Loading...
HomeMy WebLinkAbout2000 11 13 Consent B Amendment 67 for Consulting Engineering Services COMMISSION AGENDA ITEM B CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR November 13,2000 Meeting MGR VIDEPT /fr Authorization REQUEST: Utility Department Requesting Authorization to Execute Amendment 67 for Consulting Engineering Services with Conklin, Porter & Holmes Engineers, Inc. PURPOSE: The purpose ofthis Board item is to request authorization for the execution of Amendment 67 for the Design of Well #4, Raw Water Piping and associated Water Distribution Piping for WTP #1 with Conklin, Porter & Holmes Engineers, Inc. at a cost of $22,760.00. CONSIDERATIONS: This amendment is needed to design well #4, raw water piping, and distribution extension at WTP #1 on Northern Way. The addition of the well has been anticipated and previously permitted with the St. Johns River Water Management District to meet projected water supply demands. The well is proposed to be installed on Utility property (Tract C of Tuscawilla Unit 8) near the intersection of Tuskawilla Road and the FP&L easement. A test well was constructed at this location last year with good water quality results. 1 VI.II1t~ ~. ~ November 13, 2000 Consent Agenda Item B Page 2 The scope of work includes design and permitting of a 12" well, raw water piping back to WTP #1, and distribution piping from WTP#l to Tuskawilla Road. The distribution piping will connect the new 12" main currently being installed on Tuskawilla Road to enhance distribution system pressures. The cost for the design scope of work is $22,760. The estimated construction cost is $325,000, FUNDING: The funding source for this project expenditure of $22,760.00 is the capital improvement line code of the Utility Enterprise 1997 Construction Fund - (#3630-56310), The funds for this project will be expended over the next 120 days. RECOMMENDA TION: It is recommended that authorization be given for the execution of Amendment 67 for the Design of Well #4, Raw Water Piping and associated Water Distribution Piping for WTP #1 with Conklin, Porter & Holmes Engineers, Inc. at a cost of $22,760.00 payabIe from the capital improvements line code of the Utility Enterprise 1997 Construction Fund - (#3630-56310). IMPLEMENTATION SCHEDULE: The scope of services will be completed within 120 days of approval. A TT ACHMENTS: 1. Amendment 67 COMMISSION ACTION: A TT ACHMENT NO. 1 AMENDMENT 67 TO AGREEMENT DATED NOVEMBER 27, 1984 FOR WELL 4 DESIGN, RAW WATER MAIN AND WATER DISTRIBUTION EXTENSION WTP 1 TO TUSCAWILLA BETWEEN THE CITY OF WINTER SPRINGS AND CPH ENGINEERS, INC. This Amendment dated , 2000, by and between the City of Winter Springs (hereinafter called the OWNER) and CPH Engineers, Inc, (hereinafter called the Engineer), is mutually agreed upon and declared an authorized Amendment to an Agreement dated November 27, 1984, between the parties, herein setting forth the scope, terms and conditions of the services herein authorized. The appropriate provisions of the Agreement apply as fully as if repeated herein. SECTION 1 GENERAL 1.1 The purpose of this Amendment is to provide for Engineering Services, more specifically itemized herein, in the preparation of Plans and Specifications for the construction of Well No.4, a raw water main connection to WTP 1 and water main extension from WTP 1 to Tuscawilla Road. SECTION 2 BASIC SERVICES OF THE ENGINEER 2.1 GENERAL 2.1.1 The ENGINEER agrees to perform professional services in connection with the project as hereinafter stated. 2.1.2 The ENGINEER will serve as the OWNER'S professional engineering representative in those phases of the project to which this Amendment applies, and will give consultation and advice to the OWNER during the performance of his services. The ENGINEER will perform t~e services for the City Commission under the general supervision of the City Manager and Utilities Director and will submit interim plans to them for their review, input, decision, etc. as appropriate. SECTION 3 SCOPE OF SERVICES 3.1 GENERAL The OWNER hereby authorizes the ENGINEER to proceed with the preparation of plans and specifications for Well NO.4 and the water main extension as listed below. No wetlands or environmental services are anticipated for this project. No survey will be obtained and no soils work will be provided. The plans will be based on available CAD map data. 3.1.1 Location Well No.4 will be placed at the northeast quadfant of Tuscawilla Road and the Power Easement. 