Loading...
HomeMy WebLinkAbout2005 01 10 Consent Item 205.1 Amendment 78 for Additional Services to Design Magnolia Square COMMISSION AGENDA ITEM 205.1 CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR January 10, 2005 Meeting MGR yV/DEPT /~ . Authorization REQUEST: Public Works Department Requesting the Commission authorize a Supplemental Authorization for Amendment 78 for Additional Services to Design Magnolia Square Phase 2 and Town Center Trail Extension. PURPOSE: The purpose of this Board item is to request authorization of a supplemental authorization in the amount of $4,000.00 to Amendment 78 with CPH Engineers, Inc. for additional design services for Magnolia Square Phase 2 and the Town Center Trail Extension. CONSIDERATIONS: On June 9, 2003 the Commission authorized the execution of Amendment 78 with CPH Engineers, Inc for the design of Magnolia Square Phase 2, City Hall Retention Pond and the secondary trail from Magnolia Square to Central Winds Park at a cost $44,900. The original scope of work includes the landscape and hardscape design of Magnolia Square including the restroom pavilion, landscape and hardscape design around the City Hall retention pond, design and layout of the secondary trail, preparation of all plans and documents necessary for construction, and all permits and management plans needed. A management plan will be required for any improvements on the State lands. The Magnolia Square improvements will require a State permit/easement and County approval. The supplemental authorization IS required due to the numerous design alternatives being considered relative to the Magnolia Park acquisition from Schrimsher Consent Agenda Item 205.1 January 10, 2005 Page 2 and possibly additional area from JDC as well as the incorporation of the Veteran's Memorial as designed by SRI into the trial design. Also included are engineering and permitting services related to closing and moving the western most existing median crossing from its present location further west to where the temporary median crossing used by Publix delivery trucks is located. This will improve traffic movement within the Town Center. FUNDING: The funding source for the original project expenditure of $44,900 is the 1999 Construction Fund. The funding of the additional $4,000.00 will be funded from the 1999 Construction Fund - Town Center Trail and Infrastructure line code - (305- 65000-30045) in the current budget. RECOMMENDATION: It is recommended that authorization be given for approval of the supplemental authorization of $4,000.00 to Amendment 78 with CPH Engineers, Inc from the 1999 Construction Fund - Town Center and Infrastructure line code - (305-65000). IMPLEMENTATION SCHEDULE: The scope of services will be completed within 180 days of approval. CPH will be coordinating with City staff to create conceptual plans for City Commission consideration prior to proceeding to final design. ATTACHMENTS: 1. Supplement 1 to Amendment 78 COMMISSION ACTION SUPPLEMENT 1 to AMENDMENT 78 ADDITIONAL DESIGN SERVICES FOR LANDSCAPE ARCHITECTURAL SERVICES FOR MAGNOLIA SQUARE AND THE WINTER SPRINGS TRAIL EXTENSION BETWEEN THE CITY OF WINTER SPRINGS AND CPH ENGINEERS, INC. This Amendment dated , 2004, by and between the City of Winter Springs (hereinafter called the OWNER) and CPH Engineers, Inc. (hereinafter called the Engineer), is mutually agreed upon and declared an authorized Supplement to Amendment 78, between the parties, herein setting forth the scope, terms and conditions of the services herein authorized. The appropriate provisions of the Agreement apply as fully as if repeated herein. WHEREAS, the OWNER and the ENGINEER have previously entered into an Agreement for the ENGINEER'S professional services for Design Services (Amendment 78); and WHEREAS, Amendment 78 has been approved, authorized by the Commission, and signed by the OWNER; and WHEREAS, additional services are required for completion of final design documents; and WHEREAS, the OWNER and the ENGINEER now wish to modify and add specific items to Amendment 78; NOW THEREFORE, in consideration of the mutual promises and covenants contained herein and given one to the other the sufficiency of which is hereby acknowledged, the parties agree as follows: I. SCOPE OF WORK The scope of work shall be for Final Design Plans for Task 1- Magnolia Square and Final Design Plans for Task 3- Trail Extension. II. FEE The fee for the additional Final Designs shall be as follows: Task 1- Magnolia Square: $2,000.00 Task 3- Trail Extension: $2,000.00 III. ENTIRE AGREEMENT This Supplement No. 1 to Amendment 78 supersedes all previous authorizations, agreements, or representations, either verbal or written, heretofore in effect between the OWNER and the ENGINEER that may have concerned the matters covered herein, except that this Supplement shall in no way supersede or amend Amendment 78 or other authorizations except as specifically provided herein. No additions, alterations, or variations to the terms of this Supplement shall be valid, nor can the provisions of this Supplement be waived by either party, unless such additions, alterations, or waivers are expressly set forth in writing in a document of import equal to Amendment 78 or the Supplement and duly executed. IV. TIME OF COMPLETION This Supplement will be completed within the current Amendment 78 schedule timeframes. IN WITNESS WHEREOF, the parties hereto have made and executed this Supplement NO.1 to Amendment 72 the day and year first above written. ATTEST: OWNER: CITY OF.\NINTERSPRINGS j( tM-4i p, /}l-t) --p ~ 1-- )fJ--OS Date ENGINEER: ATTEST: CPH ENGINEERS, INC. cy)J( ,4 {~Z /2-/U3(OY , / Date