Loading...
HomeMy WebLinkAbout2007 01 08 Regular 305 Award Contract To Southeast Enviroscape, Inc. COMMISSION AGENDA ITEM 305 REGULAR January 8,2007 Meeting MGR /DEPT Authorization REQUEST: Utility/Public Works Department - Capital Projects Division requesting authorization to award the contract for the Blumberg Boulevard Median and Trail Improvement Project to Southeast Enviroscape, Inc. PURPOSE: This agenda item is needed to acquire Commission authority to award the contract for the construction of Blumberg Boulevard Median and Trail Improvement Project to the lowest bidder, Southeast Enviroscape, Inc. for $1,400,928.45. CONSIDERATIONS: In the Town Center Master Plan, Blumberg Boulevard was envisioned and designed to be one of the most beautiful links of public streets anywhere in Florida. This focal point in the Town Center serves three purposes; 1) to be one of the most important people places and points of interest in the Town Center, 2) to provides a secondary trail link between the Cross Seminole Trail-Trailhead located at Magnolia Park and Central Winds Park, and 3) to serve as linear park linking Central Winds Park with Magnolia Park and Wetland Park, thus creating Winter Springs version of New York's Central Park. The concept plans were approved in approximately 2000 by the State Office of Greenways and Trails leading to the State's acquisition of the trail right of way in the median of Blumberg Boulevard in April 2001. The Town Center Trail was advertised for bid on November 5,2006 with the bid opening on December 6, 2006. Four bids for the project were received. . Southeast Enviroscape, Inc . Gomez Construction, Co. . Gibbs & Register, Inc . APEC, Inc $1,400,928.45 $1,763,547.32 $1,944,450.00 $2,227,016.25 010807_ COMM_Regular_305 _ ToWD_ Center_Trail Regular Agenda Item 305 January 8, 2007 Page 2 of 4 Each bid has been carefully reviewed by staff and the Architect, SRI, Inc and Landscape Architect, CPR Engineers, Inc, for completeness and accuracy. Previous or current work has been reviewed and found to be acceptable. The scope of this project is to install the concrete pavers already purchased by the City, construction of two lighted pavilions and four lighted arboretums with bollard lighting along the pathway, and extensive landscaping with irrigation. The construction of a fountain at the intersection of Blumberg Boulevard and Doran Drive is also a part ofthe work. This project will tie into the Veterans Memorial to be constructed on the eastern end of Blumberg Boulevard. The overall projected construction budget required is estimated to be $1,523,554.87 with a 5% contingency included. This includes the cost of the concrete pavers previously purchased by the City, design cost and the cost of select Sylvester Palms that the City will purchase and provide. This does not include the cost for the electrical infrastructure to be installed by Progress Energy. This estimate has not yet been provided by Progress Energy but is estimated at $25,000. The cost for this project exceeds the amount of $800,000 available in the current fiscal year allocation for this project. The remaining funds needed are recommended to be reallocated by transferring funds as detailed below. Although the costs have escalated over the original estimates, the importance of this focal point in the Town Center necessitates preservation of the original design quality and character. The budgetary figure was estimated several years ago and the increased bid costs are typical of what has been seen in the construction industry the last several years for specialty nature projects such as this. Copies of the bid plans will be provided to the Commission. FUNDING: Town Center Trail & Infrastructure Transfer from Town Center Improvements Transfer from Doran Phase IIA Transfer from Town Center Streetscape 305-65000-30045 305-65000 115-65000-30101 115-65000-30011 TOTAL $800,000 $278,000 $310,000 $140.000 $1,528,000 010807_ COMM_Regular_305 _ToWll_ Center_Trail Regular Agenda Item 305 January 8, 2007 Page 3 of 4 The $278,000 in Town Center Improvements was included in the budget as a contingency item for projects such as this. The Doran IIA and streetscape funds are determined to be available based on the final commitments in the Implementation Agreement with IDC. RECOMMENDATION: Staff recommends approval of the proposed budget transfers and awarding the contract for the construction of the Town Center Trail to Southeast Enviroscape, Inc in the amount of$I,400,928.45 with a 5% contingency. IMPLEMENTA TION SCHEDULE: The Notice of Award will be provided to Southeast Enviroscape within 10 days of approval with the preconstruction meeting scheduled thereafter. Estimated construction time is 180 days from issuance ofthe Notice to Proceed. ATTACHMENTS: 1. Bid Tabulation - Blumberg Boulevard Median and Trail Improvement COMMISSION ACTION: 010807_ COMM _Regular _305 _Town_Center _Trail Regular Agenda Item 305 January 8, 2007 Page 4 of 4 Attachment No.1 CITY OF WINTER SPRINGS, FL 1126 EAST STATE ROAD 434 WINTER SPRINGS, FL 32708 407-327-1800 ITB003/07/GB Town Center Trail Bid was opened by: Nancy Vobornik, Purchasing Coordinator RFP Opened: 3:00 PM RFP Closed 3 :07 PM Date: December 6, 2006 Witness: Greg Bishop, Capital Projects Coordinator Southeast Enviroscope, Inc. 1293 CR 426, Suite 117 Oviedo, FL 32765 Contact: A. Lee Smith 407-366-6681 407 -365-7294 Base Bid: $1,400,928.45 Gomez Construction Co. 750 Jackson Avenue Winter Park, FL 32789 Contact: Orlando Gomez, Jr 407-628-4353 Base Bid: $1,748,268.32 Gibbs & Register, Inc. 232 S. Dillard St. Winter Garden, FL 34787-3592 Contact: Rex D. Huffman 407-654-6133 Base Bid: $1,987,850.00 APEC, Inc. American Persian Engineers & Constructors, Inc. 4436 Old Winter Garden Road Orlando, FL 32811 Contact: Jon Hine 407-522-0530 Base Bid: $ 2,227,016.25 010807 _ COMM _Regular _305_ Town_Center _Trail