3.2 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 3.2.7 3.2.8 3.3 3.3.1 3.3,2 3.3.3 WELL NO.4 and RAW WATER LINE DESIGN Review data obtained from the test well. Discuss with SJRWMD the potential well capacity and possible limitations on withdrawal for this new well. We understand that Winter Springs is an area of concern for well locations and saltwater upconing. We recommend a minimum 12-inch diameter well for Well No.4, which will allow the City more options'if the well performs better than expected, Discuss project with SJRWMD and determine current requirements for the design as well as the testing required to place the well into service. Include these items into the Contract Documents. Provide documents to SJRWMD for review. Review current FDEP Regulations and discuss project with FDEP and determine current design and testing requirements for wells and incorporate these items into the Contract Documents. Prepare drawings and specifications for the well construction based on current regulations and connection to the existing WTP1 via a 12-inch raw water line. Retain the services of an electrical subconsultant to review the existing MCC, the existing controls, the slot available for the starter for Well No, 4, the wiring to Well No.4, and to design the electrical items required at the well head. We recommend that the line be a minimum 12-inch diameter. It shall be C- 900 because it is in a power easement that can be traveled by heavy service trucks. The line needs to be non-conductive and, therefore, PVC, The line shall be marked "Raw Water". The route is approximately 200.0 lineal feet. Since there are no storm facilities or other utilities in the power easement (forcemain excepted), the drawings will not include a profile view. DESIGN WATER MAIN EXTENSION Provide a 16-inch PVC water main design from the downstream side of the plant meter to Tuscawilla Road following the power easement alignment, approximately 2200 lineal feet. Utilize existing city map for this design. No survey will be acquired. Design connections at both locations. The raw water line and the potable lines shall have ten feet of horizontal separation in accordance with FDEP regulations. 3.3.4 Since there are no storm facilities or other utilities in the power easement (forcemain excepted), the drawings will not include a profile view. 3.4 BIDDING SERVICES FOR WELL CONSTRUCTION AND WATER MAIN EXTENSION The ENGINEER will provide these services after separate authorization and Notice to Proceed from the OWNER. We envision two bids; one for the well and the othe~ for the raw and distribution system improvements. 3.4.1 Prepare advertisement for bid for placement in appropriate publications by the OWNER. 3.4.2 Distribute and keep records of the distribution of documents to bidders and supplie.rs. 3.4.3 Issue addenda to the documents as required. 3.4.4 Answer questions of bidders and suppliers. No interpretations of the documents shall be made other than through issuance of addenda to the documents. 3.4.5 Attend the bid opening and OWNER'S meetings at which time bids are to be opened and contracts awarded. 3.4.6 Evaluate the bids and assist the OWNER in the selection of the construction contractor. 3.4.7 Consult with the OWNER and participate in all decisions as to ?cceptability of subcontractors, other persons, and organizations proposed by the general contractor for these portions of the work for which subcontractor approval is required by the documents. 3.4.8 Prepare and review contracts, bonds, insurance certificates, construction schedules and other portions of the Contracts in order to assist the OWNER in his determination as to whether to issue a Notice to Proceed to the Contractor. 3.5 FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION PERMIT - WELL NO.4 AND RAW WATER LINE To connect the well to WTP1, a construction permit application will be required. This application is made after the well has been constructed and tested (water quality and disinfection testing). This can be considered as Part Two of the project. However, the documents will be prepared during well design and construction and be ready for submittal upon completion of the well. 3.5.1 Prepare a preliminary engineering report that identifies the capacity of each plant component for submittal to FDEP. Also include well data on the new Well No.4, such as water quality, disinfection, and capacity for their review. Sampling will be provided by the well contractor. 