HomeMy WebLinkAbout1999 07 12 Consent Item C COMMISSION AGENDA ITEM C CONSENT X INFORMATIONAL PUBLIC HEARING REGULAR July 12, 1999 Meeting MGR~EPT /~ Authorization REQUEST: Utility Department Requesting Authorization to enter into a Contractual Agreement for Water Treatment Plant #2 Aerator Replacement PURPOSE: The purpose of this Board item is to request authorization to enter into a contractual agreement with Water Equipment Services, Inc. for the Aerator Replacement at Water Treatment Plant #2 at a cost of $40,000.00 plus a 10% contingency. CONSIDERATIONS: This project is needed to increase the capacity of the raw water aerators on the storage tank at Water Treatment Plant #2 to match the capacities of the water supply wells. Aerators are used to remove sulfur in the form of hydrogen sulfide prior to chlorination and distribution. WTP #2 is located on Sheoah Boulevard next to the Highlands tennis courts. In 1996, a second well was constructed for this facility. The increase in aerator capacity will allow both wells to be used to fill the storage tank at the same time improving the level of service for this facility. Bids for this project were opened on June 16, 1999 under Bid # ITB-011-99-KL. The City Clerks summary is attached. The lowest bid was $38,000 by Crom Corporation. However, they took exception to the insurance indemnification requirements in the specifications making their bid a "conditioned bid" which is unacceptable. The lowest acceptable bid was by Water Equipment Services, Inc. of Sarasota, Florida, with a bid $40,000.00. The project scope of work includes the replacement of the existing aerator with a July 12, 1999 Consent Agenda Item C Page 2 3,800 gpm aerator including a new fiberglass dome and screening. The storage tank will also be painted white with a blue band. The Capital Projects Coordinator recommendation is also attached. FUNDING: The bid cost of $40,000.00 is below the $50,000 budgeted for this project in the Utility Renewal and Replacement Fund capital improvements line code (3610-56340). Funds will be expended within 90 days of issuance of the Notice to Proceed. RECOMMENDATION: It is recommended that authorization be granted to enter into a contractual agreement with Water Equipment Services, Inc. for the Aerator Replacement at Water Treatment Plant #2 at a cost of $40,000.00 plus a 10% contingency payable from the Utility Renewal and Replacement Fund (3610-56340). IMPLEMENTATION SCHEDULE: The scope of work will be completed within 90 days of issuance of the Notice to Proceed. The construction will be occurring during normal working hours. Painting will be done with a roller so no aerosol drift occurs. ATTACHMENTS: 1. City Clerk Summary - Bid #ITB-01l-99-KL 2. Proposal and Agreement 3. Capital Project Coordinator Recommendation COMMISSION ACTION: r' A TT ACHMENT NO. 1 CITY OF WINTER SPRINGS, FLORIDA 1126 EAST STATE ROAD 434 WINTER SPRINGS. FLORIDA 32708-2799 Telephone (407) 327-1800 AERATOR REPLACEMENT WATER TREATMENT PLANT 2 BID NUMBER: ITB-OII-99-KL BID OPENING DATE: June 16, 1999 The Bid Opening Was Called By: Ms. Nancy Vobomik Purchasing Department Bid Opened: Bid Closed: 3:04 p.m. 3:06 p.m. Three (3) Bids Received: 1. THE CROM CORPORATION 250 SW 36TH TERRACE, GAINESVILLE, FLORIDA 32607 TELEPHONE: (352) 372-3436 FACSIMILE: (352) 372-6209 BASE BID: $38,000.00 2. BEACH CONSTRUCTION COMPANY, INC. POST OFFICE BOX 141860, GAINESVILLE, FLORIDA 32614-1860 TELEPHONE: (352) 335-5556 FACSIMILE: (352) 335-5665 BASE BID: $73,400.00 3. WATER EQUIPMENT SERVICES, INC. 6389 TOWER LANE, SARASOTA, FLORIDA 34240 TELEPHONE: (941) 371-7617 FACSIMILE: (941) 378-5218 BASE;?ID: $40,000.00 ( I ~ (^--I~' LL---- ~ndrea Lorenzo-Lua' , nterim City Clerk City of Winter S Copy: Mr. Kipton D. LockcutT, P.E., Director, Public Works/Utility Depa~tment Ms. Nancy Vobornik, Purchasing Department DOC:S/hids/rcsullstryl)g<)<)II)<)-O II,doc A TT ACHMENT NO. 2 SECTION 00500 AGREEMENT THIS AGREEMENT MADE THIS DAY OF , 199_ between the CITY OF WINTER SPRINGS of 1126 East State Road 434, Winter Springs, Florida 32708, Seminole County,State of Florida, herein referred to as OWNER and Water Equipment Services, Inc. of Sarasota, Florida, herein referred to as CONTRACTOR, a person duly licensed as a Contractor in the State of Florida, as follows: 1. DESCRIPTION OF WORK - CONTRACTOR shall perform the work, in accordance with the Contract Documents, of Aerator Replacement at Water Treatment Plant #2. 