HomeMy WebLinkAbout2005 10 10 Consent 209 COMMISSION AGENDA ITEM 209 CONSENT INFORMATIONAL PUBLIC HEARING REGULAR x October 10, 2005 Meeting MGR jV;DEPT Authorization REQUEST: Public Works Department Requesting Approval of Change Order to Increase the Contract Amount for Doran Drive and SR434 Intersection Improvements PURPOSE: The purpose of this Board item is to request approval of Change Order No. 1 for an increase in the contract for Doran Drive and SR 434 for changes related to the traffic signal adjustments for McLeod's Way. CONSIDERATIONS: . This project was initially approved on November 22, 2004, "piggybacking" off Seminole County Contract AlB - 30210/GG for traffic signals with Traffic Control Devices, Inc (TCD) in the amount of$141,865.42 plus 10% contingency. The contract with TCD is for the installation of the traffic signal and associated work only. . This project start date was delayed to allow for the inclusion of changes related to the Jesup Reserve and McLeod's Way to be included in the intersection improvements. These changes consist of additional traffic loops on McLeod's Way and pedestrian crossing signals along with associated traffic signal heads. . Obtaining easements required for placement of the Mast Arms on the south side of SR 434 to ensure the alignment of the proposed McLeod's Way created additional delays. Consent Agenda Item 209 October 10,2005,2002 Page 2 . Since November 2004, Seminole County has made allowances for increases in material cost related to the Contract AIB - 30210/GG. This cost allowance and increase in the scope of work for the changes related to McLeod's Way results in an increase of $29, 620.55 to the contract. The new total for the traffic signal is $171,485.97. This increase exceeds the approval authority for the contract related to change orders. . A second contract with Central Florida Environmental, Corp. (CFE) for the associated road work was approved on February 28, 2005 for $277,672.16, also "piggybacking" off of a Seminole County Contract (C-1222-03/TLR). . Increases in allowances for this contract results in an increase of $22,252.74 bringing the contract total to $299,924.90. . Totals of both contracts increase the project cost from $419,537.58 to $471,410.87. FUNDING: The funding for this project was budgeted in the previous fiscal year (04/05) under the Transportation Impact Fund capital improvements line code 140-65000- 30022. The amount budgeted for this project was $461,492.00. RECOMMENDATION: Staff recommends approval of Change Order No: 1 A TT ACHMENTS: 1. Change Order 1 COMMISSION ACTION: CHANGE ORDER FORM Project Title: SR434 and Doran Drive Signalization Project Change Order No: 1 Agreement Date: February 23, 2005 Contractor: Traffic Control Devices, Inc. This Change Order is necessary to cover changes in the work to be performed under this Agreement. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, and STANDARD SPECIFICATIONS apply to and govern all work under this Change Order. Reason for Change: Update steel and concrete unit prices based on new contract with Seminole County, and the addition of McLeod's Way. THE FOLLOWING CHANGES ARE MADE TO THE CONTRACT DOCUMENTS: Item No. and Description Change in Change in Contract Price Contract Time 1. See Attached Work Sheet $29,620.55 Completion Date of January 31,2006 2. 3. 4. 5. 