3.5.2 Prepare a construction permit application for execution and submittal by the City. . . 3.5.3 Submit plans and specifications for connection to the existing 12-inch raw water line with the permit application for review and approval. 3.5.4 Respond to FDEP comments. 3.6 FDEP PERMIT - DISTRIBUTION LINE 3.6.1 Prepare a construction permit application for the 16-inch water line connecting to WTP1 to the water main on Tuscawilla Road for execution and submittal by the City. 3.6.2 Submit plans and specifications. 3.6.3 Respond to FDEP comments. 3.7 POWER EASEMENT- ROW UTILIZATION PERMIT 3.7.1 Prepare the paperwork necessary to obtain a ROW utilization permit from the power company. 3.7.2 Identify the location of poles and their 10 #. SECTION 4 SUPPLEMENTARY SERVICES OF THE ENGINEER 4.1 If authorized in writing by the OWNER prior to the rendering of such services, the ENGINEER will furnish or obtain under subcontracts, supplementary services of the following types which will be paid for by the OWNER as described in SECTION 6, Paragraph 6.1.2, 4.2.1 Additional services due to significant changes in the scope of the project or its design including, but not limited to, changes in size, complexity, character of construction or due to time delays in initiating or completion of the work as described herein. 4.2.2 Additional services in connection with the project including services normally furnished by the OWNER as described in Section 5 herein and services not otherwise provided for in this Amendment. 4.2.3 Preparing to serve and serving as an expert witness for the OWNER in any protest, litigation, or other proceeding involving the project. 4.2.4 Additional engineering services required by revisions to regulations (after the date of this Amendment) as applicable to the Florida Department of Environmental Protection, the St. Johns RiverWater Management District, or other regulatory agency requirements. 4.2.5 Provide, through a subconsultant, additional surveying services if required or requested by the OWNER. 4.2.6 Provide, through a subconsultant, soils investigation and geohydrological services if required or requested by the OWNER, or if required by SJRWMD or FDEP, recommended by the ENGINEER and authorized by the OWNER. SECTION 5 THE OWNER'S RESPONSIBILITIES 5.1 The OWNER will: 5.1.1 Advise the ENGINEER of his requirements for the project and designate a person to act as the OWNER'S representative with respect to the work to be performed under this Amendment, and such person shall have complete authority to transmit instructions, receive information, interpret and define the OWNER'S policies and decisions pertinent to the work covered by this Amendment. 5.1.2 Guarantee access to and make all provision for the ENGINEER to enter upon public and private lands as required for the ENGINEER to perform his work under this Amendment. 5.1.3 Provide data requested that is reasonably available on the existing utility systems, population and projections, land use and planning information. 5.1.4 5.1.5 5.1.6 5.1.7 5.1.8 5.1.9 5.1.10 6.1 Provide personnel to locate facilities and mow, trim, or otherwise make them accessible for inspection. Examine all studies, reports, sketches, and other documents presented by the ENGINEER and render decisions pertaining thereto within a reasonable time so as not to delay the work of the ENGINEER. Obtain approval of all governmental authorities having jurisdiction over the project, and such approvals and consents from such other individuals or bodies as may be necessary for completion of the Project. Furnish, or direct the ENGINEER in writing to provide at the OWNER'S expense, soils investigations if advised in writing by the ENGI~EER that they are necessary or advisable. Furnish, or direct the ENGINEER in writing to provide at the OWNER'S expense, necessary additional services as stipulated' in Section 4 of this Amendment, or other services as required. Provide such legal, accounting, and insurance counseling services as may be required for the project, and such auditing services as the OWNER may require. Give prompt written notice to the ENGINEER whenever the OWNER observes or otherwise becomes aware of any defect in the Project. SECTION 6 PAYMENT PAYMENT Payments for services and expenses of the ENGINEER to be as, set forth below: 6.1.1 Principals and Employees of the ENGINEER. 