Loading...
HomeMy WebLinkAboutOrlando Business Telephone Systems, Inc. Public Works Fac. -2006 12 04 .. ,. . /}Jr ORLANDO BUSINESS TELEPHONE SYSTEMS INC. SOUTII WEST 35TH STREET ORLANDO, FLORIDA 32811 City of Winter Springs 112 East S.R. 43 Winter Springs, Florida 32708 Attention: David Day This Quote is submitted to City of Winter Springs to extend the fiber optic cable into the new facilities for Public Works. Orlando Business Telephone Systems Inc. would like to quote charges to install MM fiber in new buildings 3, 2, 1, and temporary trailer. Buildings 2 & 3, will be connected by a 12 strand MM fiber optic and a 6 stand into 1 and trailer. A 12 strand 8M fiber will extend the network from the Moss Road and State Road 419 to building # 3 for Public Works. The 12 strand SM will be spliced in to the existing fiber at State Road 419 and Moss Road - which feeds from the Winter Springs Police Department. MATERIALS; To extend fiber cable and connect building #3 to existing network at State Road 419 and Moss Rd. 12 strand SM fiber 8M connectors install in ST bulkheads in fiber LIU 3M Fiber lock splice tray, break out kits for loose tube fiber MATERIAL COST LABOR COST TOTAL $1.595.91 $3,775.00 $5,370.91 MATERIALS: BUILDING # 3 19"X 84"X 3" floor rack with shelves 48 port fiber box, rack mount with ST & MM bulks heads MM ST connectors and SM connectors. MATERIAL COAST LABOR COST TOTAL $ 799.30 $ 875.00 $1.674.30 MATERIALS: BUILDING # 2 to extend 12 strand MM fiber from building # 3 12 strand MM fiber optic cable. 24 port fiber LIU wall box with MM ST bulks heads ST MM connectors 19 X 21 X 18 inch wall mount swing rack MATERIAL COST LABOR COST TOTAL $1,455.72 $2,450.00 $3,905.72 2"d 0L99L~L0t>6:Dl 2929966l.0t>I l3~ ssns l~O:WO~~ 9~:60 9002-81-~JO ". PAGE #2 QUOTE FOR CITY OF WINTER SPRINGS PUBLIC WORKS BUILDING. FIBER OPTIC CABLE PLACEMENT. MATERIALS: TEMPORARY tRAILER; 6 strand MM fiber optic cable from building #2. MATERIALS: BUILDING #ITo pull 6 strand fiber optic cable from building #3 to hand hole for future building # 1. MATERIAL COST: LABOR if pulled at same time as building #2 in interdict TOTAL $ 967.00 $ 350.00 $1,317.00 oaTS would like to reconunend installing 11/4 inner duct from hand hole at building #1 to hand hole at building #2 and to band hole at building #3 and into building #3. This inner duct can be pulled at the same time as the 12-strand 8M fiber to building #3. This will facilitate pulling the 12 and 6 strands for building #2, #1 and temporary trailer. MATERIALS: $ 356.75 LABOR no charge if pulled with 12-strand SM fiber. OBTS will extend 3, 4 inch pipes from fence to existing pull box at edge of road. MA TERlALS $ 236.65 LABOR $ 1,200.00 TOTAL $ 1,436.65 TOTAL WITH INTERDUCT . $14,061.33 ~ ~~~~ GRAND TOTAL ~14,06l~ This quote is based on information available from the City of Winter Springs. Any additional materials or labor will be billed at our normal rate. OaTS is not responsible for ground bars in any of the phone rooms or pipes between buildings. All pipes will need to have pull strings prior to start of project All work is warranted for one year from date of turn over. If you have any questions fell free to call me at 407-996-1132. Up on review of this quote and your acceptance of the total amount, please sign and fax a copy to 407.996- 6262. nlnnl..,,.....lnLi:'.nl :JO:JaacCIGll-.T ,~I c::c::nQ ,).In: 1.1n).l..j ) (' : I=.Cl qV!(;l;J-,:::n - I,n ,1 PAGE #3 QUOTE FOR CITY OF WINTER SPRINGS PUBLIC WORKS Project Manager City of Winter SprinBi: . By~"ll:"-'; 1-t/ ~ Date /J . "'I. '- ii i Orlando Business Telephone Systems Inc October 18, 2006 b'd 132..992..2[2..13176:01 29299662..13b1 l31 ssns l~O:WO~~ 2..[:613 91302-81-1JO