1. Original Contract Price 2. Current Contract Price (Adjusted By Previous Change Orders) 3. Total Proposed Change in Contract Price 4. New Contract Price (Item 2 plus Item 3) 5. Original Construction Completion Date 6. Original Contract Time 7. Current Contract Time (Adjusted By Previous Change Orders) 8. Total Proposed Change in Contract Time 9. New Contract Time (Item 6 plus Item 7) 10. New Construction Completion Date $141,865.42 $141,865.42 $29,620.55 $171,485.97 N/A N/A N/A N/A N/A January 31, 2006 WAIVER This Change Order constitutes full and mutual accord and satisfaction for the adjustment of the Contract Price and Contract Time as a result of increases or decreases in cost and time of performance caused directly and indirectly from the change. Acceptance of this Waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the Agreement and that CONTRACTOR shall waive all rights to file a Contract Claim or claim of any nature on this Change Order. Execution of this Change Order shall constitute CONTRACTOR's complete acceptance and satisfaction that it is entitled to no more costs or time (direct, indirect, impact, etc.) pursuant to this Change Order. APPROVAL AND CHANGE ORDER AUTHORIZATION ACKNOWLEDGMENTS The aforementioned change, and work affected thereby, is subject to all provIsions of the original Agreement and specifically changed by this Change Order; and it is expressly understood and agreed that the approval of the Change Order shall have no effect on the original Agreement other than matters expressly provided herein. Recommended By: -r: #I~ Engineiyf Director' Ulilf!:tUbliC '1-12..0~ Date rks ~ /) s /05-- Date / ' q ;;~S Dat~ ATTEST: Contractor (Secretary) ~<=}~~ ;r.".,4~,-,.-- 9-'7 -tJS" Date Date (Corporate Seal) ATTEST: Owner By By Ronald W. McLemore, City Manager Date Date SR434 at Doran Drive - Change Order No. 1 Traffic Control Devices, Inc. 25-Aug-GS Deductions Item No. Item Description Quantity Unit Unit Price Total Price 341 648-11-45F Mast Arm Assem. 1 EA $ 7,712.00 $ 7,712.00 343 648-11-50F Mast Arm Assem 2 EA $ 8,171.00 $ 16 342.00 345 648-11-55F Mast Arm Assem 1 EA $ 8,221.00 $ 8,221.00 438 648-990 Deco Base 4 EA $ 1,921.00 $ 7.684.00 447 715-99 Luminaire Acorn 4 EA $ 1,714.00 $ 6.856.00 89 648-1 B 48" Cone. Foundation 64 LF $ 202.16 $12,938.24 237 659-1 08 Steel Pedestal 2 EA $ 480.94 $ 961.88 238 659-109 Concrete Pedestal 1 EA $ 490.23 $ 490.23 653-181 Ped SiQnal LED 2 EA $ 514.71 $ 1,029.42 Total $ 62.234.77 Additions (Updated Prices) Item No. Item Descriotion Quantity Unit Unit Price Total Price 341 648-11-45F Mast Arm Assem. 1 EA $ 7,405.00 $ 7,405.00 343 648-11-50F Mast Arm Assem 2 EA $ 9,090.00 $18,180.00 345 648-11-55F Mast Arm Assem 1 EA $10,685.00 $ 10,685.00 438 648-99D Deco Base 4 EA $ 2,265.50 $ 9,062.00 447 715-99 Luminaire Acorn 4 EA $ 1,714.00 $ 6,856.00 89 648-1 B 48" Cone. Foundation 54 LF $ 555.50 $ 29,997.00 237 659-108 Steel Pedestal 2 EA $ 1,115.00 $ 2,230.00 238 659-109 Concrete Pedestal 1 EA $ 590.00 $ 590.00 Total $ 85,005.00 Additions (Revised Plans) 630-1-12 Conduit Underaround 60 LF $ 5.25 $ 315.00 635-1-11 Pull Box 1 EA $ 276.50 $ 276.50 650-1-111 B LED Red Ball 2 EA $ 65.00 $ 130.00 650-1-111E LED Yellow Ball 2 EA $ 82.25 $ 164.50 650-1-111 H lED Green Ball 2 EA $ 121.00 $ 242.00 650-1-111 N LED Yellow Arra-N 1 EA $ 61.25 $ 61.25 650-1-1110 LED Green Arrow 1 EA $ 91.00 $ 91.00 650-51-311 3-Section Head 1 AS $ 520.00 $ 520.00 650-51-511 5-Sectlon Head 1 AS $ 730.50 $ 730.50 653-182 Ped Signal - 2-Way 2 AS $ 1,029.42 $ 2,058.84 660-1-105 Loop Det 2 EA $ 252.91 $ 505.82 660-1-106 Loop Det 1 EA $ 252.91 $ 252.91 660-2-106 Loop Assembly Type F 2 AS $ 650.00 $ 1,300.00 665-11 Ped Detector 2 EA $ 101.00 $ 202.00 Total $ 6,850.32 I Total Change Order Amount I I $29,620.55 I CHANGE ORDER FORM Project Title: SR434 and Doran Drive Signalization Project Change Order No Agreement Date: February 23, 2005 Contractor: Traffic Control Devices. Inc. This Change Order is necessary to cover changes in the work to be performed under this Agreement. The GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, and STANDARD SPECIFICATIONS appl to and overn all work under this Chan a Order. Reason for Change: Update steel and concrete unit prices based on new contract with Seminole County, and the addition of McLeod's Way. THE FOLLOWING CHANGES ARE MADE TO THE CONTRACT DOCUMENTS: Item No. and Description Change in Contract Price Change in Contract Time 1. See Attached Work Sheet $29,620.55 Completion Date of January 31, 2006 2. 