6.1.2 The fee for the scope of services described herein will be provided for a lump sum fee of $22",760, including bidding services. No inspection or construction administration services are included in this fee. A breakdown is included in Attachment A. 6.2 REIMBURSED EXPENSES 6.2,1 The OWNER will make prompt monthly payments in response to ENGINEER'S monthly statements vlithout retention fOf all categories of services rendered under this Amendment and for reimbursable expenses incurred. 6.2.2 Charges for the services rendered by principals and employees as witnesses in any litigation, hearing or proceeding in accordance with Paragraph 4.1.3 will be computed at a rate of $650.00 per day or any portion thereof (but compensation for time spent in preparing to appear in any such litigation, hearing or proceeding will be computed on an hourly rate). 6.2.3 If this Amendment is terminated during prosecution of the services prior to completion of the services of Section 3, payments to be made in accordance with Paragraph 6.1.1 and 6.2.1 on account of that and all prior work under this Amendment shall be due and payable, and shall constitute total payment for services rendered. In addition, upon termination, the ENGINEER shall be paid for any Additional Services authorized and rendered under Section 4. 6.2.4 The ENGINEER shall promptly begin work on the services authorized by this Amendment upon receipt of notice to proceed from the OWNER. SECTION 7 GENERAL CONDITIONS 7.1 Since the ENGINEER has no control over the cost of labor, materials, or equipment, or over any construction contractor's method of determining prices, any opinions of probable construction cost which may be provided in the services of this Amendment are made on the basis of his experience and qualifications and represent his best judgement as a design professional familiar with the construction industry, but the ENGINEER cannot and does not guarantee that bids or the construction cost will not vary from opinions of probable cost prepared by him. 7.2 The OWNER and the ENGINEER each binds himself and his partners, successors, executors, administrators and assigns to the other party of this Amendment and to partners, successors, executors, administrators, and assigns of such other party in respect to all covenants of this Amendment. Nothing herein shall be construed as creating any personal liability on the part of any officer or agency of any public body, which may be a party hereto, . nor shall it be construed as giving any rights or benefits hereunder to anyone other than the OWNER and the ENGINEER. SECTION 8 8.1 The ENGINEER agrees to prosecute the work in a timely manner until the Project is completed. IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment the day and year first above written. OWNER: City of Winter Springs, Florida ATTEST By: Date: ENGINEER: CPH Engineers, Inc. 41 II P: J:\z6582\PROPOSALS\WD\WINTERSPRI NGS\AMEND67. WPD ATTACHMENT A Anticipated Budget Summary Well design . Raw water design Distribution design Electrical design Raw water permit application Distribution permit application Power easement ROW Bidding services-well Bidding services-Dist/Raw Total Budgeted Cost $ 4460 $ 3000 $ 4400 $ 2250 $ 1500 $ 1 500 $ 500 $ 2575 $ 2575 $22,760 AMENDMENT 67 TO AGREEMENT DATED NOVEMBER 27, 1984 FOR WELL 4 DESIGN, RAW WATER MAIN AND WATER DISTRIBUTION EXTENSION WTP 1 TO TUSCAWILLA BETWEEN THE CITY OF WINTER SPRINGS AND CPH ENGINEERS, INC. This Amendment dated November 13 , 2000, by and between the City of Winter Springs (hereinafter called the OWNER) and CPH Engineers, Inc. (hereinafter called the Engineer), is mutually agreed upon and declared an authorized Amendment to an Agreement dated November 27, 1984, between the parties, herein setting forth the scope, terms and conditions of the services herein authorized. The appropriate provisions of the Agreement apply as fully as if repeated herein. a SECTION 1 GENERAL 1.1 The purpose of this Amendment is to provide for Engineering Services, more specifically itemized herein, in the preparation of Plans and Specifications for the construction of Well No. 4, a raw water main connection to WTP 1 and water main extension from WTP 1 to Tuscawilla Road. SECTION 2 BASIC SERVICES OF THE ENGINEER 2.1 GENERAL 2.1.1 The ENGINEER agrees to perform professional services in connection with the project as hereinafter stated. 