2. CONTRACT DOCUMENTS - The Contract Documents consist of this Agreement; all Technical, General and Supplementary Conditions and Sections contained in the Project Manual; the Drawings as listed on the Bid Form and Index to Drawings; all Addenda issued prior to and all Change Orders issued after execution of this Agreement. These form the Contract and are incorporated into this Contract by this reference. 3. CONTRACT TIME - The CONTRACTOR shall begin work within 10 calendar days after the issuance of a written Notice to Proceed and shall complete the work within 90 calendar days from the date of the Notice to Proceed. Extensions, if any, are authorized by OWNER, and may only be granted in writing. 4. LIOUIDATED DAMAGES - OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not substantially complete within the time specified in Paragraph 3 above, plus any extensions thereof allowed in accordance with the General Conditions. They also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by OWNER if the Work is not substantially complete on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER $100.00 for each day that expires after the time specified in Paragraph 3 for substantial completion has expired until the work is finally complete and the Substantial Completion Certificate has been issued and that OWNER has paid to CONTRACTOR the consideration of Ten ($10.00) Dollars as consideration for this provision. 5. CONTRACT PRICE, LUMP SUM CONTRACT - The OWNER will pay the CONTRACTOR in current funds for the performance of the work, subject to additions and deductions by Change Order, the Total Contract Price of Forty Thousand and 00/00 Dollars ($ 40,000.00 ). Payments will be made to the CONTRACTOR based on the Lump Sum Bid amount, the Schedule of Values, and subject to completion of the work, in accordance with the Contract Documents. 6. PROGRESS PAYMENTS - OWNER shall make progress payments on account of the contract price to CONTRACTOR, on the basis of application for payments submitted to the City or their authorized representative, by CONTRACTOR as the work progresses, and in accordance with the Contract Documents. Progress payments may be withheld if: (A) Work is found defective and not remedied; (B) Contractor does not make prompt and proper payments to subcontractors; (C) Contractor does not make prompts and proper payments for labor, materials, or equipment furnished him; (D) Another Contractor is damaged by an act for which Contractor is responsible; (E) Claims or liens are filed on the job; or (F) In the opinion of the City of Winter Springs, Contractor's work is not progressing satisfactorily. 7. FINAL PAYMENT - OWNER shall withhold up to 10% ofthe Contract Price throughout the project. The Owner shall release 50%of the amount witheld upon issuance of the Substantial Completion Certificate. The remaining 50% of the amount withheld shall be released with the Final Payment after the issuance of the Final Completion Certificate. OWNER shall make final payment to CONTRACTOR within thirty (30) days after the work is fully and properly completed, if the contract has been fully and timely performed, but subject to the condition that final payment shall not be due until CONTRACTOR has delivered to OWNER a complete release of all liens arising out of the contract, or receipt releases of lien fully covering all labor, materials and equipment for which a lien could be filed, or in the alternative a bond satisfactory to OWNER indemnifying him against such claims. By making payments OWNER does not waive claims including but not limited to those relating to: (A) Faulty work appearing after substantial completion has been granted; (B) Work that does not comply with the Contract Documents; (C) Outstanding claims of liens; or (D) Failure of Contractor to comply with any special guarantees required by the Contract Documents. CONTRACTOR, by accepting final payment, waives all claims except those which he has previously made in writing, and which remain unsettled at the time of acceptance of payment pursuant to this contract. 