: ~~ ~ Date: ~ ) a a ~ J`~ W046401.cha - ` 1 wPRIivIE CONSTRUCTION GROUP, INC. 5528 Force Four Parkway Post Office Box 590507 Orlando, FL 32809-0507 March 20, 1997 Conklin, Porter & Holmes Engineers, Inc. 1104 East Robinson Street Orlando, FL 32801 Attn: Terry Zaudtke, P. E. Re: Hayes Road Bridge Replacement Change Order #1 Dear Mr. Zaudtke: Telephone (407) 856-8180 Fax (407) 856-8182 The following is a Change Order proposal for your review and approval: The deleted items: 15" Headwall ($ 620.00) 24" Headwall ($ 830.00) 6' Chain Link Fence (+/- 30") ($ 648.00) 60' Storm Pipe ($ 750.00) 14' Sidewalk ($ 100.80) P-4 Inlets -Quantity of 2 (1760.00 Subtotal deleted amounts ($4708.80) Proposed items: Installation of 6' Aluminum Handrail $ 243.96 64' Curb Removal & Reinstall $ 720.80 Raised Trash Structure (top to meet curb) $ 480.00 Raised "C" Inlet $ 260.00 Install 6' x 21' Headwall $2100.00 Remove and haul off Railroad Ties $ 135.00 Realign & Extend Waterline $ 944.71 Modify Inlet Tops (Quantity of 2) $2240.00 Milled Asphalt (490 SY) $1166.00 Install 28+/- SY of Base at Additional Curb $ 620.00 Install approx. 173' of 4' Sidewalk $1245.60 Install 490 SY of Asphalt at 2" with 4' Transition 2620.00 Subtotal Proposed Amounts $12776.07 PCG Burden Amount 1290.76 Total $9358.03 Please call me at our office if you have any questions or need more information on this proposal at 407-856-8180. Respectfully, Thomas M. Perley Project Manager