2.1.2 The ENGINEER will serve as the OWNER'S professional engineering representative in those phases of the project to which this Amendment applies, and will give consultation and advice to the OWNER during the performance of his services. The ENGINEER will perform the services for the City Commission under the general supervision of the City Manager and Utilities Director and will submit interim plans to them for their review, input, decision, etc. as appropriate. SECTION 3 SCOPE OF SERVICES 3.1 GENERAL The OWNER hereby authorizes the ENGINEER to proceed with the preparation of plans and specifications for Well No. 4 and the water main extension as listed below. No wetlands or environmental services are anticipated for this project. No survey will be obtained and no soils work will be provided. The plans will be based on available CAD map data. 3.1.1 Location Well No. 4 will be placed at the northeast quadrant of Tuscawilla Road and the Power Easement. 3.2 WELL NO.4 and RAW WATER LINE DESIGN 3.2.1 Review data obtained from the test well. 3.2.2 Discuss with SJRWMD the potential well capacity and possible limitations on withdrawal for this new well. We understand that Winter Springs is an area of concern for well locations and saltwater upconing. We recommend a minimum 12-inch diameter well for Well No. 4, which will allow the City more options if the well performs better than expected. 3.2.3 Discuss project with SJRWMD and determine current requirements for the design as well as the testing required to place the well into service. Include these items into the Contract Documents. Provide documents to SJRWMD for review. 3.2.4 Review current FDEP Regulations and discuss project with FDEP and determine current design and testing requirements forwells and incorporate these items into the Contract Documents. 3.2.5 Prepare drawings and specifications for the well construction based on current regulations and connection to the existing WTP1 via a 12-inch raw water line. 3.2.6 Retain the services of an electrical subconsultant to review the existing MCC, the existing controls, the slot available for the starter for Well No. 4, the wiring to Well No. 4, and to design the electrical items required at the well head. 3.2.7 We recommend that the line be a minimum 12-inch diameter. It shall be C- 900 because it is in a power easement that can be traveled by heavy service trucks. The line needs to be non-conductive and, therefore, PVC. The line shall be marked "Raw Water". The route is approximately 2000 lineal feet. 3.2.8 Since there are no storm facilities or other utilities in the power easement (forcemain excepted), the drawings will not include a profile view. 3.3 DESIGN WATER MAIN EXTENSION 3.3.1 Provide a 16-inch PVC water main design from the downstream side of the plant meter to Tuscawilla Road following the power easement alignment, approximately 2200 lineal feet. Utilize existing city map for this design. No survey will be acquired. 3.3.2 Design connections at both locations. 3.3.3 The raw water line and the potable lines shall have ten feet of horizontal separation in accordance with FDEP regulations. 3.3.4 Since there are no storm facilities or other utilities in the power easement (forcemain excepted), the drawings will not include a profile view. 3.4 BIDDING SERVICES FOR WELL CONSTRUCTION AND WATER MAIN EXTENSION The ENGINEER will provide these services after separate authorization and Notice to Proceed from the OWNER. We envision two bids; one for the well and the other for the raw and distribution system improvements. 3.4.1 Prepare advertisement for bid for placement in appropriate publications by the OWNER. 3.4.2 Distribute and keep records of the distribution of documents to bidders and suppliers. 3.4.3 Issue addenda to the documents as required. 3.4.4 Answer questions of bidders and suppliers. No interpretations of the documents shall be made other than through issuance of addenda to the documents. 3.4.5 Attend the bid opening and OWNER'S meetings at which time bids are to be opened and contracts awarded. 3.4.6 Evaluate the bids and assist the OWNER in the selection of the construction contractor. 