8. DESIGNATION OF PROJECT DIRECTOR OR ARCHITECT OR ENGINEER: DUTIES AND AUTHORITY - The duties and authority of the City are as follows: a. General Administration of Contract. The primary function of the City is to provide the general administration of the contract. In performance of these duties George F. Edwards, Capital Projects Coordinator, is the City's Project Director during the entire period of construction. The OWNER (City) may change the Project Director during the term of this contract. b. Inspections. Opinions. and Proaress Reports. The OWNER shall be kept familiar with the progress and quality of the work by CONTRACTOR and may make periodic visits to the work site. The OWNER will not be responsible for the means of construction, or for the sequences, methods, and procedures used therein, or for the CONTRACTOR's failure to perform the work in accordance with the Contract Documents. c. Access to Work Site for Inspections. The OWNER shall be given free access to the works site at all times during work preparation and progress. The Project Director is not obligated to make exhaustive or continuous on site inspections to perform his duties of checking and reporting on work progress, and any such inspections shall not waive Owner's claim regarding defective work by Contractor. d. Interpretation of Contract Documents: Decisions on Disputes. The OWNER will be the initial interpreter of the contract document requirements, and make decisions on claims and disputes between Contractor and Owner. e. Reiection and Stoppaae of Work. The OWNER shall have authority to reject work which in its opinion does not conform to the Contract Documents, and in this connection may stop the work or a portion thereof, when necessary. f. Payment Certificates. The OWNER will determine the amounts owing to CONTRACTOR as the work progresses, based on CONTRACTOR's applications and OWNER's inspections and observations, and will issue certificates for progress payments and final payments in accordance with the terms of the Contract Documents. 9. RESPONSIBILITIES OF CONTRACTOR - CONTRACTOR's duties and rights in connection with the project herein are as follows: a. Responsibility for Supervision and Construction. CONTRACTOR shall be solely responsible for all construction under this contract, including the techniques, sequences, procedures and means, for the coordination of all work. CONTRACTOR shall supervise and direct the work, and give it all attention necessary for such proper supervision and direction. b. Discipline and Employment. CONTRACTOR shall maintain at all times strict discipline among his employees, and he agrees not to employ for work on the project any person unfit or without sufficient skill to perform the job for which he was employed. c. Furnishina of Labor. Materials. etc. CONTRACTOR shall provide and pay for all labor, materials and equipment, including tools, construction equipment and machinery, utilities, including water, transportation, and all other facilities and services necessary for the proper completion of work on the project in accordance with the Contract Documents. d. Payment of Taxes: Procurement of Licenses and Permits. CONTRACTOR shall secure all licenses and permits necessary for proper completion of the work, paying the fees therefor. CONTRACTOR warrants that it (and subcontractors or tradesmen, if authorized in the Contract Documents) hold or will secure all trade or professional licenses required by law for CONTRACTOR to undertake the contract work. e. CONTRACTOR will provide written guarantee for work and materials for one (1) calendar year after acceptance by OWNER. 