Loading...
HomeMy WebLinkAboutPegasus Engineering LLC for SR419 and Wade Amendment -2009 06 09 AGREEMENT FOR SMALL SCALE ENGINEERING SERVICES AMENDMENT #1 This is Amendment #1 to the Agreement for Small Scale Engineering Services between the City of Winter Springs and Pegasus Engineering, LLC dated August 22, 2008. The Scope of Services for Amendment #1 shall be as described in the attached proposal from Pegasus Engineering, LLC dated May 14, 2009 (revised May 22, 2009). CITY: CITY OF WINTER SP NGS By: evir K. m t Print Name/Title: City Manager Date: 6/17/09 ENGINEER: By: Print Name/Title:' Date: 619 / Zwq ATTEST: By: Deputy C' y' lerk *THIS AMENDMENT IS ONLY VALID AGAINST THE CITY UPON APPROVAL BY THE CITY COMMISSION OF WINTER SPRINGS AND SIGNATURE BY EITHER THE MAYOR OR CITY MANAGER. Small Scale Engineering Services Agreement City of Winter Springs and Pegasus Engineering, LLC Amendment #I 1 P-9019R1 May 14, 2009 Revised May 22, 2009 Mr. Brian Fields, P.E. City Engineer City of Winter Springs 1126 E. State Road 434 Winter Springs, Florida 32708 RE: Wade Street and State Road 419 Roadway Improvements - Plans Revisions Proposal for Professional Engineering Services Dear Mr. Fields: Pegasus Engineering, LLC (PE) is pleased to present this proposal for professional engineering design and permitting services for the Wade Street and State Road 419 roadway improvements prc*t - plans revisions. The proposed revisions include (1) the addition of "key holes" along the proposed right turn deceleration lanes at Wade Street and at Sherry Avenue, and (2) revising the plans to split out the Wade Street improvements north of the railroad tracks, (3) splitting the Sherry Avenue turn-lane improvements into a separate set of plans, and (4) and splitting the quantities into three categories for bidding purposes, Wade Street improvement, Wade Street / SR419 improvements, and Sherry Avenue / SR419 improvements. SCOPE OF SERVICES Design, Cop&nctiaa Plans namtiou *ad Penu ttin 1. Revise the construction plans to add in the "key holes" at Wade Street and at Sherry Avenue. This includes revisions to the summary of pay items sheet, the drainage map, the project layout sheet, the typical section sheets, the summary of drainage structures sheet, the plan sheets, the profile sheets, the cross-section sheets, drainage structure sheets, the utility coordination sheets, and the signing and pavement marking sheets. 2. Revise the plans to delete the Wade Street improvements north of the railroad tracks, which will be constructed under a separate contract. 3. Split out the Sherry Avenue turn-lane improvements into a separate set of plans. 4. Split the quantities into three categories for bidding purposes; (1) Wade Street improvements, (2) Wade Street / SR 419 improvements, and (3) Sherry Avenue / SR 419 improvements. 5. Conduct utility coordination for the revised design. 6. Submit the construction plans to MOT for permitting review and approval. "Practical EnOineerina Solutions" 301 West State Road 434, Sulte 3, 09, Winter Springs, FL 32708 •407-992-9160 • flax 407.358-5155 pu8us us unglhow*W.nut Mr. Brian Fields, P.E. May 14, 2009 Revised May 22, 2009 Page 2 SCHEDULE P-9019R1 A thirty (30) day project schedule is anticipated to complete the construction drawing revisions. This time is exclusive of any review time by IMDOT and by the utility owners. Close coordination will be required in order to minimize the review time by the various agencies. PROFESSIONAL FEES Design Revisions and Construction Plans Preparation Revisions ......................................523,859.29 The attached sheet provides a breakdown of the manhours and fees. We appreciate the opportunity to submit this proposal and look forward to working with you. If you have any questions, please contact me. Very truly yours, PEGASUS ENV4WEERING, LLC 000, 3 S. S. Munied, P.E. Manager/Principal Attachment L-Troma1s1MM-9019.doo Mr. Brian fields, P.E. May 14, 2009 Revised May 22, 2009 Page 3 P-9019R1 City of Winter Sprhw Wade Street and State Road 419 Improvements Plana Reivsion PE Manhour and Fee Estimate Desian. Construction Plans Prwaratlon and Pwmltd Project Project CADD W.P/ Total Total ITEM Manager Engineer Tech. Secretary Hours Cost RATES $129.50 $106.25 $79.14 $48.92 Roadway Design 8 48 76 4 136 $12,346.32 Drainage Design 4 16 24 2 46 $4,215.20 Signing & Pavement 2 4 8 2 16 $1,414.96 Marking Utility Coordination 2 4 8 2 16 $1,414.98 Quantity Split 2 8 16 2 28 $2,473.08 Coordination With 2 4 0 2 8 $781.84 FDOT Quality Control 4 0 0 0 4 $518.00 /Constructability Review SUBTOTAL 24 84 132 14 254 $23,164.36 Survey/Right-of-Way $0.00 Geotech $0.00 Direct Reimbursables $694.93 TOTAL: $23,859.29