3. 4. 5. 1. Original Contract Price 2. Current Contract Price (Adjusted By Previous Change Orders) 3. Total Proposed Change in Contract Price 4. New Contract Price (Item 2 plus Item 3) 5. Original Construction Completion Date 6. Original Contract Time 7. Current Contract Time (Adjusted By Previous Change Orders) 8. Total Proposed Change in Contract Time 9. New Contract Time (Item 6 plus Item 7) 10. New Construction Completion Date $141,865.42 $141, 865.42 $29,620.55 $171,485.97 N/A N/A N/A N/A N/A January 31, 2006 ~ ~ WAIVER This Change Order constitutes full and mutual accord and satisfaction for the adjustment of the Contract Price and Contract Time as a result of increases or decreases in cost and time of performance caused directly and indirectly from the change. Acceptance of this Waiver constitutes an agreement between OWNER and CONTRACTOR that the Change Order represents an equitable adjustment to the Agreement and that CONTRACTOR shall waive all rights to file a Contract Claim or claim of any nature on this Change Order. Execution of this Change Order shall constitute CONTRACTOR s complete acceptance and satisfaction that it is entitled to no more costs or time (direct, indirect, impact, etc.) pursuant to this Change Order. APPROVAL AND CHANGE ORDER AUTHORIZATION ACKNOWLEDGMENTS The aforementioned change, and work affected thereby, is subject to all provisions of the original Agreement and specifically changed by this Change Order; and it is expressly understood and agreed that the approval of the Change Order shall have no effect on the original Agreement other than matters expressly provided herein. Recommended By: `~~ . Engineer i Directo tilit~~ blic rks "~ Capita~pj'ects Coor~nator 9--/a-os Date ~~~ 3~0 ~~ Date ~ S Dat ATTEST: (Secretary) Date (Corporate Seal) ATTEST: By Contractor / y /acr ,tC,s~v~a.v~ 9- S -os Date Owner By Ronald W. McLemore, City Manager ~a/z/.s~ Date Dafe • i 5R434 at Doran Drive -Change Order No,1 Traffic Control Devices, Inc. 25-Aug-05 Deductions Item No. Item Descri tion Quantit Unit Unit Price Tatal Price 341 648-11-45F Mast Arm Assem. 1 EA $ 7,712.00 $ 7,712.00 343 648-11-50F Mast Arm Assem 2 EA $ 8,171.00 $16342.00 345 648-11-55F Mast Arm Assem 1 EA $ 8,221.00 $ 8,221.00 438 648-99D Deco Base 4 EA $ 1,921.00 $ 7,684.00 447 715-99 Luminaire Acom 4 EA $ 1,714.00 $ 6 856.00 89 648-1 B 48" Conc. Foundation 64 LF $ 202.16 $12,93824 237 659-108 Steel Pedestal 2 EA $ 480.94 $ 961.88 238 659-109 Concrete Pedestal 1 EA $ 490.23 $ 490.23 653-181 Ped Si nal LED 2 EA $ 514,71 $ 1,029.42 Total $ 62 234.77 Addltlons (U dated Prices Item No. Item Descri tion Quanti Unit Unit Price Total Price 341 648-11-45F Mast Arm Assem. 1 EA $ 7,405.00 $ 7,405.00 343 648-11-50F Mast Arm Assem 2 EA $ 9,090.00 $18,180.00 345 648-11-55F Mast Arm Assem 1 EA $10,685.00 $10,685.00 438 648-99D Deco Base 4 EA $ 2,265.50 $ 9,062.00 447 715-99 Luminaire Acom 4 EA $ 1,714.00 $ 6,856.00 89 648-1 B 48" Conc. Foundation 54 LF $ 555.50 $ 29,997.00 237 659-108 Stee! Pedestal 2 EA $ 1,115.00 $ 2,230.00 238 659-109 Concrete Pedestal 1 EA $ 590.00 $ 590.00 Total $ 85,005.00 Addltlons Revised Plans 630-1-12 Conduit Under round 60 LF $ 5.25 $ 315.00 635-1-11 Pull Box 1 EA $ 276.50 $ 276.50 650-1-111 B LED Red Ball 2 EA $ 65.00 $ 130.00 650-1-111 E LED Yellow Ball 2 EA $ 82.25 $ 164.50 650-1-111 H LED Green Ball 2 EA $ 121.00 $ 242.00 650-1-111 N LED Yellow Amow 1 EA $ 61.25 $ 61.25 650-1-111Q LED Green An•ow 1 EA $ 91.00 $ 91.00 650-51-311 3-Section Head 1 AS $ 520.00 $ 520.00 650-51-511 5-Section Head 1 AS $ 730.50 $ 730.50 653-182 Ped Si nal - 2-Wa 2 AS $ 1,029.42 $ 2,058.84 680-1-105 Loo Det 2 EA $ 252.91 $ 505.82 660-1-106 Loo Det 1 EA $ 252.91 $ 252.91 660-2-106 Loo Assembl T e F 2 AS $ 650.00 $ 1,300.00 665-11 Ped Detector 2 EA $ 101.00 $ 202.00 Total $ 13,850.32 Total Chan a Order Amount $ 29,820.55