10. BOND - CONTRACTOR shall supply a materials, performance and payment bond(s) in accordance with Florida law and to the satisfaction of OWNER, in an amount specified in the Contract Documents. 11. MEDIATION/VENUE - The parties agree that should any dispute arise between them regarding the terms or performance of this Agreement, both parties will participate in a mediation. The parties agree to equally share the cost of the mediator. Should the parties fail to resolve their differences through mediation, then any cause of action filed hereunder shall be filed in the Circuit or County Court for Seminole County, Florida. 12. NOTICES - Any notice or approval under this Contract shall be sent, postage prepaid, to the applicable party at the address shown on the first page of this Contract. Signed, Sealed and Delivered in the presence of: Contractor: Name: Address and Telephone: Owner: City of Winter Springs By: Ronald W. McLemore City Manager 1126 East State Road 434 Winter Springs, FL. 32708 407-327-1800 A A TT ACHMENT NO. 3 MEMORANDUM FROM: Kip Lockcuff, P.E. / Utilities Director . George F. Edwards /i, Capital Projects Coordinator fJ;~ Bid Analysis, Bid # ITB'()11-99-KL AERATOR REPLACEMENT WTP #2 TO: RE: DATE: 21 June, 1999 On Wednesday, June 16,1999, the City of Winter Springs received bids for the Aerator Replacement at Wa~r Treatment Plant #2 project. Copies of the bids were supplied to my office f& review. The following is a summary of the'two responsive bidders. One additional bid was received, but was conditional therefore considered non-responsive. ,(' Contractor , Base Bid Price . r Water Equipment Services, Inc. $40,000.00 Beach ConstrLIction Co., Inc. $73,400.00 \ .-. The Engineer provided the City with a budget estimate of $48,200.00. A full bid tabulation is provided for your review. The apparent low bidder, The Crom Corporation, added a condition to the bid which rendered the bid non-responsive. Both of the other bids were complete and acceptable. Water Equipment Services, Inc. has not performed previous work for the City, therefore a review was made of the references given. The response to our questions concerning the contractor indicates that Water Equipment Services is a capable and competent contractor and will be able to perform the project work. FUNDING The bid of $40,000 was below the amount budgeted for this project in the Water & Sewer Department - 3600- Renewal and Replacement Fund account number BUDGET BID Renewal and Replacement Fund $50,000.00 $40,000.00 RECOMMENDATION: No objection to the award of this contract to Water Equipment Services can be found; therefore, it is recommended that the City enter into a contract agreement with the Water Equipment Services, Inc. for the replacement of the aerator at the Water Treatment Plant #2 in the amount of $40,000.00. IMPLEMENTATION SCHEDULE The scope of work will be completed within 90 days of the Notice to Proceed. Sent by: CONKLIN PORTER AND HOLMES To: . KIP LOCKCUFF 407 648 1036; At: 3276695 06/24/99 20:16; J~#448;Page 1/1 CPH ENGINEf:RS9 INC. II] 7 EAST ROllINSON S fREET. SUITE <; OIti.ANTXl, fl. ]280 J TeL 407-425-0452 104.x 407-MR-1036 FAX TRANSMISSION To: George Edwards, P.L ))ale: June 24. 1999 Company: City of Winter Springs .'ax II: 407-327.6695 T. M. Zaudtke, P.E., DEE Pag4:'.s: I, including this cover sheet. From: Subject: WTP 2 Aerator eN' Project No.: W0403.09 COMMENTS: In response to your inquiry on the WTP 2 aerator bid, we offer the following: 1) We have used this short fonn specification numerous times for the City of Winter Springs and there has never been a question about the insurance indemnification before this bid. We request that you have the City Attorney review this provision in light of current legal doctrine and render an opinion on whether or not the language is too broad as stated by The Crom Corporation. 