Loading...
HomeMy WebLinkAboutCollage of William & Mary Commission Chamber Upgrade Project -2006 04 17 April 4, 2006 City of Winter Springs Information Services Department 1126 East S.R. 434 Winter Springs, FL 32708 Joanne Dalka Information Services Director Dear Ms. Dalka, As per our conversation, please accept this letter as an agreement for the performance of duties for the Winter Springs City Commission Chamber upgrade project. I have broken the project into three phases, as listed below, along with estimates as to time needed to complete each phase. Phase I Deliverables: I. Consultant will research and create concept drawings based, on staff interviews, to determine final objectives. 2. Upon completion and approval, a final set of system drawings will be created for distribution with the LT.B. (Invitation to Bid) package. Considerations: Audio Systems inputs/outputs (including existing system) Video Systems inputs/outputs (including existing system) Lighting Systems Electrical Systems Document Camera System Estimated Hours: 35 Expected Not to Exceed: 45 Phase II Deliverables: a) Consultant will prepare LT.B. document to include the following: . Systems Drawing . Equipment List · Technical Specifications for the Project . Training Requirements b) Consultant will be available to provide technical clarification to prospective bidders as Page 2 required in mandatory pre-bid conference meeting at pre-determined date/time. c) Consultant will assist City in evaluation of bids received. d) Consultant will prepare brief write-up recommendation for Commission on selected vendor. Estimated Hours: 10 Expected Not to Exceed: 20 Phase III Consultant will act as Project Manger to assure the following: 1) Compliance with I.T.B. 2) Assure installation is consistent with industry standards 3) System performs to Manufacture Specifications 4) Assure Proper System Documentation delivered. 5) Assure as-builds received for building changes. 6) Assure all Cabling labeled and documented Estimated Hours: To be Determined Expected Not to Exceed: To be Determined Services will be billed at an hourly rate of $100 on an as used bi - weekly basis and should be processed thru: The Collage of William & Mary Courtroom 21 Project P.O. Box 8795 Williamsburg, VA 23187-8795 Fax (757) 221-3708 , Signed 'f -/g /C1? Date ( John B. Byram ~lO~~ Joanne Dalka City of Winter Springs Signed 'f- 17 -0 ~ Date