3.4.7 Consult with the OWNER and participate in all decisions as to acceptability of subcontractors, other persons, and organizations proposed by the general contractor for these portions of the work for which subcontractor approval is required by the documents. 3.4.8 Prepare and review contracts, bonds, insurance certificates, construction schedules and other portions of the Contracts in order to assist the OWNER in his determination as to whether to issue a Notice to Proceed to the Contractor. 3.5 FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION PERMIT- WELL NO. 4 AND RAW WATER LINE To connect the well to WTP1, a construction permit application will be required. This application is made after the well has been constructed and tested (water quality and disinfection testing). This can be considered as Part Two of the project. However, the documents will be prepared during well design and construction and be ready for submittal upon completion of the well. 3.5.1 Prepare a preliminary engineering report that identifies the capacity of each plant component for submittal to FDEP. Also include well data on the new Well No. 4, such as water quality, disinfection, and capacity for their review. Sampling will be provided by the well contractor. 3.5.2 Prepare a construction permit application for execution and submittal by the City. 3.5.3 Submit plans and specifications for connection to the existing 12-inch raw water line with the permit application for review and approval. 3.5.4 Respond to FDEP comments. 3.6 FDEP PERMIT -DISTRIBUTION LINE 3.6.1 Prepare a construction permit application for the 16-inch water line connecting to WTP1 to the water main on Tuscawilla Road for execution and submittal by the City. 3.6.2 Submit plans and specifications. 3.6.3 Respond to FDEP comments. 3.7 POWER EASEMENT- ROW UTILIZATION PERMIT 3.7.1 Prepare the paperwork necessary to obtain a ROW utilization permit from the power company. 3.7.2 Identify the location of poles and their ID #. SECTION 4 SUPPLEMENTARY SERVICES OF THE ENGINEER 4.1 If authorized in writing by the OWNER prior to the rendering of such services, the ENGINEER will furnish or obtain under subcontracts, supplementary services of the following types which will be paid for by the OWNER as described in SECTION 6, Paragraph 6.1.2. 4.2.1 Additional services due to significant changes in the scope of the projector its design including, but not limited to, changes in size, complexity, character of construction or due to time delays in initiating or completion of the work as described herein. 4.2.2 Additional services in connection with the project including services normally furnished by the OWNER as described in Section 5 herein and services not otherwise provided for in this Amendment. 4.2.3 Preparing to serve and serving as an expert witness for the OWNER in any protest, litigation, or other proceeding involving the project. 4.2.4 Additional engineering services required by revisions to regulations (afterthe date of this Amendment) as applicable to the Florida Department of Environmental Protection, the St. Johns River Water Management District, or other regulatory agency requirements. 4.2.5 Provide, through a subconsultant, additional surveying services if required or requested by the OWNER. 4.2.6 Provide, through a subconsultant, soils investigation and geohydrological services if required or requested by the OWNER, or if required by SJRWMD or FDEP, recommended by the ENGINEER and authorized by the OWNER. SECTION 5 THE OWNER'S RESPONSIBILITIES 5.1 The OWNER will: 5.1.1 Advise the ENGINEER of his requirements for the project and designate a person to act as the OWNER'S representative with respect to the work to be performed under this Amendment, and such person shall have complete authority to transmit instructions, receive information, interpret and define the OWNER'S policies and decisions pertinent to the work covered by this Amendment. 5.1.2 Guarantee access to and make all provision for the ENGINEER to enter upon public and private lands as required for the ENGINEER to perform his work under this Amendment. 5.1.3 Provide data requested that is reasonably available on the existing utility systems, population and projections, land use and planning information. 5.1.4 Provide personnel to locate facilities and mow, trim, or otherwise make them accessible for inspection. 5.1.5 Examine all studies, reports, sketches, and other documents presented by the ENGINEER and render decisions pertaining thereto within a reasonable time so as not to delay the work of the ENGINEER. 