Loading...
HomeMy WebLinkAbout2003 05 12 Consent D CPH Engineering for Construction Administration Services for Town Center Streetscape COMMISSION AGENDA ITEM D CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR May 12, 2003 Meeting MGR 0EPT /~ I Authorization REQUEST: Public Works Department Requesting Authorization to Execute Supplement 1 to Amendment 72 with CPH Engineers for Construction Administration of the Town Center Streetscape Project. PURPOSE: The purppse of this Board item is to request authorization to Execute Supplement 1 to Amendment 72 - Construction Administration Services for Town Center Streetscape with CPR Engineers, Inc. at a cost of $26,775.00. CONSIDERA TIONS: This supplement is needed to provide construction administration services for the Town Center streetscape construction project. The project includes sidewalks, landscaping, irrigation, and fountains and pavers at Market square and Magnolia Park. The scope and complexity of this project coupled with current vacancies and reductions in City technical staff necessitates the use of a consultant to provide adequate project oversight. The scope of work includes preconstruction coordination, daily inspections, shop drawing approval, change order preparation, regulatory certifications and construction administration. The general contractor is Gel/General Constructors, Inc of Altamonte Springs with a contract value of$781,795.37 and construction contract period of240 days. This represents approximately 3.5% of the overall project cost which is well below industry standards. May 12, 2003 Consent Agenda Item D Page 2 FUNDING: The funding source for this project expenditure of $26,775 is the 2002-2012 One-Cent Sales Tax Renewal from Seminole County. The funds for this project will be expended over the next 240 days. RECOMMENDA TION: It is recommended that authorization be given to execute Supplement 1 to Amendment 72 - Construction Administration Services for the Town Center Streetscape Project with Conklin, Porter & Holmes Engineers, Inc. at a cost of $26,775.00 payable from the One-Cent Sales Tax Renewal Funds from Seminole County. IMPLEMENTATION SCHEDULE: The scope of services will be completed within 240 days of approval. ATTACHMENTS: 1. Supplement 1 to Amendment 72 COMMISSION ACTION: SUPPLEMENT 1 to AMENDMENT 72 ADDITIONAL DESIGN SERVICES FOR WINTER SPRINGS STREETSCAPES BETWEEN THE CITY OF WINTER SPRINGS AND CPH ENGINEERS, INC. This Amend'ment dated fItr',/ ~ ,2003, by and between the City of Winter Springs (hereinafter called the 0 ER) and CPH Engineers, Inc. (hereinafter called the Engineer), is mutually agreed upon and declared an authorized Supplement to Amendment 72, between the parties, herein setting forth the scope, t~rms and conditions of the services herein authorized. The appropriate provisions of the Agreement apply as fully as if repeated herein. WHEREAS, the OWNER and the ENGINEER have previously entered into an Agreement for the ENGINEER'S professional services for Design SerVices (Amendment 72); and WHEREAS, Amendment 72 has been approved, authorized by the Commission, and signed by the OWNER; and WHEREAS, additional services are required for construction administration services along Hickory and along Tuskawilla; and WHEREAS, the OWNER and the ENGINEER now wish to modify and add specific items to Amendment 72; NOW THEREFORE, in consideration of the mutual promises and covenants contained herein and given one to the other the sufficiency of which is hereby acknowledged, the parties agree as follows: I. SCOPE OF WORK The scope of work shall be for construction administration services for the Winter Springs Streetscapes. II. FEE The fee and detailed plan of study is attached hereto and incorporated herein, by reference, as Exhibit 1. III. ENTIRE AGREEMENT This Supplement No. 1 to Amendment 72 supersedes all previous authorizations, agreements, or representations, either verbal or written, heretofore in effect between the OWNER and the ENGINEER that may have concerned the matters covered herein, except that this Supplement shall in no way supersede or amend Amendment 72 or other authorizations except as specifically provided herein. No additions, alterations, or variations to the terms of this Supplement shall be valid, nor can the provisions of this Supplement be waived by either party, unless such additions, alterations, or waivers are expressly set forth .in writing in a document of import equal to Amendment 72 or the Supplement and duly executed. IV. TIME OF COMPLETION This Supplement will be completed within the construction schedule timeframes. IN WITNESS WHEREOF, the parties hereto have made and executed this Supplement No.1 to Amendment 