2) Because Crom took exception to the in~1Jrance indemnification, we believe their bid is a "conditioned bid" and should not be accepted. We are in agreement with your assessment of the situation. Had Crom brought up this concern prior (0 the bid oepening, we could have addressed the concern and issued an addendum if required. (" SECTION 00500 AGREEMENT THIS AGREEMENT MADE THIS 28 f!t DAY OF J <.:>~ ' 1992'between the CITY OF WINTER SPRINGS of 1126 East State Road 434, Winter Spri gs, Florida 32708, Seminole County,State of Florida, herein referred to as OWNER and Water Equipment Services. Inc. of Sarasota, Florida, herein referred to as CONTRACTOR, a person duly licensed as a Contractor in the State of Florida, as follows: 1, DESCRIPTION OF WORK - CONTRACTOR shall perform the work, in accordance with the Contract Documents, of Aerator Replacement at Water Treatment Plant #2. 2. CONTRACT DOCUMENTS - The Contract Documents consist of this Agreement; all Technical, General and Supplementary Conditions and Sections contained in the Project Manual; the Drawings as listed on the Bid Form and Index to Drawings; all Addenda issued prior to and all Change Orders issued after execution of this Agreement. These form the Contract and are incorporated into this Contract by this reference. 3. CONTRACT TIME - The CONTRACTOR shall begin work within 10 calendar days after the issuance of a written Notice to Proceed and shall complete the work within 90 calendar days from the date of the Notice to Proceed. Extensions, if any, are authorized by OWNER, and may only be granted in writing. 4. LIOUIDATED DAMAGES - OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not substantially complete within the time specified in Paragraph 3 above, plus any extensions thereof allowed in accordance with the General Conditions. They also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by OWNER if the Work is not substantially complete on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER $100.00 for each day that expires after the time specified in Paragraph 3 for substantial completion has expired until the work is finally complete and the Substantial Completion Certificate has been issued and that OWNER has paid to CONTRACTOR the consideration of Ten ($10.00) Dollars as consideration for this provision. 5. CONTRACT PRICE, LUMP SUM CONTRACT - The OWNER will pay the CONTRACTOR in current funds for the performance of the work, subject to additions and deductions by Change Order, the Total Contract Price of Forty Thousand and 00/00 Dollars ($ 40.000.00 ). Payments will be made to the CONTRACTOR based on the Lump Sum Bid amount, the Schedule of Values, and subject to completion of the work, in accordance with the Contract Documents. 6. PROGRESS PAYMENTS - OWNER shall make progress payments on account of the contract price to CONTRACTOR, on the basis of application for payments submitted to the City or their authorized representative, by CONTRACTOR as the work progresses, and in accordance with the Contract Documents. Progress payments may be withheld if: (A) Work is found defective and not remedied; (B) Contractor does not make prompt and proper payments to subcontractors; (C) Contractor does not make prompts and proper payments for labor, materials, or equipment furnished him; (D) Another Contractor is damaged by an act for which Contractor is responsible; (E) Claims or liens are filed on the job; or (F) In the opinion of the City of Winter Springs, Contractor's work is not progressing satisfactorily. ( 7. FINAL PAYMENT - OWNER shall withhold up to 10% of the Contract Price throughout the project. The Owner shall release SO%of the amount witheld upon issuance of the Substantial Completion Certificate. The remaining 50% of the amount withheld shall be released with the Final Payment after the issuance of the Final Completion Certificate, OWNER shall make final payment to CONTRACTOR within thirty (30) days after the work is fully and properly completed, if the contract has been fully and timely performed, but subject to the condition that final payment shall not be due until CONTRACTOR has delivered to OWNER a complete release of all liens arising out of the contract, or