Loading...
HomeMy WebLinkAboutPrime Construction Group, Inc. - Moss Road Bridge Improvement Change Order #2 1998 06 15 C!,e'A CONTRACT CHANGE ORDER Change Order No. 2 Engineer Project No. _ W0450.01 Project Title:-. .- City_ f inter Springs Moss Road Brid g Improvements Contractor: Prime, Construction Grou Inc. _ Reason for Change: Construction Methods Change due to High Creek Flow Conditions Breakdown of Proposed Changes and Basis for Pant (Includes pertinent drawings, specifications, and documentation where necessary) Item No. and Description Change in Contract Cost+(-) 1. Costs for constructing and maintaining bypass channel required due to high creek flow. Labor $4,012.12 Equipment $5,102.75 Pumps and Fuel $3,126.13 (1) Total Proposed Change in Contract Cost+(-) $_ITITr12 241.00 (2) Original Contract Price $ 338 700.00 (3) Total All Previous Change Orders $^ 21,628.00 (4) New Contract Price (Total of Items 1, 2 and 3) $ 372 569.15 Recommended By Engineer: Dater It m'59$ Accepted By Contractor: Date: Accepted By Owner: _ Date: W0450012cha - ---- -- _ .. IIV.JJl r.a,Q MY OMIN MR SPRINGSCItY of Winter Springs Project# 7 IMP10ua14 6. 83% L5#7W Improvements CPA .4w .Q%Change Order#2 Description pate #Men #Hours Total Worked on opening and closing valve on Pump#2 discharge. 11/11/97 2 10 20 Vied using City's hydrauifc pump to open oheck valve. Mefterial: 8x4 flanges to connect pump: No Charge City brought jet pump, opened check valve but could not 11112/97 2 3 6 close it. Went to City at 1:00 PM to discuss problem. Worked on locating FM and bypass connection to FM, 11/13/97 2 6 16 Removed every other bolt on 12"discharge valves. 11/13/97 2 2.5 5 Cut SS rods for owner furnished valves, helped set up hydraulic 11/14/97 4 4 16 pump, removed 12"gate valves, cleaned and scraped flange faces of City furnished valves, Removed two(2) 12" suction valves and prepped 6"plug 11/17/97 4 3 12 valves and installed. TOTAL LABOR 75 75 hours Labor(including burden) @$15.00/hr $ 1,125.00 Filler Flanges $ 219.00 Bypass Pump $ 580,00 $ 1,924.00 Contractor's Fee 15% $ 288.60 $ 2,212.60 Bond Premium $ 26.55 Total Adjusted Cost to Install New Valves on Suc/Discharge $ 2,239.15 Plus Electrical upgrades including new circuit, new lighting wiring $ 1,760.00 and conduit with recepticies and refeeding existing fan. TOTAL.CHANGE ORDER#2 $ 3,999.16 C 1,A a is CONTRACT CHANGE ORDER Change Order No. .. 2 _ Engineer Project No. ....W0450...01 Project Title:_ City of Winter S �rin ys Moss Road Bridge Im overnent -., Contractor: Prime Construction Group Incmm.—,.........IT.. Reason for Change: Construction Methods Change due to Hi i Creek FlowConditions Breakdown..of Proposed Chan-es and Basis for Pa ment (Includes pertinent drawings, specifications, and documentation where necessary) Item No. and Description Change in Contract Cost+(-) 1. Costs for constructing and maintaining bypass channel required due to high creek flow. Labor $4,012.12 Equipment $5,102.75 Pumps and Fuel $3,126.13 (1) Total Proposed Change in Contract Cost+(-} $ 12,24.100 (2) Original Contract Price $, 338 700.00 (3) Total All Previous Change Orders $ 2L628.00_._.._..-_,.. (4) New Contract Price (Total of Items 1, 2 and 3) $ 372,,569.15. Recommended By Engineer: Date 1t89$ Accepted By Contractor: �amm Date: , 1 Z $ Accepted By Owner: ' Date: W0450012cha !'.G,G City of Winter Springs Project# CLyrr 9MI S'nV.I W•iIKRp01111lF=N3% L5#7W Improvements CPA AMI04433.Q% Change Order#2 Description Date #Men #Hours Total Worked o oopening and closing valve on Pump#2 discharge. 11/11/97 2 10 20 Tried using City's hydraulic pump to open check valve. Material: 8x4 flanges to connect pump: No Charge. City brought jet pump, opened check valve but could not 11/12/97 2 3 6 close it. Went to City at 1.00 PM to discuss problem. Worked on locating FM and bypass connection to.FM.. 11/13/97 2 8 16 Removed every other bolt on 12"discharge valves. 11/13/97 2 2.5 5 Cut SS rods for owner furnished valves, helped set up hydraulic 11/14197 4 4 16 pump, removed 12"gate valves, cleaned and scraped flange faces of City furnished valves. Removed two(2) 12" suction valves and prepped 6"plug 11/17/97 4 3 12 valves and installed. TOTAL LABOR 75 75 hours Labor(Including burden) @$15.00/hr $ 1,125.00 Filler Flanges $ 219.00 Bypass Pump $ 580,00 $ 1,924.00 Contractor's Fee 15% $ 288.60 $ 2,212.60 Bond Premium $ 26.55 Total Adjusted Coat to install New Valves on Suc/Discharge $ 2,239.18 Plus Electrical upgrades including new circuit, new lighting wiring $ 1,760.00 and conduit with recepticles and refeeding existing fan. TOTAL CHANGE ORDER#2 $ 3,999.16 I i I