Loading...
HomeMy WebLinkAbout2006 11 13 Consent 401 Orlando Business Telephone System COMMISSION AGENDA ITEM 401 Consent November 13. 2006 Regular Meeting Mgr. / Dept. Authorization REQUEST: Information Services requests authorization for Orlando Business Telephone Systems to proceed with installation of cabling at the new Public Works Facility in the amount of $18,013. PURPOSE: To obtain authorization for Orlando Business Telephone Systems (OBTS) to proceed with cabling installation at the new Public Works Facility in the amount of $18,013. CONSIDERATIONS: Both copper and fiber cabling work is ready to be completed at the new Public Works facility. Quotes were solicited from 3 companies as follows: MGQ & Associates, Inc. $17,734 Altec DataCom $31,800 OBTS $18,013 The City of Winter Springs contracts with Orlando Business Telephone System for the installation, maintenance, and repair of its entire telephone system. Although OBTS's quote is $278.93 higher than the low-bid, for purposes of standardization and continuity, and to avoid finger-pointing, we would like to stay with the same vendor for the installation of this I:\Admin _ Docs\Agenda Items\FY 2007\2006-11 (November)\ll-13- 06_ COMM_ Consent_ 401_ Authorization jor _ OBTS _ to _ Install_ Cabling_New]W ]aci1ity.doc CITY OF WINTER SPRINGS CITY COMMISSION REGULAR MEETING - NOVEMBER 13, 2006 CONSENT AGENDA ITEM "401" PAGE 2 0F 2 cabling. Weare familiar with their work and have been pleased with their service and work product in the past. FUNDING: Already budgeted in 3600-64200 for FY 2007. RECOMMENDATIONS: Recommend Commission authorize OBTS to proceed with cabling installation for new Public Works facility in the amount of$18,013. ATTACHMENTS: OBTS quote (5 pages). COMMISSION ACTION: ORLANDO BUSINESS TELEPHONE SYSTEMS INC. 4558 SOUTH WEST 34TH STREET ORLANDO, FLORIDA 32811 PH #407-996-9000 City of Winter Spring 112 East S.R. 436 Winter Springs, Florida 32708 Attention: David Day RE; Cabling for building # 2, and # 3 Public Works Orlando Business Telephone Systems Inc. would like to submit charges to install cabling in buildings 2 & 3 for the new Public Works Buildings. OBTS will install Category 6 cable, CAT 6 RJ45 jacksfor data, CAT 6 patch panels and RJ11 jacks for voice. All jacks and patch panels will be tested for CAT 6 compliance with test result available upon request. BUILDING # 2 MATERIALS: Category 6, 4 pair cable, R145 jacks and patch panel Category 3 voice jacks Horizontal wire manager Wall swing rack quoted in fiber optic cable quote. Material Cost Labor to install, tenninate and test Total for building # 2 $ 512.06 $ 350.00 $ 862.06 BUILDING # 3 MA TERJALS Category 6, 4 pair cable, RJ45 jacks and patch panel Category 3 voice jacks Horizontal wire manager 19 X 86 X 3-floor rack quoted in fiber optic cable quoted Material Cost Labor to install, terminate and test Total for building # 3 $1,764.54 $1,325.00 $3,089.54 $3,951.60 exempt $3,951.60 Total for buildings # 2 & # 3 Tax Grand total Page 2 ORLANDO BUSINESS TELEPHONE SYSTEMS INC. 4558 SOUTH WEST 34 rn STREET ORLANDO, FLORIDA 32811 If you have any questions please feel free to call me at 407-996-1132. If you would like to proceed with this project please sign below and fax to 407-996-6262. Thank you for the opportunity to quote the City of Winter Springs on another challenging project. Gary Petry City of Winter Springs Project Manager By October 23, 2006 Date ORLANDO BUSINESS TELEPHONE SYSTEMS INC. SOUTH WEST 35TH STREET ORLANDO, FLORIDA 32811 City of Winter Springs 112 East S.R. 43 Winter Springs, Florida 32708 Attention: David Day This Quote is submitted to City of Winter Springs to extend the fiber optic cable into the new facilities for Public Works. Orlando Business Telephone Systems Inc. would like to quote charges to install MM fiber in new buildings 3, 2, I, and temporary trailer. Buildings 2 & 3, will be connected by a 12 strand MM fiber optic and a 6 stand into 1 and trailer. A 12 strand 8M fiber wiU extend the network from the Moss Road and State Road 419 to building # 3 for Public Works. The 12 strand SM will be spliced in to the existing fiber at State Road 419 and Moss Road - which feeds from the Winter Springs Police Department. MATERIALS; To extend fiber cable and connect building #3 to existing network at State Road 419 and Moss Rd. 12 strand SM fiber SM connectors install in ST bulkheads in fiber LlU 3M Fiber lock splice tray, break out kits for loose tube fiber MATERIAL COST LABOR COST TOTAL MATERIALS: BUILDING # 3 19"X 84"X 3" floor rack with shelves 48 port fiber box, rack mount with ST & MM bulks heads MM ST connectors and 8M connectors. MATERIAL COAST LABOR COST TOTAL $1.595.91 $3,775.00 $5,370.91 $ 799.30 $ 875.00 $1,674.30 MA TERlALS: BUILDING # 2 to extend 12 strand MM fiber from building # 3 12 strand MM fiber optic cable. 24 port fiber LIU wall box with MM ST bulks heads ST MM connectors 19 X 21 X 18 inch wall mount swing rack MATERlAL COST LABOR COST TOTAL 2'd 02..992..2~2..0b6:Dl 29299662..0171 $1,455.72 $2,450.00 $3,905.72 PAGE #2 QUOTE FOR CITY OF WINTER SPRINGS PUBLIC WORKS BUILDING. FIBER OPTIC CABLE PLACEMENT. MATERIALS: TEMPORARY TRAILER: 6 strand MM fiber optic cable from building #2. MATERIALS: BUILDING #ITo pull 6 strand fiber optic cable from building #3 to hand hole for future building # 1. MA TERIAL COST: LABOR if pulled at same time as building #2 in interdict TOTAL $ 967.00 $ 350.00 $1,317.00 OBTS would like to recommend installing 11/4 inner duct from hand hole at building #1 to hand hole at building #2 and to hand hole at building #3 and into building #3. This inner duct can be pulled at the same time as the 12-strand 8M fiber to building #3. This will facilitate pulling the 12 and 6 strands for building #2, #1 and temporary trailer. MATERIALS: $ 356.75 LABOR no charge if pulled with 12-strand SM fiber. OBTS will extend 3, 4 inch pipes from fence to existing pull box at edge of road. MATERIALS $ 236.65 LABOR $ 1,200.00 TOTAL $ 1,436.65 TOTAL WITH INTERDUCT . $14,061. GRAND TOTAL ~14,06~ This quote is based on information available from the City of Winter Springs. Any additional materials or labor will be billed at our normal rate. OaTS is not responsible for ground bars in any of the phone rooms or pipes between buildings. All pipes will need to have pull strings prior to start of project. All work is warranted for one year from date oftum over. If you have any questions fell free to call me at 407-996-1132. Up on review of this quote and your acceptance of tile total amount, please sign and fax a copy to 407.996- 6262. PAGE #3 QUOTE FOR CITY OF WINTER SPRINGS PUBLIC WORKS City of Winter Springs Project Manager By Orlando Business Telephone Systems Inc Date October 18, 2006