5.1.6 Obtain approval of all governmental authorities having jurisdiction over the project, and such approvals and consents from such other individuals or bodies as may be necessary for completion of the Project. 5.1.7 Furnish, or direct the ENGINEER in writing to provide at the OWNER'S expense, soils investigations if advised in writing by the ENGINEER thatthey are necessary or advisable. 5.1.8 Furnish, or direct the ENGINEER in writing to provide at the OWNER'S expense, necessary additional services as stipulated in Section 4 of this Amendment, or other services as required. 5.1.9 Provide such legal, accounting, and insurance counseling services as may be required for the project, and such auditing services as the OWNER may require. 5.1.10 Give prompt written notice to the ENGINEER whenever the OWNER observes or otherwise becomes aware of any defect in the Project. SECTION 6 PAYMENT 6.1 PAYMENT Payments for services and expenses of the ENGINEER to be as set forth below: 6.1.1 Principals and Employees of the ENGINEER. 6.1.2 The fee for the scope of services described herein will be provided for a lump sum fee of $22,760, including bidding services. No inspection or construction administration services are included in this fee. A breakdown is included in Attachment A. .. 6.2 REIMBURSED EXPENSES 6.2.1 The OWNER will make prompt monthly payments in response to ENGINEER'S monthly statements without retention for all categories of services rendered under this Amendment and for reimbursable expenses incurred. 6.2.2 Charges for the services rendered by principals and employees as witnesses in any litigation, hearing or proceeding in accordance with Paragraph 4.1.3 will be computed at a rate of $650.00 per day or any portion thereof (but compensation for time spent in preparing to appear in any such litigation, hearing or proceeding will be computed on an hourly rate). 6.2.3 If this Amendment is terminated during prosecution of the services prior to completion of the services of Section 3, payments to be made in accordance with Paragraph 6.1.1 and 6.2.1 on account of that and all prior work under this Amendment shall be due and payable, and shall constitute total payment for services rendered. In addition, upon termination, the ENGINEER shall be paid for any Additional Services authorized and rendered under Section 4. 6.2.4 The ENGINEER shall promptly begin work on the services authorized by this Amendment upon receipt of notice to proceed from the OWNER. SECTION 7 GENERAL CONDITIONS 7.1 Since the ENGINEER has no control over the cost of labor, materials, or equipment, or over any construction contractor's method of determining prices, any opinions of probable construction cost which may be provided in the services of this Amendment are made on the basis of his experience and qualifications and represent his best judgement as a design professional familiar with the construction industry, but the ENGINEER cannot and does not guarantee that bids or the construction cost will not vary from opinions of probable cost prepared by him. 7.2 The OWNER and the ENGINEER each binds himself and his partners, successors, executors, administrators and assigns to the other party of this Amendment and to partners, successors, executors, administrators, and assigns of such other party in respect to all covenants of this Amendment. Nothing herein shall be construed as creating any personal liability on the part of any officer or agency of any public body, which may be a party hereto, nor shall it be construed as giving any rights or benefits hereunder to anyone other than the OWNER and the ENGINEER. . •• SECTION 8 The ENGINEER agrees to prosecute the work in a timely manner until the Project is completed. 8.1 IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment the day and year first above written. OWNER: City of Winter Springs, Florida ATTEST Date: ~~_/ _7-{~C~ ENGINEER: CPH Engineers, Inc. Ui~"' By: ~~isy~ ~ Date: `/~~l J:\Z6582\PROPOSALS\WD\WI NTERSPRINGS\AMEND67.WPD ATTACH1111ENT A ,... . Anticipated Budget Summary Well design $ 4460 Raw water design $ 3000 Distribution design $ 4400 Electrical design $ 2250 Raw water permit application $ 1500 Distribution permit application $ 1500 Power easement ROW $ 500 Bidding services-well $ 2575 Bidding services-Dist/Raw 2575 Total Budgeted Cost $22,760