receipt releases of lien fully covering all labor, materials and equipment for which a lien could be filed, or in the alternative a bond satisfactory to OWNER indemnifying him against such claims. By making payments OWNER does not waive claims including but not limited to those relating to: (A) Faulty work appearing after substantial completion has been granted; (8) Work that does not comply with the Contract Documents; (C) Outstanding claims of liens; or (D) Failure of Contractor to comply with any special guarantees required by the Contract Documents. CONTRACTOR, by accepting final payment, waives all claims except those which he has previously made in writing, and which remain unsettled at the time of acceptance of payment pursuan~ to this contract. 8. DESIGNATION OF PROJECT DIRECTOR OR ARCHITECT OR ENGINEER: DUTIES AND AUTHORITY - The duties and authority of the City are as follows: a. General Administration of Contract. The primary function of the City is to provide the general administration of the contract. In performance of these duties George F. Edwards, Capital Projects Coordinator, is the City's Project Director during the entire period of construction. The OWNER (City) may change the Project Director during the term of this contract. b. Insoections, Ooinions, and ProQress Reoorts. The OWNER shall be kept familiar with the progress and quality of the work by CONTRACTOR and may make periodic visits to the work site. The OWNER will not be responsible for the means of construction, or for the sequences, methods, and procedures used therein, or for the CONTRACTOR's failure to perform the work in accordance with the Contract Documents. c. Access to Work Site for Insoections. The OWNER shall be given free access to the works site at all times during work preparation and progress. The Project Director is not obligated to make exhaustive or continuous on site inspections to perform his duties of checking and reporting on work progress, and ani such inspections shall not waive Owner's claim regarding defective work by Contractor. d. Interoretation of Contract Documents: Decisions on Disoutes. The OWNER will be the initial interpreter of the contract document requirements, and make decisions on claims and disputes between Contractor and Owner. e. Reiection and StoooaQe of Work. The OWNER shall have authority to reject work which in its opinion does not conform to the Contract Documents, and in this connection may stop the work or a portion thereof, when necessary. f. Payment Certificates. The OWNER will determine the amounts owing to CONTRACTOR as the work progresses, based on CONTRACTOR's applications and OWNER's inspections and observations, and will issue certificates for progress payments and final payments in accordance with the terms of the Contract Documents. . ( 9. RESPONSIBILITIES OF CONTRACTOR - CONTRACTOR's duties and rights in connection with the project herein are as follows: a. Resoonsibility for Suoervision and Construction. CONTRACTOR shall be solely responsible for all construction under this contract, including the techniques, sequences, procedures and means, for the coordination of all work. CONTRACTOR shall supervise and direct the work, and give it all attention necessary for such proper supervision and direction. b. Discioline and Emoloyment. CONTRACTOR shall maintain at all times strict discipline among his employees, and he agrees not to employ for work on the project any person unfit or without sufficient skill to perform the job for which he was employed. c. FurnishinQ of Labor. Materials. etc. CONTRACTOR shall provide and pay for all labor, materials and equipment, including tools, construction equipment and machinery, utilities, including water, transportation, and all other facilities and services necessary for the proper completion of work on the project in accordance with the Contract Documents. d. Payment of Taxes: Procurement of licenses and Permits. CONTRACTOR shall secure all licenses and permits necessary for proper completion of the work, paying the fees therefor. CONTRACTOR warrants that it (and subcontractors or tradesmen, if authorized in the Contract Documents) hold or will secure all trade or professional licenses required by law for CONTRACTOR to undertake the contract work. e. CONTRACTOR will provide written guarantee for work and materials for one (1) calendar year after acceptance by OWNER. 