Loading...
HomeMy WebLinkAbout2016 10 24 Consent 302 East Water Reclamation Facility RepairsCOMMISSION AGENDA ITEM 302 REQUEST: Informational Consent X Public Hearings Regular October 24, 2016 KS KL Regular Meeting City Manager Department The Utility Department requesting approval for The Huntington Company to perform repairs at the East Water Reclamation Facility in the amount of $68,953 plus a 20% contingency. SYNOPSIS: This project consists of performing repairs to wastewater treatment plant at the East Water Reclamation Facility (WRF) on Winter Springs Boulevard which includes taking the plant out of service, removing accumulated debris, structural repairs to support ring and walls, weir replacement, and additional influent trough repairs. CONSIDERATIONS: This project is needed to rehabilitate the wastewater plants at the East WRF. The two steel treatment plants were built in 1972 and 1989 in a ring steel configuration which provides aeration, clarification, and digestion of the wastewater. The highly corrosive environment has deteriorated much of the steel structure requiring periodic welding to reinforce the structure as needed. In addition, recent FDEP inspections performed in conjunction with our operating permit renewal mandated some of these repairs be completed by April 1, 2017. Consent 302 PAGE 1 OF 3 - October 24, 2016 Crane to remove surge tank debris Weir plate replacement and installation Structural tank ring replacement Replace retaining walls Replace Influent Trough 20% contingency $2,354 $9,676 $20,685 $21,896 $14,342 $13,791 $82,744 The Huntington Company of Altamonte Springs performs this type of work and has completed similar type of work for us in the past. Other vendors were contacted and declined interest in this specialized scope of work. Huntington's proposal for the scope of work is $68,953. A 20% contingency is requested due to the likelihood that additional problems will be identified for repair when the plant is removed from service. No disruption of wastewater service is anticipated during this project which should be completed 30 days after commencement. FISCAL IMPACT: The project cost is $68,953 plus a 20% contingency funded by the Utility Enterprise Fund Capital Improvements line code. Consent 302 PAGE 2 OF 3 - October 24, 2016 COMMUNICATION EFFORTS: This Agenda Item has been electronically forwarded to the Mayor and City Commission, City Manager, City Attorney /Staff, and is available on the City's Website, LaserFiche, and the City's Server. Additionally, portions of this Agenda Item are typed verbatim on the respective Meeting Agenda which has also been electronically forwarded to the individuals noted above, and which is also available on the City's Website, LaserFiche, and the City's Server; has been sent to applicable City Staff, Media/Press Representatives who have requested Agendas /Agenda Item information, Homeowner's Associations/Representatives on file with the City, and all individuals who have requested such information. This information has also been posted outside City Hall, posted inside City Hall with additional copies available for the General Public, and posted at six (6) different locations around the City. Furthermore, this information is also available to any individual requestors. City Staff is always willing to discuss this Agenda Item or any Agenda Item with any interested individuals. RECOMMENDATION: Staff recommends the City Commission authorize The Huntington Company to perform repairs to the East WRF at a cost of $68,953 plus 20% contingency for a total authorization of $82,744 payable from the Utility Enterprise Fund Capital Improvements line code and authorize the City Manager and City Attorney to prepare and execute any and all applicable documents. ATTACHMENTS: None Consent 302 PAGE 3 OF 3 - October 24, 2016