72 the day and year first above written. ATTEST: ell ATTEST: '-- ~u ~~~ OWNER: ~,., CITY OF WINTER SPRINGS . . ~~~~ 5-" ~c, " 0 ~ Date ENGINEER: CPH ENGINEERS, INC. t.j /zz!tJ 3 Date EXHIBIT I DETAILED PLAN OF STUDY Time in Manhours Item of Work PM LA D S EXP A. ADMINISTRATION OF CONSTRUCTION Months 1 and 2 . Processing of pay requests, shop drawings etc. 16 16 2 $50 Field Inspection and Monthly meetings and reports 64 12 4 $150 Months 3-8 Processing of pay requests, shop drawings, etc. 30 18 6 $50 Field Inspection and Monthly meetings and reports 100 16 12 $225 TOTAL MANHOURS 210 62 0 24 Estimated cost $19,950 $5,270 $0 $1,080 $475 TOTAL ESTIMATED COST $26,775 Field Inspection and Monthly meetings for Months 1 anQ 2 are based on 8 hours per week. Field Inspection and Monthly meetings for Months 3 thru 8 are based on 4 hours per week. Processing of pay request and shop drawings . are based on 4 hours per week for months 1 and 2 and 2 hours per week for months 3 thru 8. Mileage for inspections is based on 2 trips per week for months 1 and 2 and 1 trip per week for months 3 thru 8. (25 miles per trip at 36.5 cents per mile) SUPPLEMENT 1 to AMENDMENT 72 ADDITIONAL DESIGN SERVICES FOR WINTER SPRINGS STREETSCAPES BETWEEN THE CITY OF WINTER SPRINGS AND CPH ENGINEERS, INC. This Amendment dated #lr("/ 2., 2- ,2003, by and between the City of Winter Springs (hereinafter called the OW ER) and CPH Engineers. Inc. (hereinafter called the Engineer), IS mutually agreed upon and declared an authorized Supplement to Amendment 72. between the parties. herein setting forth the scope. terms and conditions of the services herein authorized. The appropriate provisions of the Agreement apply as fully as if repeated herein. WHEREAS, the OWNER and the ENGINEER have previously entered into an Agreement for the ENGINEER'S professional services for Design SerVices (Amendment 72); and WHEREAS, Amendment 72 has been approved, authorized by the Commission, and signed by the OWNER; and WHEREAS, additional services are required for construction administration services along Hickory and along Tuskawilla; and WHEREAS, the OWNER and the ENGINEER now wish to modify and add specific items to Amendment 72; NOW THEREFORE, in consideration of the mutual promises and covenants contained herein and given one to the other the sufficiency of which is hereby acknowledged, the parties agree as follows: I. SCOPE OF WORK The scope of work shall be for construction administration services for the Winter Springs Streetscapes. II. FEE The fee and detailed plan of study is attached hereto and incorporated herein, by reference, as Exhibit 1. III. ENTIRE AGREEMENT This Supplement No. 1 to Amendment 72 supersedes all previous authorizations, agreements, or representations, either verbal or written, heretofore in effect between the OWNER and the ENGINEER that may have concerned the matters covered herein, except that this Supplement shall in no way supersede or amend Amendment 72 or other authorizations except as specifically provided herein. No additions, alterations, or variations to the terms of this Supplement shall be valid, nor can the provisions of this Supplement be waived by either party, unless such additions, alterations, or waivers are expressly set forth in writing in a document of import equal to Amendment 72 or the Supplement and duly executed. IV. TIME OF COMPLETION This Supplement will be completed within the construction schedule timeframes. IN WITNESS WHEREOF, the parties hereto have made and executed this Supplement NO.1 to Amendment 72 the day and year first above written. ArrEST: OWNER: CITY OF WINTER SPRINGS t.w-v!~~r-= J'-- l" - 0 ~ Date ENGINEER: ATTEST: CPH ENGINEERS, INC. ...... udtke, P.E., DEE erating Officer c:; / zz/o 3 Date EXHIBIT I DETAILED PLAN OF STUDY Time in Manhours Item of Work PM LA D S EXP A. ADMINISTRATION OF CONSTRUCTION Months 1 and 2 Processing of pay requests, shop drawings etc. 16 16 2 $50 Field Inspection and Monthly meetings and reports 64 12 4 $150 Months 3-8 Processing of pay requests, shop drawings, etc. 30 18 6 $50 Field Inspection and Monthly meetings and reports 100 16 12 $225 TOTAL MANHOURS 210 62 0 24 Estimated cost $19,950 $5,270 $0 $1,080 $475 TOTAL ESTIMATED COST $26,775 Field Inspection and Monthly meetings for Months 1 and 2 are based on 8 hours per week. Field Inspection and Monthly meetings for Months 3 thru 8 are based on 4 hours per week. Processing of pay request and shop drawings are based on 4 hours per week for months 1 and 2 and 2 hours per week for months 3 thru 8. Mileage for inspections is based on 2 trips per week for months 1 and 2 and 1 trip per week for months 3 thru 8. (25 miles per trip at 36.5 cents per mile)