10. BOND - CONTRACTOR shall supply a materials, performance and payment bond(s) in accordance with Florida law and to the satisfaction of OWNER, in an amount specified in the Contract Documents. 11. MEDIATION/VENUE - The parties agree that should any dispute arise between them regarding the terms or performance of this Agreement, both parties will participate in a mediation. The parties agree to equally share the cost of the mediator. Should the parties fail to resolve their differences through mediation, then any cause of action filed hereunder shall be filed in the Circuit or County Court for Seminole County, Florida. 12. NOTICES - Any notice or approval under this Contract shall be sent, postage prepaid applicable party at the address sho"Y.n on the first page of this Contract. Signed, Sealed and~Delivered in~ d<pJl~~M 1-(, C~ of W. inter~ htV k/ .-JJ~ By: Ronald W. McLemore City Manager 1126 East State Road 434 Winter Springs, FL. 32708 407-327-1800 -------~-x--.';' .".----~--------,-,-,;---.----.---;l';:Jt' I'RODUCER..C9.4ij.g23.::iiis......................FAX...C9.4'ij.gi3.::i"765.................... ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE a 1 ek Insu rance & Bonds HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR P . O. Box 20702 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. 2079 Constitution Blvd. COMPANIES AFFORDING COVERAGE Sarasota, FL 34231 COMPANY Mount Hawley Ins. Co./Agy Mkting Attn: Shell ey Dutton Ext: 307 A INSURED Water Equipment Services Inc 6389 Tower Lane Sarasota, FL 34240 COMPANY B Amerisure Insurance Company COMPANY C TIG Insurance Co./Agy Mkting COMPANY D THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. CO LTR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRAnoN : DATE (MMlDD/YY) DATE (MMlDD/YY) LIMITS GENERAL LIABILITY X COMMERCIAL GENERAL LIABILITY : A :::::::I:t...... CLAIMS MADE X OCCUR MGL OWNE~S&CONTRACTORSPROT: 0123824 03/29/1999 : GENERAL AGGREGATE : S 2 ,000 000 ............................................................................./.......... : PRODUCTS. COMPIOP AGG . S I, 000 , 000 ~ PERSONAL & AOV INJURY . S 1 000 000 03/29 /2000 :................................................................1..........1........... : EACH OCCURRENCE S I, 000 , 000 ~ FIRE DAMAGE (Anyone fire) S SO 000 ............................................................................./.....,.... : MED EXP (Anyone peI5OIl) S 2 500 B AUTOMOBILE LIABILITY X ANY AUTO ALL OWNED AUTOS SCHEDULED AUTOS HIRED AUTOS NON..QWNED AUTOS CA 1089337 GARAGE LIABILITY ANY AUTO ~ AUTO ONLY. EA ACCIDENT S :. OTHER' THAN AUTO' ONLY:" "'::!:::!:::::!:::!:::::::::::::::I:::::::::::::::::::::::I::::~:::::i:~i~:: :.....................~~~.~~.I.~~~!...S...................................., AGGREGATE S : .~~~.~~~~~~...... .......... ~ .......... .~.I. 9.9.9.1. .0.9.9.. 03/29/1999 03/29/2000 i AGGREGATE S : S : X . TORY LIMITS : ~ ER.@ffffffff:J:f::::::::::iJ:i::::J:tti 07/0 1/2000 L~~.~~.~..~~~~~~. .................~. ....... ..~.1.9.9.<>.1. 9.9.9. : EL DISEASE. POLICY LIMIT S I, 000 , 000 : EL DISEASE. EA EMPLOYEE S 1 000 000 EXCESS LIABILITY C X UMBRELLA FORM XLL38017613 OTHER THAN UMBRELLA FORM WORKERS COMPENSAnoN AND EMPLOYERS' LIABILITY B THE PROPRIETOR! PARTNERSlEXECUTIVE OFFICERS ARE: OTHER 07/01/1999 City of Winter Springs 1126 East State Road 434 Winter Springs, FL 32708 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO MAIL ....30- DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLlGAnoN OR LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE ff:FRIRItI:I_Ifi:fil\ilIiH\\i\HH\\\:\II:H::H:tt:tl::W1Mllli:::@ltlH:::::i~::Il:m:::ii:it::::i:::::lrl:i.tlt:M:t:i:;~;titli:ll~Qm~ffiffiiMi:iilt:~iiM~:1!.$1b:1w;i;~;:.:.:.:.;~x::.;:::::::.:~i.::::::;::..;:::);;,;::::.;;::;;~;::::::::::::::::;:.:(::::.:::::::;:::: ------.---,-~.,-:<'~.~' - . CU~IBERLAND CASUALTY & SURETY CO~IPANY POWER OF ATTORNEY . TAMPA, FLORIDA PRINCIPAL Water Equipment Services. Inc. EFFECTIVE DATE 6389 Tower Lane Sarasota (STREET AOORES~__u CONTRACT AMOUNT roRTY THOUSAND DOLLARS ~ (CITY) Florida 34240 (STATE) (ZIP CODE) AMOUNT OF BOND $.' 40.000.00 POWER NO.CC- :?2037 KNOW ALL MEN BY THESE PRESENTS: That the Cumberland Casualty & Surety Company. a corporation duly organized under the laws of the State of Florida. having its principal office in the City of Tampa. Florida. pursuant to the following resolution. adopted by the Board of Directors of the said Company on the 7th day of April. 1997. to wit: "Resolved that the President of the Company shall have authority to make. execute. and deliver a Power of Attorney constituting as Attorney-in-Fact. such person. firms. or corporations as may be selected from time to time. Be it Further Resolved. that the signature of the President and the Seal of the Company may be affixed to any such Power of Attorney or any certificate relating thereto by facsimile. and any such powers so executed and certified by facsimile signature and facsimile seal shall be valid and binding upon the Company in the future with respect to any bond or undertaking to which it is attached," Cumberland Casualty & Surety Company does hereby make. constitute and appoint Edward J. Valek n or SbeIIy Duttoa or KmD DIIloa or James VlIlek State of. PIorIda its true and lawful attorney(s)-in-fact. with full power and authority hereby conferred in its name. place and stead. to sign. execute. acknowledge and deliver in its behalf. and its act and deed. as follows: The obligation of the Company shall not exceed two million (S~.OOO.OOO.OO) dollars. And to bind Cumberland Casualty & Surety Company thereby as fully and to the same extent as if such bond or undertaking was signed by the duly authorized officer of the Cumberland Casualty & Surety Company. and all the acts of said attorney(s) pursuant to the authority herein given. and hereby ratified and confirmed. 1:'Ii WITNESS WHEREOF. the Cumberland Casualty & Surety Company has caused these presents to be signed by an officer of the Company and its Corporate Seal to be hereto affixed. Cl"MBERLA.~D CASl'ALTY & Sl"RETY COMPA:'IiY ~A . Edl.Jd J. Edeaftel ~ ) ) COl'NTY OF HILLSBOROl"GH) On this 7th day of April. A.D. 1997. before me personally came Edward J. Edenfield IV. to me known. who being by me duly sworn did dispose and say; that he resides in the County of Hillsborough. State of Florida; that he is President of the Cum- berland Casualty & Surety Company, the corporation described in and which executed the above instrument; that he knows the seal of said corporation; that the seal affixed to the said instruments is such corporate seal; that it was so affixed by order of the Board of Directors of said corporation and that he signed his name. thereto by like order. ) ) COl'NTY OF HILLSBOROl'GH) I. the undersigned, Secretary of the Cumberland Casualty & Surety Company, a Florida Corporation. DO HEREBY CERTIFY that the foregoing and attached POWER OF A TTOR~EY remains In full force. SiCned and Sealed at the City of Tampa. STATE OF FLORIDA SS STATE OF FLORIDA SS . BE Y A~NJER Notary Public. State of Flo da My Commission Expires Aug. . 998 No. CC 402276 Bonded Through llffi,i~1 n.l~~ ~t"i't day of .19_ 9::.1te~ ~~ ----.-----..-------..----------:-.~,,--,--T.-.n." --- ."'~-:';~W~~::_2~;:{'-- ~..~""~,7~~~ .' ... . I !.. ItII;1I0RANQUM DATE: Andrea Lorenzo - Luaces, Deputy City Clerk George Edwards, Capital Projects Coordinator Documentation for Project #011-99 Aerator Replacement - Water Treatment Plant #2 August 4, 1999 TO: . FROM: RE: Transmitted herewith are the following executed documents for your files: 1) Notice of Award 2) Agreement 3) Notice to Proceed 4) Certificate of Liability Insurance 5) Performance and Labor and Materials payment Bonds